A swim spa quote is rarely wrong about the shell. It goes wrong on everything around it — pump set, jet count, power supply, base preparation and what arrives in the container. This guide shows buyers, builders and project managers how to read a manufacturer's proposal for a luxury outdoor swim spa with massage jets, LED lighting and water features, line by line, before a deposit is paid.
What You Are Actually Buying
An outdoor swim spa is a small factory-built vessel that has to behave like three machines at once: a swimming channel you can train against, a hydrotherapy area with jets aimed at the right muscle groups, and a water-treatment loop that keeps the water clear between uses. The acrylic shell gets most of the attention in a proposal because it is the part you can see in the photograph. The parts that decide whether the unit still performs well in year five are the cabinet structure behind it, the pump arrangement inside it, and how cleanly the electrical supply has been planned around it.
SANTERSON's luxury outdoor swim spa with massage jets, LED & water features is described on the product page as combining an acrylic interior, a reinforced cabinet and a high-performance water system in one vessel. That is a reasonable way to group the specification, and it is also the order in which you should audit any proposal: shell first, then structure, then water system.
Read the Shell and Cabinet Section Before the Feature List
Ask what the shell material actually is, and what supports it. An acrylic interior is a common specification because it repairs well and holds colour, but an unsupported acrylic shell will flex under load and transmit that movement into the jet plumbing. Look in the proposal for a separate line covering the cabinet or reinforcement — steel frame, galvanised or stainless members, sealed base, moisture management in the equipment cavity.
One product page in the same range states a #304 stainless steel metal frame with a sealed base and a moisture-free cabinet layout. Treat that as a specification to confirm for your model rather than a blanket claim across the catalogue; the frame material and the sealing detail should appear on your quotation by name, with the fasteners and access panels described.
- Shell: acrylic grade, thickness, gel-coat or finish system, colour options, repair policy for transit damage.
- Support structure: frame material and grade, whether it is welded or bolted, corrosion treatment.
- Insulation: panel type and where it is fitted — under the lid, around the cabinet, beneath the base. Insulation is usually an optional accessory, not standard.
- Access: how a service technician reaches the pumps and filter without removing cladding.
Decode the Pump Set and Jet Layout
Jet count is the number most buyers compare first, and it is the least useful figure on its own. Sixty jets can be a serious hydrotherapy layout or sixty small air-assisted outlets sharing one pump. What you need in writing is how many pumps there are, what each pump drives, and whether jet positions are drawn against seating.
The catalogue makes this easy to check because the specification blocks list pump quantities per model. On WS-S08B, for example, the listed arrangement is four water pumps and two filter pumps driving 98 jets across a 7800 × 2200 × 1500 mm cabinet, with seven LED fittings plus 46 small LED lights, at a total connected power of 14.6 kW for that configuration. Compare that with WS-PC05ST, a 5000 × 2400 × 1470 mm swim-and-spa configuration with one filter pump, six jets listed and a dedicated swim training system at 6.55 kW. Same catalogue, two completely different briefs: one is a massage-led vessel, the other is a training-led vessel that also takes a soak.
So before you accept a jet count, confirm in writing:
- Pump quantity and duty — which pump feeds the jets, which feeds filtration, whether a blower is included or optional.
- Jet types and positions — water jets, water columns, air jets — shown on a dimensioned layout keyed to the seating and recline positions.
- Filtration cycle — filter pump flow rate, run hours per day, and whether sand filtration is offered as an upgrade.
- Water treatment — ozone is listed across the range; UV sterilisation appears as an option. Ask which is included in your price.
Check the Water Features and LED Specification Separately
Water features sell the vessel but they also add pumps and plumbing runs, so they belong on their own line in the proposal rather than hidden inside "features included". Some models list a waterfall and four water columns as standard equipment — WS-S07M is one such model at 7000 × 2200 × 1480 mm — while others list only plain water jets. Ask specifically which features are fitted, and whether each feature has its own pump or shares one with the jet circuit.
The same care applies to lighting. "LED lighting" in a specification block can mean four colour-change fittings or one fitting plus 50 small point lights. Both patterns appear in this catalogue, and the counts differ from model to model. Ask for the fitting count, whether the fixtures are replaceable from outside the cabinet, and what control you get — a single on/off circuit or a colour and scene controller.
Match Dimensions to the Site, Not the Other Way Around
The swim spa range spans roughly three metres of footprint at one end to more than eleven metres at the other, which means length is a site decision before it is a preference. A 3880 mm unit such as WS-115AⅢ can sit on a terrace; an 11740 mm vessel such as WS-S12-T needs a long run of deck and, more importantly, a delivery route that can get it there.
