A rattan-fronted kitchen with an integrated island looks effortless on a mood board. It is far less effortless on a purchase order. Once the cabinet run, the island, the appliance housing and the lighting all have to be quoted, scheduled and delivered as one package, budgeting stops being about a single unit price and becomes a scoping exercise. This guide walks through how we structure that scope at SANTERSON, what drives the cost of each line item, and which decisions you should lock down before a quotation is requested.

What a Wabi Sabi Rattan Kitchen Actually Consists Of

Before you budget, split the kitchen into the parts that are quoted separately. Our Wabi Sabi Rattan Kitchen Cabinets with Island is a good reference point because it shows how many elements sit behind one photograph:

  • The tall and wall runs. Solid wood frames carrying woven rattan panels, plus the plain carcass sections that hold the storage you do not want on display.
  • The island. On this design the island extends into a dining table, so it carries cooking, prep, seating and social functions at once. That is a bigger structural and worktop item than a simple prep island.
  • Appliance housings. The run reserves positions for built-in ovens. The oven itself is usually not in our scope; the housing, ventilation gap and door alignment are.
  • Open shelving with lighting. Recessed warm LED strips inside open shelves to show tableware. Cabling, transformer location and a service access point all have to be planned with the electrician.
  • Internal fit-out. Shelf arrangements, drawer internals, dividers — priced per unit, not included in a per-metre headline figure.

The first budgeting mistake is comparing suppliers on a single "price per linear metre" number when only one of them has actually included the island, the lighted shelving and the internal fit-out. Ask every supplier to quote the same six lines above, and your comparison becomes meaningful.

The Cost Drivers You Can Control

ElementWhat moves the priceWhere to save without losing the look
Rattan panelsWeave density, panel size, how many doors use woven fronts rather than solid woodUse rattan on the display doors and eye-level sections; keep upper and pantry doors in matching solid wood
IslandLength, whether it doubles as a dining table, worktop material, seating overhangFix the island footprint early — moving an island with plumbing or appliances inside is the most expensive change on the drawing
Worktop and splashbackSlab size, edge profile, seam count, cut-outs for sink and hobStandardise the worktop across run and island; keep seams where cabinets meet rather than mid-run
Internal fit-outNumber of drawers versus doors, soft-close hardware, specialty dividersPrioritise deep drawers in the cooking zone; use shelved cupboards in the pantry run
LightingLength of lit shelf, driver location, whether switching is local or on the room circuitLimit lit shelving to one or two display bays rather than lighting every open shelf
Finish and colourStandard finish range versus a matched custom stain or surface treatmentChoose from the standard wood-tone range where the design allows, and reserve a custom match for one feature element

On this product we fully customise cabinet dimensions, internal storage partitions, wood colour and surface treatment, so almost every line above is adjustable. The practical rule: pick two of the three — size, material, finish — to be bespoke, and hold the third to a standard option.

Why Multi-Product Projects Cost More Than the Sum of Their Parts

The interesting part is what happens when this kitchen is not alone. On a villa or boutique hotel job, the same warm wood tone and woven texture usually continue into other joinery: a bar unit in the living area, laundry cabinetry, and built-in storage across several rooms. Each of those is a separate product line with its own dimensions and finish matching.

This is where a single supplier for the whole joinery package starts to pay for itself. Our Island Bar Units are made to measure with project-specific dimensions and finish options, so a bar unit can be ordered against the same wood tone and the same surface treatment as the kitchen run. The same applies to our Custom Built-in Kitchen Cabinets for guest suites, kitchens and apartments in the same building, where we also supply matching hinges, drawer slides, support legs and connecting brackets.

The savings are not primarily on unit price. They come from four places:

  • One finish batch. Stain and surface treatment matched across kitchen, bar and wardrobe joinery in the same production run, instead of three separate matches that never quite line up under site lighting.
  • One hardware specification. Hinges, slides and handles specified once for the whole project rather than re-specified per room type.
  • One container. Consolidated packing and one shipment instead of separate consignments with separate delivery windows.
  • One snag list. One coordination channel during installation, which matters most when the kitchen, joinery and flooring trades are on site at the same time.

A Simple Three-Tier Scope Structure

For a multi-room project we suggest splitting the joinery into three tiers, so you can release budget in stages rather than committing everything at once:

  • Tier 1 — Fixed now. Kitchen run and island. These drive plumbing, electrical and appliance positions, so they have to be confirmed before first-fix services are set out on site.
  • Tier 2 — Confirmed at drawing stage. Bar units, laundry and secondary kitchenettes. Same material and finish as Tier 1, dimensions confirmed once the layout is frozen.
  • Tier 3 — Released later. Secondary storage and wall joinery. These can follow once Tiers 1 and 2 are in production, provided the finish reference has been signed off. Our Full House Custom Wall Cabinet Project shows how a whole-house joinery set — wall cabinets, niche paneling and built-in storage — is specified room by room against one finish schedule.

If you are comparing a warm woven look against a cleaner modern one, our Wood and Taupe Handleless Kitchen Cabinets sit in the same custom cabinetry range with flat panels and LED-lit open shelving. Quoting both options side by side at Tier 1 is a quick way to see what the woven panel detail actually costs you across the whole project.

Scope note on open-plan layouts. Where the kitchen opens into living space, cabinet sides and island ends become visible from the room rather than tucked into a wall. Ask for finished panels on all exposed faces in the quotation — this is a common omission in a per-metre price, and it is far cheaper to specify at order stage than to fix on site. Our Open Plan Kitchen Cabinetry pages list custom layout, dimension, door style and finish options for open-plan apartments and hotel suites.

How the Package Reaches Site

A multi-product joinery package only holds together if it arrives together. Our Logistics and Door-to-Door Delivery service covers freight forwarding by sea, air and rail, customs paperwork, packing and container loading, shipment tracking and delivery to site. Confirm import terms, duties, insurance and transit times for your specific destination with us before you commit to a programme date — these vary by country and by consignment.

On arrival, our Installation and After-sales Support covers on-site installation, inspection and snag resolution, spare parts and ongoing maintenance. For cabinetry this is the stage where a single-supplier package shows its value: one set of drawings, one hardware specification and one list of items to check off.

What to Fix Before You Request a Quotation

  • A dimensioned layout with the island position, seating overhang and appliance list confirmed.
  • Which doors are rattan and which are solid wood, marked on the elevation drawing.
  • The worktop material and where seams are allowed to fall.
  • Appliance models for anything built in, so housings and ventilation are sized correctly.
  • How many lit display bays you want, and where their drivers sit.
  • The finish reference signed off on a physical sample, not a screen.

Send that pack and the quotation comes back as a real scope rather than an estimate with exclusions buried at the bottom. If you would like the kitchen and the rest of the joinery priced together, our Custom & OEM Service covers bespoke sizing, material and finish selection, prototyping and project-tailored layouts. Our Interior Design Services can also prepare the layout drawing and 3D rendering you need before the first quotation round.

Put your kitchen scope in front of us

Send the layout, the appliance list and a finish reference, and we will price the rattan kitchen with island alongside the rest of your joinery on one schedule. Visit our Kitchen Cabinets and Hotel Appliances range to see the cabinetry options available for villa, boutique hotel and apartment projects.