Outdoor Swim Spa WS-PC01A

Outdoor Swim Spa WS-PC01A

Description

Outdoor Swim Spa WS-PC01A is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 3000x930mm. Features shown in the catalog: Water jets, LED lighting, Ozone. Confirm included equipment and electrical requirements for the selected configuration.

Description

Model information

  • Model: WS-PC01A
  • Catalog dimensions: 3000x930mm
  • Control system: 1set
  • Water pump: 2pcs
  • Filter pump: 1pc
  • Jet total: 28pcs
  • LED lights: 1pc
  • Small LED lights: 9pcs
  • Total power: 3.25kW
  • Features shown: Water jets, LED lighting, Ozone

Optional accessories

Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.

Features

  • - Water jets
  • - LED lighting
  • - Ozone