modular system with lighting (living system)

modular system with lighting (living system)

Description

Santerson modular system with lighting (living system) is part of the Modular Living Systems collection, designed for residential living projects with project-specific dimensions and finish options.

Description

Overview

Santerson modular system with lighting (living system) is part of the Modular Living Systems collection, designed for residential living projects. Its finish, layout, and dimensions can be specified to suit each space and project.

Configuration

  • Made-to-measure sizing
  • Material and finish options
  • Layout tailored to the project

Confirm dimensions and selected specifications for each project.

Features

  • Made-to-measure sizing
  • Material and finish options
  • Project-specific layout