A 5 m outdoor swim spa looks simple on a brochure: a shell, a pump, a set of jets and a price. The differences between suppliers only appear once you compare drawings, electrical assumptions and what is actually inside the crate. If your project is specifying the Outdoor Swim Spa WS-PC05CH or a comparable unit in that size class, the shortlisting work below is what separates a smooth handover from a site problem.

Start From the Size Class, Not the Model Number

The WS-PC05CH sits in a compact, shallow-footprint group of our outdoor swim and hydrotherapy range. The catalogue lists it at 5000 x 3000 x 900 mm, with a single control system, one water pump, one filter pump, 30 jets, one LED light and a total power figure of 2.45 kW. That shallow 900 mm depth puts it in a different usage category from the deeper plunge-style units we build at around 1400-1600 mm, such as the Outdoor Swim Spa WS-SP500 or the longer WS-S10.

Before you ask three factories for a quotation, decide which category you actually need. A shallow 900 mm basin suits seated hydrotherapy, children's play and cooling off on a terrace or pool deck. A deeper basin is what you want for standing massage positions and swim-training use. Shortlisting manufacturers only makes sense once this decision is made, because it changes the shell mould, the seating layout, the jet count and the plant room requirements. Asking for "a 5 m spa" invites three different products at three different prices.

Six Checks That Separate Manufacturers From Traders

1. Does the supplier publish a specification sheet per model?

Ask for a written spec per model: external dimensions, water depth, jet count and jet type, pump and filter arrangement, total connected power, control system and insulation. A manufacturer can produce this in an hour. A reseller will quote the marketing page back to you. On the WS-PC05CH we list 30 jets and a 2.45 kW total power figure — but the exact configuration depends on which options you select, so the sheet you receive should match your option list line by line.

2. What is included, and what is an option?

Every swim spa quotation needs an inclusions table before the price means anything. For this range, catalogue-listed options include the control system, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Heat pump and insulation choices matter most in cooler climates; they determine running cost far more than the jet count does.

ItemCatalogue reference for WS-PC05CHConfirm with supplier
Shell and structureAcrylic shell, reinforced cabinetShell thickness, warranty terms, cabinet finish
Dimensions5000 x 3000 x 900 mmWhether depth is measured to the rim or to the water line
Jets30 pcsJet type, layout drawing, adjustable or fixed
Pumps1 water pump, 1 filter pumpPump brand and kW, service access
Power2.45 kW totalVoltage, phase, dedicated circuit and isolator
Air and lightOzone, 1 LED lightOzone output, controller interface
OptionsHeat pump, UV, sand filter, insulation, stepsWhich are fitted at factory, which ship loose

3. Can they confirm the electrical assumption?

A total power figure on a datasheet is not an installation instruction. Ask the supplier to state voltage and phase for your market, whether the unit needs a dedicated circuit, and what protection and isolator arrangement they assume. Then have your own electrician or plumber confirm the requirements against local wiring and building rules before the unit ships. We will supply the electrical specification for the configuration you order, but site compliance in your country has to be signed off by local licensed trades.

4. Can the shape and finish be customised?

Standard moulds keep costs down, but villa terraces and resort decks rarely follow a rectangle. Where a project genuinely needs a non-standard footprint, check whether the supplier can produce custom shapes — square, round, oval and curved — in an acrylic shell with structural reinforcement, as we do for our customisable shape outdoor spa. Ask what a custom shell costs in tooling time, not just unit price.

5. How does the unit travel?

A swim spa is heavy, awkward and easily damaged at the corners. Ask how the shell is crated, whether the cabinet ships assembled or flat, what packaging protects the acrylic surface, and which container and delivery route applies to your site. A supplier who handles export orders regularly will answer this with a packing list and loading plan. If you are also furnishing the surrounding deck — loungers, daybeds, pergolas, outdoor dining — the same supplier can consolidate those into one shipment, which is where a single logistics and door-to-door delivery contact saves weeks of coordination.

6. What happens after the container arrives?

Ask specifically: who supervises setting and levelling, who connects the plant, how snags are recorded on handover, and how spare parts such as jets, pumps and controllers are supplied years later. We describe installation and after-sales support as part of project delivery, covering on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Get the actual scope for your order in writing.

Score the Shortlist on Paper Before You Talk Price

Ask every candidate for the same five documents:

1. Model specification sheet matching your selected options, with a jet layout drawing.

2. Electrical requirement statement for your voltage and phase.

3. Packing and loading plan, including how the shell is protected.

4. Written inclusions and exclusions list — heat pump, insulation, steps, cover, ozone, UV.

5. Spare parts list with part numbers for pumps, jets, control system and LED.

Score each supplier against those five documents only. The one who sends all five, complete, is usually the manufacturer; the ones who send two and a discount are usually not. Only then compare prices on identical configurations. Comparing a 30-jet shallow unit against a 20-jet deeper unit because the price looks similar is the most common way buyers get this wrong.

One practical test: ask each supplier what they would change about the standard specification for your site's climate and usage. A factory answers with options and trade-offs. A trader answers with a discount.

Where SANTERSON Fits

We have been manufacturing furniture and building materials in China since 2008, and our swim spa range is one part of a wider project scope that also covers outdoor furniture, bathroom ceramics, lighting, wall panels, ceilings, flooring and cabinetry. For villa and hospitality projects, that means the spa, the poolside loungers, the cabana daybeds and the surrounding finishes can be specified, produced and shipped through one turnkey project process rather than six separate suppliers.

If your shortlist includes the WS-PC05CH size class, send us the plan of the terrace or deck, the intended users, and your local voltage. We will confirm which configuration fits, what is included, and what should be specified as an option — before you commit to any quotation.

Send your drawings and site conditions for a specification review.

Contact PHILLIP by email at santerson@qq.com, or by phone / WhatsApp on +86-13928214007. The contact page states that enquiries receive a response within 24 hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).

Browse the full range at Swimming Pools and Swim Spas.

Product dimensions, jet counts and power figures quoted above are catalogue values for the standard configuration and change with the options selected. Site preparation, electrical connection and building compliance must be confirmed by local licensed trades in the destination country.