A wall-hung basin looks simple on a drawing, but it is one of the few bathroom items where the specification has to be settled before the wall is closed. If you are comparing quotations for Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink, the supplier who answers fastest is usually the one who was handed the most complete brief. Here is what to have ready before you send your first enquiry.
Start with the room, not the catalogue page
The 1051B is a compact bowl: an overall envelope of 400 mm wide by 380 mm deep by 450 mm high, fixed to the wall on a back panel, with a single tap hole drilled in the front face and no cabinet underneath. Those four characteristics decide most of the rest of the job, so send the supplier your bathroom layout before you ask for a price.
A good enquiry pack includes:
- A dimensioned floor plan showing the wall the basin will sit on, including window sills, door swings and any return wall.
- The finished floor and finished ceiling levels, so clear heights are measured from the surface that will actually exist at handover.
- The position of adjacent basins, mirrors and vanity lighting where more than one wash station is planned.
- Whether the waste runs into a wall or down a floor slab, and the height of the existing connection.
Confirm what sits behind the wall
A wall-hung basin carries its load through the back panel into the wall structure, so the fixing detail depends on what you build there. Blockwork, a steel stud frame and a timber-stud wall with nogging each need a different fixing arrangement, and a plasterboard-only surface is not a fixing substrate on its own.
Tell your supplier which of these applies to each bathroom, and whether the wall is being built new or you are retrofitting onto an existing surface. If the same wall also carries a concealed cistern for a wall hung toilet, say so in the same message: the frame, the basin bracket and the tap tail positions all have to be coordinated on one setting-out drawing rather than three.
Decide the tapware and waste before you order
The 1051B has one tap hole on the front face, which points to a single-lever or exposed tail arrangement with exposed tails. Decide early whether you want a single lever mixer, a two-hole bridge set or a wall-fed spout, because each puts its connections in a different place behind the bowl.
The same applies to the waste. State clearly whether you need a basin with an overflow and a slotted waste, or an unoverflowed bowl with an unslotted waste and a click clack stay. This choice changes the trap set, the pop-up mechanism and the look of the underside, and it is far cheaper to change on paper than after the ceramic has shipped.
Match the suite if you want one design language
1051B belongs to the 1051 sanitary series, so the same curved profile carries across the matching wall-hung WC and the freestanding pedestal basin in that range. Ordering a whole suite from one series keeps the radius of the bowl, the glaze tone and the projection consistent across guest bathrooms, which is exactly what a hotel or villa client notices when they walk through several rooms.
If you are furnishing more than one property at a time, send the room-by-room schedule as a single list. Grouping basins, WCs, shower sets, vanities and cabinetry into one enquiry lets the supplier check glaze colour, tap hole positions and delivery batching together instead of reconciling them later.
Set the quantities, the packaging and the delivery terms
| Item to confirm | Why the supplier needs it |
|---|---|
| Quantity per bathroom type, plus spares | Ceramic is produced and packed by the carton. Spares for future maintenance should be quoted in the same batch so the glaze tone matches. |
| Packaging standard | Bulk cartons for a container load and individually boxed units for a punch list are not the same packing spec. |
| Consolidation with other trades | If basins travel with interior fixtures, vanities or flooring, one consolidated shipment avoids the situation where tiles arrive and the basins do not. |
| Delivery address and who receives it | A site with a crane and a locked gate needs different arrangements from a builder's yard or a forwarder's warehouse. |
Ceramic is breakable, so ask how the cartons are marked, what the inspection procedure is on arrival, and how replacements are handled if a carton is damaged in transit. Put that agreement in writing before the goods leave, not after they land.
Ask for the documents your site team will need
Before you place an order, request the fixing detail drawing, the setting-out dimension sheet, the packing list format and the product data sheet for the exact model. The installer needs to know bracket positions and waste heights; the plumber needs the trap and tail arrangement; the site clerk needs a packing list that matches the room schedule so nothing goes to the wrong floor.
For larger projects, this is also the moment to raise finishes, customisation and sampling. A supplier such as SANTERSON works on custom and OEM service across bathroom ceramics, joinery, lighting and other fit-out products, so a specification change can be handled inside the same project file rather than through three separate vendors.
Questions worth asking in the first message
- Is the 1051B shown on your drawing the same model code as the one quoted, including the suffix?
- Which fixing bracket and carrier frame do you recommend for my wall type, and is it supplied or sourced locally?
- What is the lead time for this quantity, and does a partial release split the batch?
- How are cartons protected for ocean freight, and what is the claims process for breakage?
- Can you supply the matching 1051 WC and pedestal basin on the same delivery?
None of these questions take long to answer, and every one of them removes a variation order later. A supplier who receives a plan, a wall type, a tapware decision and a room schedule can return a firm quotation; one who receives only a model number returns a guess.
Send a complete brief
If you are specifying wall-hung basins for apartments, boutique hotels or villa bathrooms, send the layout, the wall construction and the quantities together with the model reference. SANTERSON supplies bathroom ceramics alongside furniture and building materials for hospitality, villa and office projects, with production, consolidation and door-to-door delivery handled through one project team. Contact the project team to check current availability, fixing details and lead times for your room schedule.