Send the manufacturer your site drawing with three numbers marked: clear internal length and width where the unit will sit, the finished height you want above deck level, and the widest opening on the delivery path. Depth matters more than it looks in a photograph — shallow models around 900 to 1100 mm suit families and children; deeper shells around 1450 to 1600 mm suit lap swimming and full-immersion soaking. Ask for the water line, not just the shell height.
| Intended use | What to look for in the proposal |
|---|---|
| Daily lap training | A named swim training system listed as included, with its own nozzle or jet pump; shell length at 5000 mm or more for usable turn-around. |
| Massage and recovery | Higher jet count driven by multiple water pumps, jets positioned against seated and reclined postures, waterfall or water columns as separate line items. |
| Family and resort leisure | Shallower shell, steps included, handrail positions, and a filtration cycle sized for intermittent high bather load. |
| Villa project with outdoor living | Cabinet finish coordinated with the deck palette, plus matching poolside furniture specified in the same order. |
For that last case, it is worth putting the swim spa and the surrounding outdoor furniture for villas and resorts on one purchase order. The poolside ranges in this catalogue — sling sun loungers with adjustable backrests, aluminium lounge sets, dining sets with teak-look slats — list customisable frame colours and finishes, so ordering the vessel and the deck furniture together gives you one finish reference to approve and one shipment to track.
Verify Power, Insulation and Running Assumptions
Total power is listed per model in this catalogue and it moves a long way across the range: around 2.45 kW on the shallow WS-PC04CH, around 6.55 kW on the training-led PC-series units, and above 13 kW on larger massage-led models such as WS-S07B at 13.35 kW and WS-S08B at 14.6 kW. Those figures cover the equipment fitted to that configuration. They do not tell you how the unit will be heated in your climate, because a heat pump is generally an option rather than a standard inclusion.
Before signing, get three numbers confirmed against your local electrician's supply:
- Total connected load for the exact configuration quoted, with voltage and phase stated.
- Whether the heat pump is included, its capacity, and whether insulation packages are quoted as standard or optional.
- Circuit protection, cable routing and where the isolator sits relative to the cabinet — an isolated power layout should be drawn, not assumed.
Catalogue specifications describe equipment fitted to that configuration. Confirm included equipment and electrical requirements for the selected configuration with the manufacturer before ordering; do not carry a figure from one model onto another.
Ask What Is Not in the Price
The optional-accessory list is where most budget surprises live. Across this range the catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of those should appear on your quotation either priced in or explicitly excluded, with a reason if excluded.
Also get clarity on what happens after the vessel leaves the factory. A manufacturer that also handles freight will quote packaging and container loading, commercial invoices and packing lists, and door-to-door delivery — but you still need to confirm duties, Incoterms, insurance and who prepares the concrete pad, deck framing and drainage at the site. Those are civil works on your side of the boundary, and they should be shown as excluded with a note describing what the site must provide.
A Pre-Contract Checklist for Your Supplier
- Dimensioned layout showing jet positions, water features, LED fittings and access panels — not a marketing render.
- Pump schedule: quantity, duty and what each pump drives; blower and swim training system marked included or optional.
- Frame material and grade, base sealing method, insulation package priced explicitly.
- Filtration and treatment: filter pump flow, ozone fitted, UV quoted as an option with price.
- Total connected load for the exact configuration, voltage and phase stated, isolator location drawn.
- Steps, handrails, cover and automatic cover options listed separately with prices.
- Cabinet and frame finish referenced to a named colour or material sample you can approve before production.
- Site-preparation scope written out: pad loading, drainage, clearances, delivery route and crane or rigging needs if any.
- Spares list for pumps, jets, seals and LED fittings, with what ships alongside the unit.
- Named contact for production coordination, shipping documentation and post-delivery support.
Why a Single-Source Order Helps on Multi-Product Projects
On villa and hospitality projects the swim spa is rarely the only water-related item. Bathroom fixtures, lighting, outdoor furniture and finishes all have to land in sequence, and each additional supplier multiplies the paperwork: separate packing lists, separate inspection windows, separate claims if something arrives damaged. Sourcing the pool vessel alongside the rest of the fit-out through a one-stop furniture and building materials supplier keeps one production schedule, one set of shipping documents and one accountable contact from order to handover. That is the practical value of turnkey interior project solutions — not a cheaper unit price, but fewer interfaces where a project can stall.
The Decision in One Line
Judge the proposal by its pump schedule, its structural detail and its exclusion list. The photographs of jets, LED colour and water features are easy to compare; the frame grade behind the acrylic, the circuit feeding the heat pump, and whether insulation is priced or optional are what determine the cost you carry for years after installation.
Send your site drawing and configuration shortlist for a line-by-line proposal review. SANTERSON manufactures outdoor swim spas together with the poolside furniture, bathroom fixtures and interior finishes that surround them, so one quotation can cover the whole outdoor living package. Enquiries are answered by the project team — see the contact page for current details.