A swim spa is a compact piece of engineered equipment, not a drop-in purchase. The shell arrives on a flat rack or in a container with the pumps, jets and control gear either loose or built in, and it needs power, water, drainage and a load-bearing base at the far end of the journey. Most of the problems buyers report after an international order are decided before production starts: what was confirmed, what was measured on site, and who is responsible for each step between our factory floor and your finished installation.
The planning below follows the way we handle project orders through our logistics and door-to-door delivery service, using the Outdoor Swim Spa WS-PC01A as the worked example. Where a figure depends on your configuration or your site, we say so rather than guessing.
Start with the specification sheet, not the shipping date
Every swim spa order should begin with a written configuration list, because three items on that list drive the entire delivery plan: the electrical load, the shell dimensions and the accessories you have selected. For the WS-PC01A, our catalogue page records the following:
| Model | WS-PC01A |
| Catalogue dimension | 3000 × 930 mm |
| Total power | 3.25 kW |
| Jet total | 28 pcs |
| Water pump / filter pump | 2 pcs / 1 pc |
| Control system | 1 set |
| Lighting | 1 LED light; 9 small LED lights |
| Features shown | Water jets, LED lighting, Ozone |
Treat those figures as the starting point for your own checks. The catalogue also lists options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps, and availability varies by model. A heat pump or sand filtration package changes both the electrical draw and the number of crates in the shipment, so confirm the finished configuration before anyone books a container.
Match the site conditions to the unit you are ordering
Send us your site information while the order is still being quoted, not after production. For a 3000 mm shell with the catalogue dimension of 3000 × 930 mm, the checks that matter are:
- Access route. Measured width and height of gates, side passages, steps and any overhead obstruction between the kerb and the final position. A spa that fits the plot but not the gate is a costly problem.
- Base and loading. A level, structurally adequate slab or deck rated for the filled weight plus occupants, confirmed by your engineer or builder.
- Power supply. Supply capacity, breaker rating and the correct circuit for the configuration you have chosen, together with local wiring rules. Local electricians handle this connection; we tell them what the equipment needs.
- Drainage and services. Where overflow and maintenance water go, and whether a fill tap and any plant room sit within practical reach.
- Exposure. Wind, sun and frost at the position affect insulation and cover choices, which is where options such as insulation packages come into the specification.
We work from drawings and photographs on your side and coordinate production against them. For villa and resort projects that need more than equipment procurement, our turnkey solutions cover design, production, logistics, installation and after-sales under one coordination team.
Decide the delivery terms before you compare freight quotes
Freight rates are only comparable when everyone is quoting the same obligation. Two questions settle it: where does our responsibility end, and who clears customs at the destination? We arrange sea, air and rail forwarding, packaging and container loading, commercial invoices, packing lists and certificates of origin, shipment tracking and door-to-door delivery to named addresses.
For a buyer in Australia, that usually means choosing between port collection with your own customs broker and a delivered-to-site arrangement. Import duty, goods and services tax, biosecurity inspection of timber packing and the final leg to a regional property all sit on one side of that line or the other. Ask for a written breakdown rather than a single landed price, so you can see which costs you are taking on yourself.
Get the packaging and unpacking sequence right
A swim spa shipment arrives as several handling units of very different value and fragility: the acrylic or composite shell, pumps and jet assemblies, the control system, lighting, and loose items such as steps and covers. Our packing list states each unit's dimensions, gross weight and contents, which is what your lifting plan and your customs declaration are both built from.
- Confirm the crane, forklift or team-carry method for the shell against the packing weights before the vessel arrives.
- Photograph every crate at receipt, opened and unopened, and report damage on the delivery note the same day. Claims past that point become arguments.
- Check the loose electrical and pump components against the specification list before the installers start; a missing part found during commissioning stops the job.
- Keep the packing list, invoice and configuration sheet together in one project file. After-sales support starts from those documents.
Plan commissioning as part of the order
Filling, energising and testing a spa is where warranty terms are quietly won or lost. Our installation and after-sales support covers on-site installation, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance. Whether our team or your contractor performs the work, record the water chemistry baseline, the electrical test results and the commissioning date in writing.
If your order also includes bathroom ceramics, lighting or outdoor furniture, group those categories on one purchase schedule so they travel together and reach site in the sequence your builder needs them. Our product range covers outdoor furniture, interior fixtures, wall and ceiling finishes and swimming-pool equipment, which is what makes a single coordinated shipment practical.
A short pre-order checklist
- Configuration sheet confirmed in writing: pumps, jets, control system, lighting, ozone and any options such as heat pump or sand filtration.
- Electrical requirement stated against the chosen configuration and checked by your electrician.
- Site measurements, access route and base loading signed off by your builder or engineer.
- Delivery term agreed in writing, with customs clearance and final-leg responsibility named.
- Packing list reviewed against the lifting equipment available at destination.
- Commissioning party, inspection checklist and handover documents agreed before shipment.