A decorative wall panel can change the look of a living room, a hotel lobby or a villa bedroom in a single afternoon on site — but only if the panel you order is the panel your drawing shows. Most delays we see from project buyers do not start at the factory door; they start with an enquiry that leaves out half the information. Before you contact SANTERSON furniture and building materials about interior wall panelling, gather the items below. Each one shortens the quotation cycle and removes a possible rework.

1. The room, not just the product name

The same surface finish behaves differently on a villa TV wall, a hotel corridor and a restaurant feature wall. Tell the supplier where the panel is going and how the wall is built.

  • Room type and daily use: private residence, guest room, lobby, F&B area, office, showroom.
  • Substrate behind the panel — plasterboard, brick, concrete, existing tile or old paint — and whether it is flat and dry.
  • Wall height and any obstructions: skirting, cornices, switch plates, air grilles, coving lights.
  • Whether the wall is straight, curved or includes arches and reveal niches.

Curved and shaped surfaces are the single most common reason a panel order goes wrong. Our flexible wood grain cement wall panel is a bendable mineral sheet that can be rolled and formed onto curved walls and arches, which rigid board cannot do — but we can only recommend it if you tell us the geometry in advance.

2. Quantities with a waste allowance, and a measured drawing

Send a simple sketch or a marked-up plan showing each panelled area with dimensions in millimetres, plus the total square metres per finish. Note where you want a feature break, a shadow gap or a mitre return. A measured drawing lets us produce a cutting layout instead of a rough area estimate.

  • Total area by finish type, not one combined figure.
  • Piece count and preferred module size, if the design uses repeated panels.
  • Edge and trim details: mitred corners, metal profiles, end caps, reveal trims.
  • A spare allowance for on-site cutting — decide it with us rather than guessing alone.

3. Finish direction: texture, colour and effect

Decorative panels now simulate stone, timber, fabric and plaster, so "wood look" is not a specification. Say which material family you want and send a reference image or a physical sample.

If the design calls forWhat to send with the enquiry
Timber, stone or fabric effect on a flat wallReference photo plus the intended sheen level; our modern decorative wall panel for interior decoration supports custom size, colour and surface pattern.
Relief and shadow play on a feature wallDepth of relief you expect and lighting plan; see the luxury decorative 3D wall panel, where size, colour and pattern are made to order.
A whole wall system with integrated storage or nichesLayout drawing; wall panel systems are made-to-measure, so dimensions and finish must be confirmed per space.
Surface continuity with doors and joineryDoor schedule and joinery elevations; integrated door and panelling must be coordinated in one drawing set.
Quiet rooms, meeting rooms, home cinemaRoom volume and the acoustic target you are designing to; acoustic panels are configured per project.
Stone or marble look without slab weightPanel size and joint preference; stone and marble panels are supplied to project dimensions.

For two related catalogue items — the decorative wall panel listed at 2227 and at 2237 — the published descriptions are close but not identical. Quote the item number you want, and ask us to confirm the current specification in writing before production.

4. Technical points to settle before you order

Product pages list general advantages such as light weight, moisture resistance, easy cutting and low maintenance. Treat those as starting points and confirm what your project actually needs:

  • Fixing method for your substrate — adhesive, mechanical clip system or battening — and who supplies the subframe.
  • Fire performance required by the specifier, and which test report supports it for the chosen finish.
  • Behaviour in humid interiors, and whether the finish is specified for wet areas.
  • Tolerances on panel size and thickness, and how joints are meant to be closed on site.
  • Cleaning regime and what must not be used on the surface.

Ask for a physical sample of the exact finish, in the light conditions of the room. A panel that reads as warm oak under a lobby downlight can read as grey plywood under daylight. Sample approval is the cheapest decision in the whole process.

5. Commercial and logistics details that speed up the quotation

As a one-stop furniture and building materials supplier, we quote panelling alongside cabinetry, flooring, lighting and ceramics for the same project, which is where consolidated shipments pay off. Have these ready:

  • Delivery address and Incoterms you intend to work to; our logistics and door-to-door delivery service covers sea, air and rail freight with the paperwork that goes with it.
  • Required site date, working backwards: sample approval, production, packing, transit, clearance.
  • Whether you need custom or OEM work — our custom and OEM service covers bespoke finishes, dimensions and branding, with flexible order quantities.
  • Who installs. If you want it handled, installation and after-sales support is available; tell us the site access conditions and working hours.
  • Your purchase order format and any inspection or release-note requirements.

Villa and hospitality buyers in Australia often combine panelling with joinery and flooring in one consignment. Project references on this site include villas in Sydney, Melbourne, Perth and North Turramurra; scope details are on each case page rather than assumed here.

A short pre-enquiry checklist

  • Measured drawing with panel areas in millimetres and per-finish totals.
  • Substrate description and fixing preference.
  • Reference image or sample, plus item number where a catalogue finish is intended.
  • Curved, arched or niche details called out clearly.
  • Fire and moisture requirements stated by the specifier.
  • Site date, delivery address and Incoterms.
  • Sample approval step built into the programme.

Send those seven items and a quotation for building and construction materials comes back with a cutting layout rather than a set of questions. Contact SANTERSON with your drawing and finish reference, and we will confirm the specification, the sample route and the delivery plan for your wall.