A modular living system with integrated lighting is one of the easiest items in a villa or hospitality fit-out to get wrong on paper and on site. The unit arrives matching the shop drawing, but the light strips do not match what the electrician installed, the recess was set out for a different depth, or nobody confirmed who supplies the transformer. A product submittal is how you close those gaps before purchase orders are cut. Below is the package we ask project teams to build with us whenever they specify the Santerson Modular System with Lighting (Living System), item by item, so approval and production start from the same set of facts.
What a submittal actually has to do
A submittal is not a brochure. It is the document set that lets a consultant, main contractor and purchasing team sign off on one configuration out of many possible ones. For a configurable wall unit with lighting, three things have to be pinned down in writing: what the unit is made of and how it is assembled; where it sits and how it meets the surrounding build; and how its electrical parts connect to the site supply and controls. If any one of those three is missing, the drawing package will look complete while the risk simply moves downstream to installation week.
Because our living systems are made to project-specific dimensions and finish options rather than to a fixed catalogue size, we treat the submittal as the specification itself. Nothing gets manufactured until the signed pack says which modules, which finishes, which lighting circuits and which fixing method apply to your walls.
Section 1: identification and scope
Start with paperwork that leaves no ambiguity about what is being approved. This section costs minutes and prevents the most common procurement argument, which is two parties believing they bought different things.
- Project name, location, room or zone reference, and the drawing revision number the unit relates to.
- Product family and item name as it appears on our site, plus the internal item code used on the quotation and packing list.
- Quantity per room or per floor, with a note on any deliberately different variants in the same room.
- The revision date of the submittal and who issued it, so superseded packs are easy to retire.
Section 2: layout, dimensions and module make-up
Modular living systems are assembled from open display modules, closed storage modules and shelf or panel components. The Santerson Floating Modular Systems and Santerson Floor to Ceiling Modular Systems in the same collection follow the same rule: the module list is the drawing. Your submittal should therefore include an elevation for every wall the unit occupies, with overall width, height and projection marked, plus a module schedule that states what each bay contains.
| Item to state | Why it matters at installation |
|---|---|
| Overall external dimensions per wall, in the same units as the architectural drawings | Set-out and plasterboard openings are measured from these numbers, not from a render |
| Module schedule: open bays, closed cabinets, drawers, display niches | Determines which doors, hinges and runners appear on site and how many |
| Shelf positions and whether shelves are fixed or adjustable | Affects contents planning and whether items sit flush with lighting |
| Wall fixing method and substrate requirement (timber batten, steel frame, solid wall) | The lining must be built to receive the fixings before finishes are closed up |
| Clearances for skirting, cornices, architraves, radiators and switches | Clashes found in the submittal are cheap; clashes found on site are not |
| Delivery configuration: built-up or flat-packed, and largest single piece | Determines lift, stair and doorway access on the delivery day |
Section 3: materials, finishes and edge details
Name the finish the way it will be ordered, not the way it looks in a picture. A submittal that says "oak effect" cannot be checked against a delivered panel; one that names the board type, surface material and colour reference can. For living systems we typically document the carcass board, the door and panel surface (veneer, lacquer, laminate or glass), the handle or handleless detail, and any metal trim. Where a finish wraps around a corner or meets another material, include the junction detail.
- Carcass and shelf substrate, with thickness.
- Door and panel surface material, colour or grain reference, and sheen level.
- Edge treatment: matching edge band, mitred wrap or metal profile.
- Hardware schedule: hinges, runners, handles or push-open fittings, with the finish of each.
- Physical sample reference, so the delivered batch can be compared against an approved physical item rather than a screen.
Section 4: the lighting package, in electrical detail
This is where most submittals for a lit living system fall short. Integrated lighting is not one line item; it is a chain of components, and every link has to be named. Our Santerson Integrated Cabinet Lighting page states plainly that electrical specifications and compatibility must be confirmed for each cabinet design, and the same discipline applies here. For every lit zone, record the following.
| Element | What to write down |
|---|---|
| Light source type and location | Strip behind a profile, puck lights in a niche, or linear fitting in a shelf groove, with the fixture reference |
| Colour temperature and colour rendering | The value agreed with the designer, applied consistently across all lit zones on the wall |
| Output or wattage per metre or per fitting | Enough to check the light level against the intended use of the space |
| Driver or transformer rating and its location | Total load plus spare capacity, and an access panel where the driver sits |
| Voltage and control interface | Dimmable or fixed output, switch type, and whether it joins a smart lighting system |
| Cable routes and connection point | Where site wiring terminates and where the unit-side wiring begins |
| Replacement access | Which fitting can be removed for service without dismantling the module |
Two points are worth resolving in the submittal rather than on site. First, responsibility: state clearly which party supplies and installs the mains supply, isolator and wall switch, and which party supplies the unit-side lighting components. Second, commissioning: agree who tests each lit circuit after installation and what "working" means before sign-off. If the same control scheme appears elsewhere in the project, cross-reference it here so the living system is not left out of the electrician's final programming.
Section 5: coordination with adjacent work
A lit wall unit touches plasterboard, paint, flooring, electrical first fix and sometimes joinery from another trade. The submittal should show the interfaces rather than only the product. Include a typical section through the unit at the wall, plus details for where it meets floor, ceiling and any return wall, and note which side of each junction is our scope and which is the site's. Where the wall will be painted after installation, say so; where the unit installs onto a finished wall, say that instead. Both are workable, but only if decided early.
If the living system sits next to other built-in elements such as Wall Panel Systems or media wall panelling, put them on the same drawing set. Alignment of reveals and shadow gaps across two products from two suppliers is a detail that only shows up when both are drawn together.
Section 6: commercial and delivery information
The last part of the pack keeps procurement honest. Attach the quotation reference and its validity date, the confirmed lead time from approval to despatch, packaging and pallet or crate details, and the delivery address with access notes. Because we ship project furniture internationally as a furniture logistics and door-to-door delivery service, state the agreed delivery terms for this order and who handles import clearance at destination. For multi-phase projects, note which rooms are in which phase, so a partial release does not become a dispute about what was included.
Section 7: approval record and after-handover
Close the document with a signature block for the client representative, designer or consultant, and the contractor, each dated. Once production starts, changes are re-costed; a clean approval trail protects everyone. Alongside it, record what happens after handover: what is covered, how a fault is reported, and which spare components (hinges, runners, drivers, individual fittings) can be reordered later for the same configuration. Our furniture installation and after-sales support service exists for this stage, and the submittal is what makes it straightforward to match a replacement part to an installed unit years later.
A quick pre-submission check
- Elevations for every wall, with dimensions in the project's units
- Module schedule listing open, closed and display bays
- Named finishes with a physical sample reference
- Lighting type, colour temperature, output, driver rating and driver location per lit zone
- Scope split for mains supply, controls and commissioning clearly written
- Junction details at floor, ceiling, wall and adjacent joinery
- Lead time, packaging size, delivery terms and phase allocation
- Signature block with revision number and date
Sending us the pack
If you are specifying a lit living system for a villa or hospitality project, send the drawings and the room list and we will return a first submittal for your review: elevations, module schedule, finish references and a lighting schedule with driver sizing. We then revise it with your consultant until it matches the site build, and production follows the approved version. Where the unit needs to be designed around an existing wall or an unusual ceiling height, our Interior Design Services team can prepare the layout and 3D views before the submittal is issued.
Talk to us about a modular living system with lighting for your project.
SANTERSON — furniture and building materials manufacturer, China. Contact: PHILLIP. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com.
Send drawings, room list and target dates and we will return a submittal package for review.