A swim spa in the four-metre class is one of the easiest ways to give a villa, boutique hotel or resort compound an all-year wellness amenity without the footprint and excavation cost of a full swimming pool. The Outdoor Swim Spa WS-S04 sits in exactly that band, and it is one of several configurations in our configurable outdoor swim and hydrotherapy range. Because the specification sheet for units like this can look similar from supplier to supplier, buyers usually need a structured way to tell real differences apart before they place an order. The checklist below follows the fields we are asked about most often on project enquiries.

Start with the shell dimensions, not the model number

Model codes in our range are internal references; two codes that look close can describe very different shells. Catalogue dimensions for WS-S04 are 4090 x 2200 x 1110 mm (length x width x depth). Depth is the number that decides how the unit is actually used, and it is the field most often overlooked by buyers comparing prices online.

Within the same S04 family the depths diverge sharply. Outdoor Swim Spa WS-S04B is listed at 3900 x 2200 x 1450 mm, a deep hydrotherapy shell that suits seated soaking and massage sessions. Outdoor Swim Spa WS-S04X is listed at 3990 x 2260 x 950 mm, a shallower and wider shell that works better where children or older guests will use the water. Ask the supplier to state length, width and water depth separately, and check each against your deck opening and finished floor level before you compare quotations.

Count pumps, jets and water columns as a system

The jet count printed on a datasheet says little on its own. WS-S04 is listed with 3 water pumps, 1 filter pump, 26 jets plus 4 water columns, 3 LED lights with 18 small LED lights, and a total power figure of 8.25 kW. The same fields for the two related shells read differently: WS-S04B shows 31 jets with 6 water columns, 2 LED lights with 28 small LED lights and 10.35 kW; WS-S04X shows 85 jets, 1 LED light and 8.85 kW.

Those differences are the point. A higher jet count is not automatically better for your project — it changes pump load, seating layout and how the water feels to a guest. For procurement purposes, request the pump quantity and rating, filter pump duty, jet layout drawing and total connected load together as one package. Then confirm which items are included in the quoted price and which are optional, because our catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options whose availability and compatibility vary by model.

Confirm the electrical and siting reality early

Total power on a datasheet is a starting point for coordination with the site electrician, not a finished design. For any project order we ask buyers to confirm included equipment and electrical requirements for the selected configuration: supply voltage and phase, dedicated circuit sizing, earthing and protection devices, the routing of power and control cabling from the plant location, and how the unit will be accessed for maintenance once the surround is built. Insulation and steps are listed options in our catalogue, but whether they are needed depends on the local climate and on how the deck has been designed.

Where a project requires compliance evidence for the destination market — electrical certification, structural certification or local registration — request that documentation from the supplier in writing before production. Do not assume that a specification published on a website covers the requirements of your jurisdiction.

Compare what happens after the shell leaves the factory

A swim spa is a poor purchase if it arrives without the rest of the outdoor room around it. Poolside loungers, shade structures, pergolas and wet-area finishes are usually ordered on separate purchase orders from separate suppliers, and that is where schedules slip. We supply outdoor furniture for villas and resorts alongside swimming pools and swim spas, which lets one specification set, one production window and one shipment cover the whole pool deck. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, so the spa and its surrounding furniture travel together rather than arriving on different dates.

For buyers running a wider fit-out, the same coordination logic applies to the bathroom fixtures, lighting and wall finishes that sit near the spa. Grouping those categories under one turnkey interior project solution reduces the number of interfaces your site team has to manage.

A short pre-order checklist

  • Length, width and water depth for the exact configuration, checked against the deck opening and finished floor level.
  • Pump quantity and rating, filter pump duty, jet layout drawing, and total connected load as one combined document.
  • A written list of what is included versus optional: control system, UV sterilization, heat pump, sand filtration, insulation, steps.
  • Electrical supply assumptions, protection devices and maintenance access routes agreed with the site electrician.
  • Packaging, container loading plan, shipping terms and delivery address confirmed in writing.
  • Installation support, inspection and spare-parts arrangements defined before production starts.

Putting it together

Buyers who compare outdoor swim spas on jet count alone usually end up with a unit that does not match the way their guests will use it. Compare shell dimensions first, then read pumps, jets and power as one system, then confirm what the supplier handles from production through to delivery and installation. If you are sourcing WS-S04 or another configuration in this range for a villa or hospitality project, send us the site drawings and we will confirm the specification, options and shipping plan for that configuration.

Talk to our project team about outdoor swim spa configurations for your villa or resort: Phone / WhatsApp +86-13928214007 (PHILLIP), Email santerson@qq.com.