A floor-to-ceiling modular system looks simple on a drawing: one wall, one run of shelving and closed storage, finished to match the rest of the joinery. In production it is anything but simple. Because the unit spans the full storey height and is made to measure, every dimension, material and services decision has to be locked down before a single panel is cut. The list below covers what we ask project teams to confirm before we start manufacturing Santerson Floor to Ceiling Modular Systems, so the wall arrives on site ready to install rather than as a problem to solve.

1. The actual site dimensions, not the drawing dimensions

Modular wall systems only work when they meet the floor and the ceiling cleanly. Before production we need a set of as-built measurements taken on site, ideally after the flooring and ceiling finishes are in place or at least fully specified:

  • Finished floor level and finished ceiling level, measured at several points along the wall run rather than one spot.
  • Out of plumb walls and out-of-level floors, so scribing, packers or a shadow gap can be designed in instead of being improvised on site.
  • Skirting, architraves, cornices or recessed channels that the unit has to return around or terminate against.
  • Clear width of the run, plus any door openings, radiators, switches or air grilles inside it.

Where a project is still at concept stage, we design to the drawing dimensions and flag the tolerance points to revisit once the builder opens the wall up. That note in the file saves an expensive remake later.

2. What the system has to hold and how it will be used

The same elevation can carry books, display pieces, tableware, audiovisual equipment or light decorative storage, and each load profile changes the carcass. Tell us which of these apply, because shelf spans, panel thickness and fixing details follow from them:

  • Heavy loading such as a full library of books, where Santerson Floor to Ceiling Bookshelves detailing is the better starting point than an open display grid.
  • Digital equipment and media storage, which needs cable routes, ventilation for heat and a load path that supports the screen fixing.
  • Mixed open and closed storage, where daily-use items sit at comfortable heights and rarely used items go high.

If your wall combines shelving with full-height cabinetry, we align the module grid across both so the reveal lines read as one composition. Our Santerson Full Height Storage Walls are specified the same way, which makes it straightforward to pair a closed run with an open one in the same room.

3. Materials, finish and edge detailing

Our modular systems are made to measure, so the material set is chosen per project rather than fixed to a standard catalogue size. Confirm before production:

  • Substrate and core for the carcass and doors, selected for the room conditions it will sit in.
  • Surface finish: lacquered, laminated, veneered or textured, with a physical sample approved rather than a colour code on a screen.
  • Grain direction and book-matching where panels sit side by side, which has to be decided before nesting, not after.
  • Edge treatment and door profile, including handleless or integrated pull details if the design calls for them.

If the modular wall has to match existing or separately ordered joinery, send us the approved sample of that joinery. Matching a warm oak veneer or a matte lacquer across two suppliers' batches is a specification problem, and it is far cheaper to solve in the sample stage than on site.

4. Integrated lighting and services

Lighting is where custom modular work most often goes wrong, because the electrician's first fix happens long before the joinery drawings are final. For any lit niche, glass-front compartment or shelf edge we confirm:

  • Which sections are lit, and whether the light is a shelf-edge line, a vertical wash or a spotlight in a display niche.
  • Driver and transformer location, with access kept clear for maintenance after installation.
  • Cable entry points and switch or dimmer position, coordinated with the electrical contractor's first-fix schedule.
  • Electrical ratings and compatibility for the chosen configuration, checked against the local supply before ordering.

Where the design calls for a lit configuration, we detail it as part of the carcass rather than as an accessory added afterwards. The Santerson Modular System with Lighting pages show how integrated lighting reads once the wall is complete; the corresponding wiring and driver provisions are agreed with your team in the same drawing round.

5. Fixing method and what is behind the wall

A full-height unit needs a competent fixing substrate, and that is a builder's decision, not ours. Before production we ask which of these applies to your wall:

  • Solid masonry, timber stud or metal stud partition, each with a different anchor and batten detail.
  • Whether additional noggins or a steel backing frame are required for heavy sections or a suspended screen.
  • How the unit reacts to floor movement in a multi-storey or timber-framed building.
  • Seismic, wind or safety-fixing requirements set by the local authority or the project consultant, which we design to once they are stated in writing.

We do not certify compliance on your behalf. What we do is build to the fixing and loading requirements you specify, and provide the technical drawings your engineer needs to sign them off.

6. Division into modules and site access

A single wall can be manufactured as one piece or as several modules that are joined on site. The deciding factors are physical, not aesthetic:

  • Lift car dimensions, stair widths and corridor turns between the delivery point and the room.
  • Maximum module weight for the number of installers available on site.
  • Joint positions placed where they disappear into a reveal line rather than cutting through a lit niche.
  • Packaging and protection for glass, mirrored or high-gloss panels in transit.

Send us the access route early. A wall that has to be split into four modules instead of two changes both the joinery detail and the price, and it is much better to design for that from the start.

7. Commercial and programme points to settle in writing

Before we release an order to production we confirm the practical items that otherwise cause delays:

  • Quantities and which rooms each configuration belongs to, with a drawing reference on every line of the order.
  • Which specification revision is current, dated and signed by whoever has design authority on the project.
  • Minimum order quantity for the finish and hardware set you have chosen.
  • Delivery terms and destination, plus who receives and checks the consignment on site.
  • The inspection and sign-off point before dispatch, so approvals happen in the factory rather than after delivery.

Change orders after production starts are the single largest cause of programme slippage on bespoke joinery. Where a decision is still open, we mark it as an open item on the drawing and hold that section rather than guess at it.

A pre-production checklist you can send to your team

  • As-built dimensions signed off by the site team, including levels and plumb.
  • Approved physical sample of the finish, with grain direction noted.
  • Load schedule for each section: books, media, display, closed storage.
  • Electrical drawings showing lit sections, driver locations and control positions.
  • Fixing substrate confirmed by the builder, with backing details agreed.
  • Access route assessed, module split and weights agreed.
  • Dated specification revision, quantities and delivery destination confirmed.

If you are specifying this kind of work as part of a wider fit-out, our Interior Design Services team can prepare the layout and 3D views first, then carry the same dimensions through to production. For bespoke configurations outside the standard collections, our Custom Furniture Manufacturer service covers prototyping, material selection and finish matching so the modular wall matches the rest of the project joinery.

Send us your drawings, room dimensions and the load you expect the wall to carry, and we will come back with a build-up specification, a module split and a quotation for the configuration. That is usually enough to move from an interesting elevation to a wall that installs in a day.