Outdoor Swim Spa WS-130CⅢ is part of a configurable outdoor swim and hydrotherapy range. Catalog dimensions: 11830x3000x1430mm. Features shown in the catalog: Water jets, LED lighting, Ozone, Swim training system. Confirm included equipment and electrical requirements for the selected configuration.
Catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model; confirm the selected configuration before ordering.