A swim spa of this size is a long-term commitment, not an impulse purchase. Before you issue a purchase order for the Outdoor Swim Spa WS-130CⅢ-U, the questions that matter most are about fit, equipment scope, power supply and site preparation. Below is the sequence we recommend to buyers, contractors and project teams, with the catalogue data you can check against while you ask them.

1. Does the footprint actually suit your site?

The catalogue lists this model at 11830 × 3000 × 1430 mm. That is an elongated shell, so the first conversation should be about how it sits on your plot rather than whether you like the water.

  • Which orientation gives you the swimming lane you want, and where does the long axis run relative to boundaries, views and wind?
  • Is the shell going onto a slab, a deck or in-ground? What bearing capacity has the local engineer confirmed for a fully flooded basin of this plan area?
  • How will the unit reach the site — crane, forklift or both — and is there clear access from the delivery vehicle to the final position?
  • Where do the steps go, and does that position clash with railings, planters or traffic routes on the deck?

Send your site plan and a level survey to the supplier before they quote. A drawing at this stage prevents an expensive re-pour later.

Catalogue data for Outdoor Swim Spa WS-130CⅢ-U

ModelWS-130CⅢ-U
Catalogue dimensions11830 × 3000 × 1430 mm
Control system1 set
Water pumps4 pcs
Filter pump1 pc
Jets, total23 pcs
LED lights5
Total power11.85 kW
Features shownWater jets, LED lighting, Ozone

2. What exactly is included in this configuration?

Model codes in a configurable range are easy to misread, and the two variants of the 130C differ. For WS-130CⅢ-U the catalogue records one control system, four water pumps, one filter pump, twenty-three jets in total, five LED lights and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as features. The related Outdoor Swim Spa WS-130CⅢ is listed differently: one water pump, twenty jets, seven LED lights, 10.85 kW total power and a swim training system of one set.

So ask directly: is the swim training system part of the –U specification you are being quoted, or an add-on? Get the included items written into the quotation line by line — pump count, jet count, light count and control package — instead of relying on a model number alone.

3. Which options do you need, and which do you not?

Catalogue-listed extras for this range include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both the budget and the plant space you need, so decide them before ordering rather than after delivery.

  • Heat pump: do you want year-round water temperature, or seasonal use only? Heating load drives running cost more than any other option.
  • Insulation: worth asking about for cooler nights and for sites where energy cost matters.
  • UV sterilisation and ozone: clarify how they work together and what chemical routine is still required.
  • Sand filtration: confirm the filter location, access for backwashing and the drain route.

Availability and compatibility of these options vary by model. Ask the supplier to confirm each option against your chosen configuration in writing.

4. What does the electrical supply have to deliver?

The catalogue shows 11.85 kW total power for this model. That number is a starting point, not a specification for your electrician. Ask for the circuit schedule: supply voltage and phase, dedicated circuits for pumps and heating, breaker ratings, cable runs, bonding and earthing details, and where the control panel will be mounted for service access.

Then hand that schedule to a local licensed electrician and confirm it against your national and local wiring rules. Importers should not assume a supplier's default supply arrangement matches what the local authority will sign off.

5. Who prepares the base, and who does the installation work?

Draw a clear line between supplier scope and buyer scope. Ask which party handles excavation, the concrete plinth and curing time, waterproofing, crane hire, connection of power and drainage, backfill and reinstatement of the surround. Muddy responsibility is the usual cause of delay on projects like this.

SANTERSON describes turnkey delivery for villa and hospitality work — design consultation and space planning, product specification, manufacturing and quality control, project management and site coordination, then installation and handover — together with logistics and door-to-door delivery and installation and after-sales support. Ask which of those stages are included in your quotation, who attends on site, and what you must complete before the unit arrives.

6. How will it be maintained, and by whom?

Ask for the commissioning pack: as-built equipment list, wiring diagrams, control system manual, spare-parts list with part numbers, warranty terms in writing, and the consumables you need to keep on site. Then ask about response — who answers when a pump fails, what parts ship from, and how a technician is dispatched.

Warranty length, exclusions and service response are marketing statements until they appear in your contract. Read them before signing.

7. What does the whole order cost, delivered?

Compare quotations on a landed basis. Ask for the Incoterm, freight and insurance, expected container arrangement, customs documentation, import duty and tax, inland transport to site and crane hire. A unit that looks cheap ex-works can end up the most expensive line on your budget once delivery and plant are added.

Before you sign — a short checklist

  • Signed site plan with orientation, access route and crane position
  • Engineer-approved base design with confirmed load capacity
  • Itemised equipment list matching your exact model code
  • Agreed option list with written compatibility confirmation
  • Electrical schedule reviewed by a local licensed electrician
  • Split scope of works: supplier versus buyer, with dates
  • Landed-cost quotation including freight, duty and lifting
  • Warranty terms, spare parts list and service response in the contract

Send us your drawings first

If you are specifying a swim spa for a villa or hospitality project, share your layout, local climate and intended use pattern with our team before we quote. As a China furniture and building materials manufacturer working on complete villa and hotel fit-outs, we can coordinate the swim spa alongside outdoor furniture, paving, screening and interior fixtures so one supplier carries the whole package.