Outdoor Swim Spa WS-S08B

Outdoor Swim Spa WS-S08B

Description

Outdoor Swim Spa WS-S08B is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 7800x2200x1500mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Waterfall. Confirm included equipment and electrical requirements for the selected configuration.

Description

Model information

  • Model: WS-S08B
  • Catalog dimensions: 7800x2200x1500mm
  • Control system: 2set
  • Water pump: 4pcs
  • Filter pump: 2pcs
  • Jet total: 98pcs
  • LED lights: 7pcs
  • Small LED lights: 46pcs
  • Total power: 14.6kW
  • Features shown: Water jets, LED lighting, Ozone, Waterfall

Optional accessories

Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.

Features

  • - Water jets
  • - LED lighting
  • - Ozone
  • - Waterfall