A wall panel enquiry rarely stalls over the sample board. It stalls because nobody wrote down the numbers and the site conditions. Before a modern decorative wall panel for interior decoration can be quoted, cut and packed, someone has to hand over measurements, substrate notes and a finish decision. Below is what to collect, in the order a manufacturer actually needs it.
Why the input list matters more than the sample board
Decorative wall panels are bought as a system: panel, substrate, fixing method, joints and edges. A product page can describe the finish and the general behaviour of the sheet; it cannot tell you how that sheet meets your particular wall. Our copy for these panels describes them as lightweight and stable, with surfaces that can imitate stone, wood, fabric and other effects, and with on-site cutting and assembly instead of a wet trade process. Those characteristics only hold when opening sizes, substrate type and expansion allowance are known beforehand.
The practical consequence is simple. Send complete inputs and you get a panel schedule, a fixing detail and an honest packing list. Send a photograph of a hotel lobby and the phrase "marble look" and you get a price per square metre that changes twice before production starts.
Measurements to record for each wall
Work wall by wall, not room by room. Label every wall on the drawing with a letter or number and carry that label through quotation, production and delivery.
| Input | What to write down | Why it changes the outcome |
|---|---|---|
| Finished wall size | Width and height in millimetres, with height read at high, middle and low points on long walls | Out-of-plumb walls are common. Three readings show whether the variance is a few millimetres or enough to need packing out. |
| Panel layout direction | Vertical, horizontal or stacked; where the field starts and ends | Sets cutting waste and decides where joints fall in relation to sightlines and furniture. |
| Joint positions | Distance from a fixed reference edge to each intended joint | Joints should not land behind a headboard, at a mirror edge or in the middle of a feature bay. |
| Openings and penetrations | Sizes and set-backs for switches, sockets, air diffusers, TV brackets, sconces, sprinkler heads | Cut-outs are cheaper made before shipping than cut on site, but only if they are dimensioned before cutting. |
| Inside and outside corners | Corner angles, and whether returns continue onto the adjacent wall | Angles other than 90 degrees need a decision on mitring, trims or a shadow gap. |
| Ceiling and floor interface | Skirting treatment, cornice line, expansion gap left at the base | Panels need an expansion allowance; a tight fit at both ends shows up as bowing later. |
| Area per wall type | Net covered square metres, plus offcuts needed for repeats | Colour and batch consistency depend on ordering the full run at once. |
Project inputs beyond dimensions
1. How the room is used, and what the wall actually takes
State the space type: guest room, lobby, restaurant wall, meeting room, villa bedroom, showroom. Then describe what happens to that wall. Is it touched constantly, sprayed with water, bumped by trolleys, or left alone? Our interior panel listings note moisture resistance and stain resistance as advantages of particular panel types, and name background walls, lobbies, bedrooms, offices and restaurants as typical settings. Matching the right panel family to the real exposure is a specification decision, not a decoration decision.
2. The substrate you will fix to
- Plasterboard, masonry, existing tile, existing paint, cement board or new framing battens — say which.
- Whether the surface is flat, and how that was checked.
- Any waterproofing membrane or insulation behind the finish.
- Adhesive or mechanical fixing your site team intends to use. For flexible cladding, adhesive onto a cement or gypsum base with on-site cutting by simple tools is the usual route.
3. Finish and colour reference
Send a target image plus a physical or printed reference where possible: a stone sample, a wood veneer offcut, a paint code, an RAL number. Screen colours shift between devices. Where the design intent is a stone or marble effect, look at stone and marble panels in our Paneling Systems collection, made to measure with selectable material and finish options.
4. Surface form: flat or curved
Curved walls, arches, columns and reception desks rule out rigid sheet goods. For those conditions we supply flexible cladding. The MCM flexible rammed earth panel bends onto curved and special-shaped surfaces and reproduces a rammed earth texture. The flexible wood grain cement wall panel is a bendable mineral sheet with a wood grain surface that can be rolled for transport. For either one, send the radius of the curve, the height to be covered, and whether the surface is interior or exterior.
5. Relief and depth
A flat printed surface and a moulded three-dimensional surface behave differently around lighting, cleaning and furniture clearance. The luxury decorative 3D wall panel is specified where relief is wanted on a feature wall, with custom size, colour and pattern available. Confirm how much depth the relief adds before any bracket, handrail or picture rail is fixed near it.
6. Acoustic and performance requirements
If the wall carries a duty beyond appearance — speech privacy in a meeting room, reverberation control in a restaurant or lobby — raise it at enquiry stage rather than after the finish is chosen. Our acoustic panels are configurable for project-specific dimensions and finishes. Performance figures on any product page are starting points to confirm against your specification, not certificates.
7. Quantities, phasing and dates
- Total net area by wall type, and how many rooms or bays of each type.
- One delivery or split by floor, block or handover phase.
- The date panels must be on site, working back from your installation window.
- Destination, port or site address, and who handles import clearance.
A worked example: a bedroom feature wall
Take a villa or hotel bedroom where the headboard wall is to be panelled. A usable enquiry reads: wall 3,400 mm wide by 2,750 mm high under a finished ceiling; three height readings show a 6 mm variance across the wall; two socket outlets 350 mm above finished floor, one either side of the bed centreline; a floating headboard bracket at 1,050 mm; skirting to be removed with panels run to the floor and a 5 mm shadow gap; substrate is plasterboard on battens, flat within 3 mm over 2 m; eleven identical rooms across two floors; target finish a warm timber tone, reference veneer sample posted separately. That one paragraph lets a factory return a panel schedule, an outlet-cutting drawing, a fixing note for the headboard bracket and a packing list grouped by room.
How this fits our project process
We have operated as a China furniture and building materials manufacturer since 2008, supplying project customers in hospitality, villas and offices. Wall finishes rarely travel alone on these jobs; they sit alongside cabinetry, lighting, flooring and furniture from the same order. As a one-stop furniture and building materials supplier, we cover design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover. The custom and OEM service covers bespoke dimensions, finishes and textures; logistics and door-to-door delivery covers freight, packaging and container loading; installation and after-sales support covers site fitting and inspection. The measurement list above is the same information our design and production teams need at first coordination.
Before you send the enquiry: a checklist
- Labelled drawing, every wall dimensioned in millimetres, heights included.
- Joint layout and cut-out positions marked against a fixed reference edge.
- Substrate type and flatness stated, not assumed.
- Finish reference supplied as sample, code or offcut, plus interior or exterior location.
- Curved conditions with radius noted; rigid panels dropped from those areas.
- Any acoustic, fire or impact duty named in writing.
- Quantities by wall type, phasing, required on-site date and delivery address.
Send the drawings, substrate note and finish reference for your next project, and we will return a panel schedule with sizes, joint layout and cut-out positions for your review before production starts. Browse the range under building and construction materials, or contact SANTERSON to open a specification.