Closed modular units look simple on a drawing: a run of carcasses, some doors, a flush finish to the wall. On site they are one of the least forgiving items in a fit-out, because every millimetre of the opening has to match what left the factory. If you are specifying Santerson Closed Modular Units for a villa or apartment package, the difference between a clean handover and a week of site rework usually comes down to two things decided long before production: how quantities are counted, and how the units are coordinated with everything that touches them.
What Closed Modular Units Actually Cover
The Santerson Closed Modular Units range sits in the Modular Living Systems collection and covers enclosed, door-fronted storage built into the living areas of a residential project — media walls with closed lower cabinets, full-height pantries, hallway storage, display cabinets with concealed shelving. The catalogue also carries neighbouring configurations from the same collection that projects frequently mix into one wall: Santerson Mixed Open & Closed Systems for runs that alternate open niches with closed bays, and Santerson Floor to Ceiling Modular Systems where the run terminates at the soffit instead of a fixed cabinet height.
Two characteristics drive all the quantity work that follows. First, these units are made to measure: dimensions, layout and finish are specified per space rather than chosen from fixed sizes. Second, they arrive as component modules assembled on site, not as one solid block. That means a quantity list has to describe an assembly sequence, not just a length of wall.
Counting Quantities in Modules, Not Metres
A single linear-metre take-off is the most common source of error. Two runs of identical length can need very different material if one has a return at the end, a tall appliance bay or a cut-out for a fireplace. Break each run down into the elements you will actually receive and install.
| Element | What to record per line | Typical mistakes |
|---|---|---|
| Base modules | Width, height, depth, internal layout (shelves, drawers, hanging rail), door type | Counting the run length but leaving internal layout blank, so drawer banks and shelf stacks are quoted as an afterthought |
| End and return panels | Thickness, edge finish, which face is visible | Forcing a corner module when the drawing needs two standard carcasses plus a return panel |
| Fillers and scribes | Width at each wall junction and ceiling junction | Assuming square walls; old and re-plastered openings vary by several millimetres per metre |
| Doors and fronts | Quantity, hinge side, opening direction, handle or push-open detail | Hinge sides decided on site, which forces re-ordering of doors with an asymmetrical grain or finish |
| Cornices, plinths, light troughs | Length in millimetres, cut direction at corners | Rounding lengths to the nearest 100 mm, then discovering mitred trims cannot be shortened twice |
| Integrated lighting and electrics | Fixture positions, cable routes, transformer access points | Specifying a lit niche but no accessible location for the driver or sensor |
Where a wall mixes open and closed elements, keep them on separate lines even if they share one finish. Open bays are judged by visible edges and shelf levelness; closed bays are judged by door gaps and alignment. Different tolerances mean different inspection notes at handover.
Coordination: The Interfaces That Decide the Schedule
Closed modular units rarely fail on their own. They fail where they meet another trade, so each interface below needs a named owner and a frozen date before the shop drawings are released.
- Flooring. Engineered timber and parquet are usually laid after the setting-out line is taken but before or after the units, depending on who bears the expansion gap. Decide which side of the unit the transition strip sits on, and record the finished floor level, not the structural slab level.
- Walls and ceilings. Plasterboard returns, cornice lines and any recessed niche must be dimensioned off the same drawing set the units use. Where a run meets a decorative wall panel, confirm which material stops and which starts at the junction, and who trims the edge. The same question applies to Decorative Wall Panel for Interior Home Decoration, where a panel field butts straight into a cabinet return.
- Lighting. If the design calls for lit display shelving rather than a fully closed run, that is a different product line — Santerson Modular System with Lighting and it changes the electrical first-fix, not just the cabinet. Feed and switch positions have to be set before the wall is closed.
- Doors and openings. A run that passes a doorway needs the door reveal measured after the floor build-up is complete; an early measurement taken off a bare slab will be wrong by the thickness of the screed and finish.
- Kitchen and wardrobe joinery. Where the living-area units share a wall with kitchen cabinetry or bedroom Combination Modular Wardrobes, align the module grid and handle heights across both scopes. Two suppliers working from two grids produce a visible mismatch at the shared corner.
- Services. Media walls carry sockets, TV brackets, speaker cable and sometimes ventilation for concealed equipment. Every one of these sits inside a closed cabinet, so its position must appear on the unit drawing before panels are drilled.
A Working Sequence for Project Teams
The order below keeps quantity take-off and coordination on the same track, and mirrors how our own project teams move from brief to handover.
- Set out on site. Take dimensions from the completed substrate — floor build-up done, walls plastered, services first-fix complete. Record level and plumb deviations at each end of every run.
- Issue a module schedule. One line per module with its size, internal layout, front type and finish. Add fillers, panels and trims as their own lines so nothing is quoted as an allowance.
- Confirm finishes against physical samples. Veneer, lacquer and melamine fronts read differently under site lighting than on a screen. Approve the sample before the schedule is locked.
- Release shop drawings for sign-off. Every stakeholder who touches the wall — flooring, electrical, plaster, door supplier — signs the same sheet.
- Sequence production and delivery. Units travelling with the rest of the package arrive in one consignment; units ordered separately arrive on a different date and sit idle while other trades wait.
- Inspect before fixing. Check carcass squareness, door alignment and finish damage on arrival. Corrections are cheap at this stage and expensive once the unit is anchored and filled.
How a Single Supplier Reduces the Coordination Load
The reason we push closed modular units through the same production line as the rest of the joinery package is that most of the coordination problems above are paperwork problems between suppliers. When wardrobes, kitchen cabinetry, media walls, doors and wall panelling come from one manufacturer, the module grid, the finish batch and the installation crew are shared, and the interface details get resolved inside one drawing set instead of across three email threads.
SANTERSON has manufactured furniture and building materials since 2008 and works as a one-stop furniture and building materials supplier for villa, hospitality and office projects. For closed modular units that means made-to-measure production under our custom and OEM service, with the same team handling logistics and door-to-door delivery and on-site installation support, so the quantity schedule you approve is the one that ships. Villa and apartment projects we have supplied in Australia include Sydney, Melbourne, Perth and Willoughby.