A stone or marble feature wall only looks right on site once the slab pattern, panel size and fixing detail have been agreed in advance. That is why a quotation request for Santerson Stone & Marble Panels needs more than a room name and a photo of a finish you like. The information you send in the first message decides whether you receive a comparable price in a few days or spend several weeks answering the same questions again. Below is the practical checklist we use when preparing a made-to-measure wall panel quotation.

What a Stone and Marble Panel Quotation Actually Covers

Our stone and marble panels are made to measure rather than stocked in fixed sizes. Finish, layout and dimensions are set for each space, so the price is built up from the material you select, the size of every panel, the edge and joint detail, and how the panels are packed and shipped to your project. That applies whether the panels sit in a wall system or form part of custom partitions and panelling, and it also covers matching stone & marble surfaces used on bathroom vanities and countertops in the same project.

Because nothing is off-the-shelf, a quotation request that only says "30 square metres of marble look" cannot be answered accurately. Two projects with the same area can need very different amounts of cutting, reinforcement, protective interleaf packaging and container space.

Information to Send Before We Can Price the Job

Send these items together in one enquiry. A drawing is not required at the start; a set of measured photographs of each wall is often enough for an initial figure.

ItemWhat to includeWhy it changes the price
Location and room typeProject address, indoor or external wall, hotel, villa, office or apartment, and the country of deliveryDetermines packaging strength, panel weight limits and freight method
Wall dimensionsTotal length and height per wall, plus a sketch or photos with measurements markedSets panel count, cutting loss and whether large-format panels can be handled on site
Panel layoutPreferred joint direction, joint width, feature area boundaries, and any niche, mirror or door openingLayout complexity drives fabrication time more than area does
Material and finishStone or marble type, surface finish (honed, polished, textured), colour range and the sample or reference image you are working fromMaterial selection and slab matching are the largest single cost element
Edge and corner detailBullnose, mitred external corner, square edge, or a metal trim you intend to supply locallyFinished edges are priced per linear metre
Substrate and fixingExisting wall build-up, whether a batten frame or backing board will be installed by others, and the fixing system you expectAffects panel thickness, weight and whether extra support is required
Services around the panelsWhether lighting, switch cut-outs or integrated cabinet fronts share the same wallCut-outs and coordination with other trades must be shown on the shop drawing
Quantity and timingNumber of walls or units, required delivery date and preferred IncotermsInfluences production slot, consolidation with other goods and shipping option

The Quotation Path Step by Step

1. Send the brief

Email your measurements, reference images and the list above to us. If you are also sourcing cabinetry, doors or lighting for the same building, mention it in the enquiry — as a one-stop furniture and building materials supplier we can group several trades into one production schedule and one shipment, which is usually where the real saving appears.

2. Clarification round

We review the drawings and come back with specific questions: slab batch, joint detail, tolerance on openings, and who installs. Expect one or two short exchanges; this is where an unclear brief normally costs time.

3. Priced proposal

You receive a line-by-line quotation: panels by size and finish, edge work, any cut-outs, packing, and freight to the delivery point you specified. Prices are stated for the configuration described, so compare quotations on scope rather than on the headline total.

4. Sample and confirmation

Before production you confirm the material sample, the shop drawing with final dimensions, and the written specification. This signed-off record is what we manufacture against, and it protects you if a later wall on the same project needs to match.

5. Production and shipment

Once confirmed, panels are fabricated, inspected and packed for the agreed freight route. Our logistics service covers sea, air and rail forwarding with the paperwork handled on our side; delivery terms and transit arrangements are confirmed per project rather than quoted as a fixed promise.

Where Flexible Stone Alternatives Change the Calculation

Not every feature wall needs solid stone. Where the design includes curves, arches or an existing façade that cannot take additional weight, our MCM flexible travertine stone veneer reproduces the hole texture of natural travertine in a thin, bendable sheet that wraps curved surfaces and can be cut on site without heavy equipment. The same principle applies to our flexible wood grain cement wall panel, a mineral decorative sheet with a moulded timber surface that rolls up for delivery and takes paint on its raw white face. Quoting these materials follows the same checklist, but you should also state the curve radius and the substrate condition.

For external facades and curtain wall in commercial buildings, aluminium honeycomb panel with a stone finish keeps large panels flat and light while providing weather resistance; it is a different product family from interior marble panelling, so tell us which one you are pricing rather than assuming they are interchangeable.

Questions Worth Asking Before You Accept

  • Which exact material and finish does the price refer to, and is a physical sample included before production?
  • Does the quoted area include cutting waste, corners and openings, or are those measured separately?
  • What tolerance is allowed on site dimensions, and who re-measures if the wall build-up changes after the order?
  • Is the fixing system and any backing frame inside or outside the quotation?
  • How are panels identified for installation, and is an installation drawing provided?
Please note: dimensions, material grades, technical performance and applicable local requirements must be confirmed for your specific project before ordering. This article explains how to prepare a quotation request; it does not state guaranteed lead times, delivery periods or compliance certifications.

Ready to Price Your Wall

Send us your wall measurements, reference finishes and delivery location, and we will return an itemised quotation for stone, marble or flexible panel options. If the panels are part of a wider fit-out, our custom & OEM service covers bespoke material finishes and textures alongside cabinetry, doors and joinery for the same building. Contact us to start the drawing review, and we will confirm which panel family suits each wall before pricing.