A single line in a sanitary ware schedule can decide whether a bathroom fixture lands cleanly on site or sits in a crate for six weeks. When the item is a statement piece such as the Freestanding Pedestal Basin 1050B, the brief has to carry more than a model number: it needs the mounting logic, the drainage assumption, the matching series parts and the finish reference that keeps a villa master bathroom or a boutique hotel restroom consistent from sample approval through handover.
Below is how we read that particular fixture as a procurement item, and what a specification should state so that the manufacturer, the design team and the installing contractor are all working from the same sheet of paper.
Why the freestanding format changes the brief
A freestanding stand basin is not a vanity unit with a bowl on top. The 1050B stands on its own tapered ceramic body and is secured to the wall through back panel reinforcement, which means there is no cabinet underneath to hide pipework, no counter to set a tap deck into, and no carcass carrying the load. That single structural decision drives four separate line items in a procurement brief:
- Support condition. The wall behind the basin has to take the back panel fixing. Specify whether that wall is masonry, framed stud with backing, or an existing surface being refurbished, because the fixing detail differs and the chase for the waste has to be planned before the wall is closed up.
- Tap hole arrangement. The basin is supplied with a reserved tap hole for a single lever faucet. If the design calls for a deck-mounted pair of taps or a wall-mounted spout, that has to be resolved at the sample stage rather than on site.
- Waste and trap exposure. With no cabinet below, the visible waste is part of the appearance. State the trap type and whether an exposed chrome bottle trap is acceptable in the design intent.
- Cleaning access. The base sits on the finished floor level. Floor finishes must be laid to a level that lets the pedestal seat properly, which is a coordination point with the tiling package.
What to put in the specification line
A usable entry in a bathroom sanitary fixtures schedule reads like an instruction, not a wish. For this fixture we would write it out as follows:
| Field in the brief | What to state |
|---|---|
| Model and series reference | 1050B, Luxury Gold Line collection. Reference the full series name so the supplier knows the gold line accent is intended and not an optional add-on. |
| Material and finish | Vitreous ceramic with glossy glaze; gold line decoration. Ask for the glaze sample to be approved against the bathroom's other white surfaces, since brightness differs between ceramics suppliers. |
| Mounting | Freestanding body, fixed to wall by back panel reinforcement. State the wall build-up and the position of the reinforcement. |
| Faucet provision | Reserved tap hole for single lever faucet. Name the faucet model at the same time so the spout reach is checked against the basin depth. |
| Quantity by room type | Count by bathroom type on the schedule, not by floor. Guest powder rooms and villa feature bathrooms often take different basins in the same project. |
| Matching parts | List the other 1050 items used in the same building so the gold line detail is consistent throughout. |
| Spare allocation | For hospitality work, hold spare units against future replacement. State the percentage at order stage, when the container is being consolidated. |
Keeping the 1050 series consistent across a project
The 1050B is one part of a matched set, and the value of specifying it as a set is that the gold line accent, the glaze brightness and the silhouette language carry from room to room without anyone having to re-judge them. The related items we would put in the same schedule block are:
- Washdown One Piece Toilet 1050A — one-piece construction with a square silhouette, offered with P-trap and S-trap rough-in options. Note which drain type each bathroom has before ordering; the two options are not interchangeable after the waste is set.
- Wall Hung Ceramic Basin 1050WB — a compact wall-mounted option for secondary bathrooms and hotel guest powder rooms where the freestanding format would crowd the room.
- Wall Hung Ceramic Basin 1050WC — a tall vertical wall basin used as a feature sink, often in corridors, lounge restrooms or villa cloakrooms where the fixture itself is the decoration.
Mixing formats within one series is usually the right call. A freestanding basin reads well in a master bathroom with floor area around it; the same body dropped into a small guest WC looks cramped, and the wall-hung members of the collection solve that without breaking the visual set.
Sample approval before the container is booked
For any project ordering matched sanitary ware across multiple room types, we recommend a physical sample stage rather than relying on photography. Three things come out clearly only in the hand: how the gold line reads under the actual bathroom colour temperature, whether the glaze sits at the same brightness as the tiles and shower tray already selected, and how much of the pedestal is visible once the floor finish is built up.
Where a project also needs non-standard work — a different tap hole arrangement, a custom finish, or quantities that do not fit catalogue packing — our custom furniture materials and finishes service covers bespoke finishes and prototyping alongside standard production. Confirm the options available for your specific order at quotation stage.
Buying sanitary ware as part of a wider fit-out package
Ceramics rarely arrive alone. On villa and hospitality work, basins and WCs are consolidated with vanities, shower systems, lighting, wall panels and flooring into one shipment, which is where the practical advantage of a single turnkey interior project solution supplier becomes obvious: one packing list, one set of customs paperwork, one coordination thread instead of six. Our logistics scope covers freight forwarding by sea, air and rail, export documentation, container loading and door-to-door delivery; import terms, duties and transit times are confirmed per project rather than assumed.
The same coordination applies after arrival. Installation support, snag inspection and spare parts supply sit with the supplier who knows which rough-in condition each bathroom was built to, which is why we keep the schedule and the production record aligned through the installation and after-sales support stage.
A short checklist for the buyer
- Confirm wall construction and reinforcement behind every freestanding basin before the first fix.
- State P-trap or S-trap for each bathroom on the sanitary schedule.
- Name the faucet model at the same time as the basin, and check spout reach against basin depth.
- Approve a physical ceramic sample against the tile and shower tray finishes.
- Order the matching 1050 members of the set in the same container, plus a stated spare allocation for hospitality work.
- Re-verify nominal dimensions and rough-in against the current technical data sheet before ordering.
Send us your sanitary ware schedule
If you are pricing a villa, boutique hotel or residential fit-out and need the 1050 collection — or a mix of collections — quoted against your room schedule, send the drawings and quantities to our team. We will confirm feasibility, packing and delivery terms for your project.