A floating modular system looks simple on a mood board: wall-mounted volumes, clean shadow gaps, storage that appears to hover. On site it is one of the more demanding items in a fit-out, because the product has to agree with the wall behind it, the lighting inside it and the trade installing it. If your project is specifying Santerson floating modular systems, or an equivalent configurable wall system, the difference between suppliers shows up less in the brochure than in how each one answers a short list of practical questions.

This guide sets out those questions for commercial buyers — developers, builders, interior contractors and procurement teams handling apartment show suites, hotel guest rooms, serviced residences and office fit-outs — and explains what to ask for at quotation stage so that comparable offers really are comparable.

What a floating modular system actually covers

In the SANTERSON catalogue these systems sit in the Modular Living Systems collection alongside closed modular units, open modular units, floor-to-ceiling modular systems and modular systems with integrated lighting. The floating modular system listing describes a configurable arrangement whose finish, layout and dimensions are set per project, with made-to-measure sizing and material and finish options. A closely related floating modular shelves listing sits in the Modular Shelving Systems collection and is configured the same way.

That configurability is the point of the product, and it is also why two quotations can look identical while describing different scopes. One supplier may be pricing a run of wall-hung cabinets with carcasses, doors and shelves; another may be pricing a full composition that includes open display niches, an integrated lighting circuit and a matching panel background. Before you compare prices, fix the scope in writing: which modules are included, whether back panels and finishes are part of the unit or a separate wall line item, and where the electrical work stops and the joinery begins.

Six questions that separate suppliers

1. How far does customisation go?

Ask whether made-to-measure means height, width and depth can change, or only the module mix within a fixed grid. For commercial work — where room dimensions repeat across floors but never exactly — you want the former, together with written confirmation of the maximum unsupported span and the standard carcass depths offered. A supplier whose custom and OEM service covers design and prototyping can adjust a layout to your drawings; one working from a fixed catalogue cannot.

2. What is the wall build-up assumption?

Wall-hung units transfer load into the substrate, so the quotation should state what fixing detail applies to each wall type on your schedule: timber studs, steel studs with noggin, masonry or a backed framing system. A supplier who asks for your wall construction and ceiling heights is doing design coordination; one who does not is leaving site variation to be discovered later.

3. Which finishes, and how are they proven?

The catalogue carries lacquer, veneer, melamine, acrylic and glass-fronted cabinetry lines, so a floating system can be matched to the joinery used elsewhere in the same project. Request physical samples of the exact door, carcass and edge banding combination you are being quoted, and ask which finish is specified for high-touch areas such as guest-room wardrobes and office storage runs.

4. Is lighting integrated or added on site?

A modular system with lighting needs the driver positions, cable routes and switching resolved in shop drawings, not on site. Confirm whether the supplier supplies the profiles, diffusers and drivers, who provides the low-voltage wiring, and how a failed driver is accessed after installation.

5. How are tolerances and setting-out handled?

Ask what dimensional tolerance applies between manufactured units and finished walls, whether a site survey or setting-out drawing is required before release for production, and who signs off the setting-out. This is where interior design services earn their place: drawings, production coordination and on-site guidance are named steps in the workflow, which keeps joinery, wall finishes and lighting on one set of dimensions.

6. What happens after delivery?

For multi-unit projects, spare parts availability and a defined snagging process matter more than the headline price. The installation and after-sales support page lists on-site installation, inspection and snags, warranty coverage, spare parts or replacement and ongoing maintenance; ask which of these apply to your contract and in what territory before you commit.

Reading a quotation line by line

Scope lineWhat a clear supplier states
ModulesItemised list with sizes, open or closed configuration, door type and hardware specification.
FinishesNamed material for door face, carcass, interior surfaces and edge, with samples referenced by code.
Wall interfaceBack panels, shadow gaps, scribes and the fixing detail per wall type.
ElectricalLighting components supplied, driver locations, who runs the wiring, access for maintenance.
DeliveryPackaging, container loading plan, delivery terms and the named destination. The logistics and door-to-door delivery service covers freight forwarding, customs paperwork and shipment tracking; confirm Incoterms and duties for your port of entry.
After-salesWarranty scope, response route, spare parts availability for repeat orders across phases.

A supplier who cannot fill these rows is not more expensive or cheaper — they are simply unpriced risk. Send the same six-row template to every bidder and the comparison becomes straightforward.

Where one-stop supply helps on commercial work

Floating modular systems rarely stand alone. In a guest room or apartment show suite they sit against wall panelling, under a ceiling line, next to wardrobes and vanities in matching finishes. When the same manufacturer produces the storage wall and the surrounding finishes, one shop drawing set governs reveal sizes, material breaks and lighting coordination. SANTERSON presents itself as a turnkey furniture and building materials company for villa, hospitality and office projects, with in-house manufacturing, design coordination and door-to-door delivery — which is why these systems are often specified as part of a wider package rather than bought as an isolated item.

Before you award: confirm the configuration you are buying in shop drawings, check the fixing detail against your wall schedule, approve physical finish samples, and get the after-sales and spare-parts terms for your territory in writing. Configurable systems are defined by their selected specification, not by the collection name.

Frequently asked questions

Can a floating modular system be used in hotel guest rooms as well as villas?

The catalogue listings describe these systems for residential living projects, so confirm the intended application and duty level with the supplier before specifying them for a hospitality project. Where heavier wear is expected, ask about hardware grade and finish selection rather than assuming a residential specification carries over.

How do I compare two suppliers quoting different module grids?

Reprice both against your own room schedule: total linear metres of wall-hung storage, number of closed doors, open bays, integrated lighting points and finish area. Normalising to those quantities exposes the difference between a smaller grid with more joints and a wider grid with fewer.

Should the system be ordered with the rest of the joinery package?

Ordering the storage wall, wardrobes and vanities from one manufacturer keeps finishes, edge details and lead times aligned, and puts a single party responsible for coordination. Splitting them across suppliers usually saves on the unit price and costs more in site variations.

How do I brief a supplier so the quotation is comparable?

Send the same three documents to every bidder: your room schedule with finished wall dimensions, the wall construction schedule, and the finish palette for the project. With those in hand, suppliers can price the same scope, and any remaining differences in the offers become visible as genuine differences in service.

If you are comparing quotations for a commercial project, send your room schedule and wall construction details to SANTERSON's interior design services team and request a configuration drawing with the six scope rows above completed. That gives you an offer you can place side by side with any other bidder.