A closed modular unit looks simple on a drawing: doors, shelves, a clean front elevation. The cost and the rework usually come from what nobody wrote down - how it opens, what carries the load, where the cables go, and who signs off the finish sample. Here is the brief we ask buyers, builders and designers to send when they specify custom Santerson Closed Modular Units.
Start with the wall, not the unit
Closed modular units sit inside a room that already has constraints. Before any dimension is drawn, send us the floor plan and the relevant elevations, plus three practical notes:
- The full height, width and depth envelope you want the unit to occupy, including skirting, cornice, radiators, switches and door swings that intrude into it.
- What the wall behind is made of and whether it can carry a fixed unit. Uneven or hollow partitions change the fixing detail and sometimes the carcass build.
- Whether the unit butts into other joinery, an appliance or a floor-to-ceiling system, so we know where a scribe, a filler panel or a butt joint belongs.
Modular living systems are made to measure for each project, so a dimension taken from a single point on site is not enough. Give us the high, middle and low reading on both walls of the run; floors and ceilings in renovation work are rarely square.
Say what lives inside every compartment
"Storage" is where most change orders come from. For each section tell us:
- What goes in it - books, glassware, linen, a TV, a console, a vacuum, a wine collection.
- The heaviest item and its size, because shelf spans, shelf-pin holes and bottom panels are built around that load.
- How often it is accessed. Daily-use items get drawers or open niches; seasonal items can sit behind doors on a high shelf.
- Whether you want the contents hidden or shown. If a mix appeals, our Santerson Mixed Open & Closed Systems line covers that split in one run.
Specify the doors and how they behave
The front elevation is what people judge, and it is also where clearances bite. Please confirm:
| Item | What to write down |
|---|---|
| Door type | Hinged, sliding or a concealed handleless front; for sliding doors, the pocket or overlap you have available. |
| Swing clearance | Furniture, traffic routes and any window or door the unit's doors swing towards. |
| Handle detail | Recessed pull, integrated lip, push-to-open, or a metal profile - and whether hardware must match other ironmongery in the project. |
| Grain direction | Which way the veneer or grain runs across doors. State it once on the elevation; do not leave it to be noticed at handover. |
Deal with power and light in the brief
A closed unit that hides a router, a TV or a charging drawer needs a cable route decided before the carcass is cut. Tell us what equipment sits inside, where its sockets must land, and whether vents are needed. If you want interior lighting, decide now between shelf-mounted strips, vertical profiles or rear-panel wash - and who supplies the driver and where it stays reachable for servicing. For lit configurations see Santerson Modular System with Lighting (Living System); lighting and electrical details are confirmed against the chosen configuration rather than assumed.
Name the finish, then approve a sample
Send the finish as a reference you can point at - a physical sample, a manufacturer code, or an existing item in the property to match. Paint colours need the sheen level as well as the colour; wood veneers need the species, cut and grain pattern. A signed-off sample board is the cheapest document in the project, because it settles gloss, edge banding and door-to-carcase colour before panels are machined.
State the delivery and installation reality
Include these in the same email as the drawings:
- Project address, floor level, lift or stair dimensions, and any restricted delivery hours - they decide whether a unit arrives assembled or in sections.
- Who installs. Our services run from design consultation and production through door-to-door logistics to installation support, so tell us which stages you want us to cover and which your own trades handle.
- The trade sequence around the unit: flooring, decoration, electrical first fix, then joinery. A wrong order costs a second visit.
- The handover standard you expect - levelled and scribed, silicone removed, doors adjusted, snags listed.
A short brief template that works
Paste this into your enquiry and fill the blanks. It takes ten minutes and removes most of the back-and-forth:
Project: address, room, single unit or repeat units per floor.
Envelope: width / height / depth with high-low readings; obstructions listed.
Internal plan: compartment by compartment - contents, weight, access frequency, drawers or shelves.
Front: door type, opening direction, handle detail, grain direction.
Services: equipment inside, socket positions, ventilation, lighting type and driver location.
Finish: reference supplied, sample approval required, sheen level.
Delivery: access notes, installation responsibility, target on-site date, handover standard.
Send it to us
If you are furnishing a villa or residential project and want the modular run quoted properly the first time, send the brief above with your drawings. As a China furniture and building materials manufacturer working on residential and hospitality projects, we quote from the information you give us - so the more specific the brief, the closer the price and the finish will be to what you pictured.