How to Request a Custom Quote for Outdoor Swim Spa WS-SP600

If you have reached the product page for our Outdoor Swim Spa WS-SP600 and are looking for a number, you will not find one printed there. That is deliberate. A swim spa of this size is sold as a configured unit: the shell and footprint stay constant, while pumps, jets, heating, filtration and insulation change with what the site and the client actually need. Two identical-looking WS-SP600 shells can therefore carry meaningfully different equipment lists and different landed costs.

The practical consequence is that a useful quotation request is not "how much for the WS-SP600" but "here is my site, here is how it will be used, price this configuration for me". The rest of this article sets out exactly what to send us so the first reply you receive is a comparable, buildable quote rather than an estimate that has to be redone.

Start With the Catalog Baseline of WS-SP600

Before configuring anything, it helps to know what the catalogue entry for this model already states. These are the published figures for the standard listing, and they are the reference point your changes will be measured against:

ItemCatalog value for WS-SP600
ModelWS-SP600
Catalog dimensions5900 x 2500 x 1600 mm
Control system1 set
Swim training system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power9.35 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Two details in that table matter more than they look. First, the water pump is not listed for this model in the captured specifications, so it belongs on your confirmation list rather than being assumed. Second, the total power figure of 9.35 kW is tied to this particular equipment set; add a heat pump or change pumps and the electrical load changes with it. We use your declared supply as a constraint on the configuration, not the other way round.

Catalog figures describe the listed configuration. Your quote will restate them for the exact build you choose, so please check the specification block of the quotation itself before signing, not just this page.

What to Send in Your Enquiry

Send the following six items and we can usually come back with a costed configuration instead of a round of clarifying questions. None of it is confidential at this stage; if a drawing is sensitive, a sketch with dimensions is enough.

1. Site conditions and access

  • Installation setting: garden, terrace, rooftop, sunken pit, indoor room or resort pool deck.
  • A clear opening area with dimensions, plus the finished floor level if the spa will sit partly below grade.
  • Access route for delivery: door and gate widths, turning space, lift capacity for rooftop work, and whether a crane is available on site.
  • Slab or platform status. A 5900 x 2500 mm unit filled with water imposes loads that a decorative deck was never designed for; tell us what exists so the load question is raised early rather than after the spa arrives.

2. Electrical supply at the site

State phase, voltage and available breaker capacity, and whether you intend to run the spa on the existing supply or upgrade it. This single item decides how much heating and how many pumps can be fitted without an electrician's visit becoming part of your budget. If the supply is not yet decided, say so plainly and we will size the configuration to a realistic option.

3. How the spa will actually be used

  • Daily lap swimming and training, hydrotherapy and rehabilitation, or guest leisure at a hotel or villa.
  • Expected number of simultaneous users.
  • Year-round use or seasonal use, and the coldest month you expect it to run in.

This drives the jet count and pump selection. The six jets shown for the standard WS-SP600 suit a swim-focused build; a spa intended mainly for massage seating needs a different jet layout, and that difference is visible in the price. For comparison, the closely related Outdoor Swim Spa WS-SP600-MS shares the same 5900 x 2500 x 1600 mm footprint but is listed with 29 jets, an additional water pump and a higher total power figure, which is exactly why we quote from your usage brief rather than from the model name alone.

4. Water treatment and maintenance preference

Ozone appears in the listed features for this model. Tell us whether you also want UV sterilisation, and whether sand filtration or the standard filter pump setup fits how the spa will be maintained. A resort spa run by housekeeping staff and a private villa spa cleaned by the owner should not be specified identically.

5. Heating and insulation decisions

Say whether you want a heat pump, what water temperature you expect, and how the spa sits relative to wind and shade. Insulation level is a trade you should make deliberately: it changes both the quote and the running cost, and it is much easier to decide now than in winter.

6. Commercial terms

  • Quantity: single villa unit or several units across a development.
  • Destination port or delivery address, and your preferred Incoterms.
  • Whether you want logistics and door-to-door delivery handled by us, or you have your own freight forwarder.
  • Your decision timeline, so we can flag anything that affects production scheduling.

The Quote You Receive Back

A WS-SP600 quotation from us is a document you should be able to compare line by line against quotes from other suppliers. It sets out the configured equipment list, the confirmed specification values for that build, packaging and container loading details, and the commercial terms you asked for. Where your project also needs surrounding works, such as decking, poolside furniture, sun loungers and changing areas, those can be handled through our turnkey solutions service so that one supplier carries responsibility for the whole outdoor leisure package instead of three.

If you are buying as part of a wider fit-out, sending the spa enquiry together with the rest of the project schedule is usually more efficient. Our custom and OEM service covers bespoke material finishes and configuration changes, so where a standard shell needs adapting to a design intent, that can be assessed at the same time as pricing rather than after the order.

Alternatives Worth Asking About in the Same Enquiry

If your space or budget does not suit a 5.9 metre unit, say so in the enquiry and we will suggest closer options from the swimming pools and swim spas range rather than quoting something that will not fit. Where the site geometry is unusual, our customizable shape outdoor spa supports square, round, oval and curved layouts for gardens, terraces and leisure areas. And where a smaller hydrotherapy footprint is enough, the round outdoor hot tub spa with hydrotherapy jets and underwater LED lighting covers that brief at a lower entry point.

A Quick Pre-Enquiry Checklist

  • Site photos and a dimensioned plan of the intended location
  • Declared electrical supply: phase, voltage, available capacity
  • Usage profile: swim training, hydrotherapy or guest leisure
  • Treatment preference: ozone, UV, sand filtration
  • Heating and insulation preference, with target water temperature
  • Delivery address, Incoterms and required quantity
  • Whether installation support is needed on site

Send all seven and the first quotation should be one you can act on. Send none of them and you will get a reply, but it will be a starting figure rather than a price.


Send your WS-SP600 configuration brief

Tell us the site conditions, the power available and how the spa will be used, and we will return a configured quotation for the Outdoor Swim Spa WS-SP600 with the specification restated for your build. Enquiries go through our contact page.