Outdoor Swim Spa WS-PC07ST-S is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 7000x2400x1470mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Swim training system, Automatic cover option. Confirm included equipment and electrical requirements for the selected configuration.
Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.