A swim spa is one of the few line items in a villa or resort package that has to satisfy two very different readers at once: the design team, who care about how it looks and sits in the landscape, and the procurement or site team, who care about whether it fits through the access gate, connects to the right power supply and arrives with the correct equipment already fitted. The Outdoor Swim Spa WS-PC07ST sits in our Swimming Pools and Swim Spas range, which is configurable and therefore an advantage in a project context, but only if the brief states clearly what is standard, what is optional and what still has to be confirmed. The notes below set out how we write that section of the brief so a quotation comes back comparable and an order does not stall on site.
Why swim spas need a different brief format from furniture
When you order cabinetry or furniture from the Furniture Series, the specification is mostly descriptive: material, finish, dimensions, quantity. A swim spa is an assembly. The shell, the jet layout, the filtration circuit, the control system and the lighting are separate supply items that have to be reconciled with local electrical work, a prepared base and a drainage route. If the brief only names a model number, three things tend to happen at tender stage: bidders price different equipment sets so the prices cannot be compared; the electrical load is discovered after the base has been poured; and accessories that were assumed to be included turn into variations after award.
Writing the brief as a short list of confirmed facts, a list of options to be priced separately, and a list of site conditions to be verified removes most of that ambiguity. It also protects the buyer, because anything left unstated becomes a commercial argument later.
What the WS-PC07ST catalogue record already fixes
The published product record for this model gives a stable starting point. These are the values we quote against, and they are worth restating in your brief so that all bidders work from the same numbers.
| Item | Catalogue value for WS-PC07ST |
|---|---|
| Overall dimensions | 7000 x 2400 x 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | Not shown in the published specification block for this model; confirm as a named line item |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power | 6.55 kW |
| Features shown on the product page | Water jets, LED lighting, Ozone, Swim training system |
Two points of reading discipline matter here. First, the water pump is not shown in the published specification block for this model, so it should be quoted as a named line item rather than assumed. Second, "Total power 6.55 kW" is the figure attached to the standard configuration; if a heat pump or an additional water pump is added later, the connected load changes and the electrical design has to follow it. Put both of those statements in the brief explicitly.
Options to price as separate line items
The catalogue lists a set of options across this range. Availability and compatibility vary by model, so each one should be requested as a priced option against WS-PC07ST rather than inferred from the range in general:
- Control system variant, where a different interface or control package is preferred
- Water pump and filter pump configuration, with duty point stated
- Heat pump, sized against the target water temperature and the local ambient climate
- Ozone and UV sterilisation, requested as a combined or standalone sanitisation package
- Sand filtration as an alternative to cartridge filtration
- Insulation package, which affects both heat retention and the platform detail around the shell
- Steps and access arrangement, including whether steps are integrated or site-built
Asking for these as priced options rather than a bundled "full specification" price gives you two things: a clear base price you can compare between configurations, and the freedom to de-scope an item at value engineering without re-tendering the whole unit.
Where WS-PC07ST sits against the close variants
The same shell family is published in several configurations, and the differences are dimensional rather than cosmetic. In a tight courtyard or a terrace with a fixed envelope, that difference decides the selection.
| Model | Catalogue dimensions | Notes from the product record |
|---|---|---|
| WS-PC07ST | 7000 x 2400 x 1470 mm | Swim training system, jets, LED, ozone |
| WS-PC07ST-L | 7490 x 2400 x 1470 mm | Same feature set, longer shell |
| WS-PC07ST-S | 7000 x 2400 x 1470 mm | Adds an automatic cover option to the listed features |
| WS-PC07A | 7000 x 3000 x 1470 mm | Wider shell; no swim training system shown |
| WS-PC07A-T | 7000 x 3000 x 1470 mm | Wider shell with swim training system shown |
Read as a decision: choose WS-PC07ST when the swim lane is required but the width has to stay at 2400 mm; move to the -L variant when the length budget allows an extra 490 mm and you want a longer stroke; consider the -S variant where a cover is part of the operating plan, since it is the record in this group that lists that option; and step across to the PC07A family when width is available and a wider hydrotherapy or seating area matters more than lane length. If your project needs a shape outside these rectangular footprints, the range also includes customizable shape outdoor spa options in square, round, oval and curved layouts.
Site conditions that must be settled before order
Most swim spa disputes on site are civil and electrical, not product defects. The following items belong in the brief as buyer-provided or contractor-provided conditions, each with a named party and a date:
- Base and access. Confirm the prepared base level and bearing, then confirm the delivery route: a 7000 mm shell has to pass gates, side setbacks and any overhead obstruction on the way to the terrace or garden position.
- Electrical supply. State the available supply (single or three phase), the circuit rating and where the isolator will sit relative to the unit. The 6.55 kW figure for the standard configuration is the number your electrician designs against; re-issue it if options are added.
- Drainage and overflow. Identify the drain point and whether a pump-out arrangement is required for maintenance and winter servicing.
- Clearances and access panels. Filtration and control components need reachable service access; state the maintenance clearance you expect around the plant side of the unit.
- Water fill and chemistry. Name who supplies the fill water, who commissions the initial chemistry balance and what source water quality is expected.
Delivery, installation and after-sales scope in a cross-border package
Because these units ship internationally, the brief should also fix the commercial boundary. As a one-stop furniture and building materials supplier, we handle freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and door-to-door delivery, so the Incoterm and the delivery address must be stated in the enquiry rather than agreed after award. For a swim spa specifically, ask for the packing schedule with crate dimensions and weights, so your site team can plan the crane or forklift move from the kerb to the final position.
Installation and after-sales scope should be written as a checklist in the same document: who positions and levels the unit, who makes the electrical connection, who performs commissioning and handover training, what is covered under warranty, and how spare parts such as jets, pumps and lighting are supplied later. Where a project also includes interior fixtures or other furniture lines in the same shipment, grouping them under one coordination contact reduces the number of handovers you have to manage on site.
A short specification template you can paste into the brief
This is the structure we prefer to receive, and it usually brings a complete quotation back in one round:
- Project name, site location, and the position of the unit within the landscape plan
- Model reference and catalogue dimensions, quoted from the product page
- Standard equipment required, copied item by item (control system, swim training system, filter pump, jets, LED lighting, ozone)
- Options to be priced separately: heat pump, water pump, UV, sand filtration, insulation, steps, cover
- Electrical data available on site, including supply type and circuit rating
- Base, drainage and access arrangements, with the responsible party named
- Delivery term, destination address and required delivery window
- Installation, commissioning and after-sales support expected, versus what the site contractor will do
Send that with the drawings and we can confirm which options are compatible with WS-PC07ST, return crate dimensions for the delivery plan and flag any configuration change that affects the electrical load before production starts.
Talk to us about your swim spa line item. Send the model reference, the site conditions and the options you want priced, and we will return a specification sheet for WS-PC07ST with the compatible equipment set, crate dimensions and delivery scope for your project. Contact PHILLIP on WhatsApp +86 13928214007 or email santerson@qq.com.