A freestanding pedestal basin rarely causes a project problem on its own. It causes problems through what nobody wrote down: the rough-in behind the wall, the faucet that was never specified, the matching toilet ordered three weeks late, and the gold accent line that turned out to be a different finish on the second batch. If your team is specifying the Freestanding Pedestal Basin 1050B, Luxury Gold Line Ceramic Stand Basin for a villa bathroom or a boutique hotel restroom, the documentation below is what we ask procurement teams to close out before a purchase order is issued.
1. Product identification: model, series and finish name
Record the full catalogue title, not just a number. On our own pages the same fixture appears as "Freestanding Pedestal Basin 1050B" in the short description and as the longer "Luxury Gold Line Ceramic Stand Basin" in the page title; your purchase order, packing list and invoice should carry one consistent wording so that receiving inspection is not guessing.
- Catalogue name and model code: 1050B, part of the matched 1050 sanitary collection.
- Surface description as published: high-density vitreous ceramic with a smooth glossy glaze, plus a gold line accent. Note the exact wording for the accent so a replacement or an added bathroom in a later phase matches.
- Series context: 1050B is designed to coordinate with the Washdown One Piece Toilet 1050A and with the wall-hung basins 1050WB and 1050WC in the same collection.
- Application as published: villa master bathrooms, boutique hotel restrooms and high-end commercial washrooms. Where a project falls outside these settings, ask us to confirm the specification rather than assume it.
2. Dimensions and fixing method
The published page gives 1050B as 460×360×850 mm and describes a slim tapered body fixed to the wall through back panel reinforcement. Two points belong in your drawing set, because both change site work:
- Wall support. A freestanding basin that is anchored through a back panel needs solid blocking or a suitable substrate at the fixing zone. Frame-only stud walls are not a fixing detail; this belongs to the wall trade, not to the ceramic supplier.
- Clearance. The tapered footprint and the 850 mm height should be checked against door swings, towel rails, vanity lighting and adjacent partitions before the layout is frozen.
Treat 460×360×850 mm as a catalogue reference. Our own product note asks buyers to confirm sizes and plumbing rough-in against the current technical data sheet, so request the dated sheet for your project number and archive it with the order.
3. Tapware and drainage interface
1050B is described as having a reserved tap hole for a single lever faucet. That single sentence carries three decisions your team should document explicitly:
| Item to document | Why it matters at site |
|---|---|
| Faucet type and reach | The basin is specified for a single lever tap. Spout reach and height must suit the bowl depth so water lands correctly and the aerator clears the rim. |
| Who supplies the faucet | If tapware comes from another vendor, record it on the same line schedule so nobody assumes it ships with the basin. |
| Waste and trap arrangement | Ceramic basins are ordered against a waste type and trap position. Confirm this in writing for each bathroom type before production starts. |
4. Coordinating the 1050 collection across the project
Gold-line collections look expensive when they are consistent and cheap when one bathroom is out of step. If a project uses 1050B in some bathrooms and wall-hung basins in others, put every fixture from the series on one line schedule with the same finish wording, the same order batch reference and the same target delivery window. That single sheet prevents the most common complaint we hear on sanitary ware: two phases delivered with finishes that almost match.
- List each bathroom type and the fixtures assigned to it, including tapware and accessories.
- Group all 1050-series items into one production batch wherever the programme allows.
- Keep a signed physical sample of the gold accent finish in the site office for receiving inspection.
If your scope also includes cabinetry, wall panelling, lighting or flooring around these bathrooms, sourcing them from a single one-stop furniture and building materials supplier keeps the finish schedule under one specification process instead of several unrelated vendors.
5. Commercial terms to settle before the order
- Packaging and protection. Sanitary ware is fragile freight. Confirm the packing standard, individual carton marking per bathroom type, and how spare cartons are identified in the container loading plan.
- Freight mode and delivery point. We arrange sea, air and rail forwarding with customs paperwork and door-to-door delivery; Incoterms, duties and insurance should be agreed for your specific destination rather than assumed from marketing copy.
- Inspection window. State how many days after delivery ceramic items are inspected, and photograph any transit damage at the moment of unloading.
- Spare quantity. For hotel and multi-unit residential work, record the number of spare basins held on site; replacing a single fixture years later may not match an updated production run.
6. A short close-out checklist
- Catalogue name, model code and finish wording agreed and repeated on every document.
- Dated technical data sheet on file, with dimensions and rough-in confirmed against the drawing set.
- Faucet type, supply responsibility and waste/trap arrangement recorded per bathroom type.
- Wall blocking detail assigned to the wall trade before closing the partition.
- All 1050-series fixtures grouped in one batch, with a retained finish sample.
- Packaging standard, Incoterms, insurance and inspection window confirmed in writing.
Send us your bathroom schedule or line list and we will return the specification sheet for 1050B together with the matching 1050-series items, so the whole set is documented before production begins. Enquiries go through our contact page.