A purchase order that names only a model number is not a specification. In hotel and residential bathroom packages, most avoidable rework begins with an incomplete line on a schedule: the drain direction was never stated, the matching pieces were ordered in different series, or nobody recorded which glaze and seat were included. The Washdown One Piece Toilet 1051A is a useful reference point for this article because it sits inside a coordinated sanitary collection and offers more than one rough-in option, so the same specification method applies to wall-hung WCs, basins and other ceramic fixtures you are sourcing for a project.
Below is the checklist we use when writing a bathroom fixture schedule that a factory, a site plumber and a procurement officer can all read without going back and forth with questions.
Start with the fixture type, not the finish
Two fixtures can share a design language and still be completely different installations. A one-piece floor-standing WC such as model 1051A needs a waste connection at the floor or wall depending on its trap arrangement, while a wall-hung unit of the same series depends on a concealed cistern and a carrier frame that your contractor supplies or installs. Decide the fixture type per room type first — guest bathroom, guest WC, staff restroom, villa master bath — and only then compare shapes and surfaces. This ordering prevents the common situation where a beautiful wall-hung WC is approved late, after the pipework has already been set for a floor-mounted unit.
Record rough-in and drain direction as a required field
For washdown WCs, the trap arrangement and its dimension decide whether the unit fits the pipe already in the wall or slab. The 1051A is listed with dual rough-in options, P-trap 180 mm and S-trap 250 mm, which is exactly why a specification must state which option is being ordered rather than leaving it to the factory's standard. Never assume that one model covers both layouts on the same project: a heritage renovation with existing floor drains and a new-build core with wall outlets routinely appear in the same building.
| Field to state | Why it matters at site |
|---|---|
| Trap type (P-trap wall outlet or S-trap floor outlet) | Determines whether the waste pipe has to be rerouted before tiling. |
| Rough-in dimension, in millimetres, per fixture | Confirms the fixture lines up with existing pipework; measure from finished wall face. |
| Mounting method (floor-standing one-piece, two-piece, wall-hung) | Wall-hung units need a frame and concealed cistern that may sit outside your supply scope. |
| Seat and cover included or not, and closing type | Seats are frequently quoted separately, so omissions surface only after delivery. |
| Flush mechanism and actuator plate finish | The visible plate must match the rest of the bathroom hardware. |
Write these values into the schedule for every line item. If a dimension is still unknown, mark the line "to be confirmed on site" and assign who confirms it, rather than leaving the cell blank; a blank cell is read as agreement to whatever the supplier ships.
Specify the whole suite in one series
Mixed ceramics look finished but read as assembled from clearance stock. The 1051 collection exists precisely for this problem: the one-piece WC is designed to coordinate with the Wall Hung Toilet 1051W and with stand and wall-hung basins in the same series, so a project can use a floor-standing unit in guest bathrooms and a wall-hung unit in the guest WC without breaking the visual continuity of radius, glaze and profile. Specify at suite level: one series per bathroom type, one glaze reference across all ceramics, one hardware finish family for taps, plates and accessories.
Practical rule: your schedule should be able to answer "what happens if this line is out of production?" If the answer is "substitute another piece from the same series", the specification is complete. If the answer is "the designer chooses something", the appearance of the room is still undecided.
Describe surface and cleaning duty in real terms
Hotel housekeeping and a family bathroom place different demands on a glaze. For high-frequency use, ask what the surface does against limescale, staining and yellowing over years of cleaning with the chemicals your team actually uses — vitreous ceramic with a dense glossy glaze is the practical answer for guest bathrooms because it can be wiped daily without dulling. Also record whether the pan has exposed fixings or an enclosed shroud, since those change cleaning time per room, and whether the tank-to-bowl junction is integrated: a one-piece structure removes the gap where dirt collects, which is a measurable saving in housekeeping minutes across a large floor count.
State performance without inventing numbers
A washdown flush should be described by behaviour — strong cleaning action with economical water use — and the actual per-flush volume, flushing pressure range and any local certification should come from the current technical data sheet for the exact model and destination market. Do not copy a figure from marketing material into a purchase order; request it in writing per model, because water figures change between versions and markets, and an incorrect number is a compliance problem, not a preference.
Fix the sample and packing terms before volume
- Approve one physical sample per fixture type, signed off by the designer and the site contractor together, and keep it on site as the reference piece.
- Confirm carton marking and pallet grouping by room or floor, so a delivery can be distributed without opening every box in the loading bay.
- Agree how breakage and shortage are handled for ceramics in transit, including who documents damage at unloading.
- Order one spare set of seats, seals and fixing hardware with the main shipment; replacement parts ordered later stall handover.
A short template you can copy
Room type / fixture code / series name / model number / mounting method / trap type and rough-in in mm / overall dimensions from the current data sheet / glaze and colour reference / seat included yes-no and closing type / flush volume per data sheet / actuator plate finish / quantity / delivery marking / spare parts line. Anything you cannot fill in is a question that has to be answered before the order, not after.
Can one model cover both floor-drain and wall-drain layouts on the same project? Only if that model is genuinely offered in both configurations, and each line of the schedule names the specific option. Confirm against the technical data sheet for the exact version being shipped.
Do wall-hung WCs from a suite match floor-standing ones? They share design language and glaze within a series such as 1051, but the supporting frame and cistern are separate building work, so specify who supplies them.
Who should sign the final schedule? Designer for appearance, M&E or plumbing contractor for rough-in, procurement for quantity and terms. One signature is not enough for ceramics.
SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials for hospitality, villa and office projects, with bathroom sanitary fixtures produced alongside the rest of the fit-out package. If you are assembling a ceramic schedule for a project, send us the room list and the rough-in conditions per location and we will return a fixture schedule with the fields above completed.