A curved reception wall, a column wrapped in stone, a headboard feature that has to travel in a container and still look like natural travertine on arrival. These are the jobs where MCM flexible travertine stone veneer earns its place on a project schedule. It is thin, light and bendable, so it wraps surfaces that rigid stone cannot, and it can be cut on site without heavy equipment.

The material itself is only half the job. The part that decides whether a wall cladding order arrives complete and installs cleanly is quantity planning and coordination with everything else on the wall line. This guide walks through both, using the categories SANTERSON actually supplies.

What the material is, before you count it

MCM flexible travertine stone veneer is a modified clay sheet that replicates the hole texture of natural travertine. Because it is thin and flexible rather than rigid, it can be bent onto curved walls, cylinders and shaped surfaces. The product range also includes an MCM flexible rammed earth panel with the same bendable format and a rough rammed-earth surface, which matters when one project needs two different soft-stone finishes across different zones.

Two properties drive the whole quantity exercise. First, the sheets are adhered to a prepared base with tile adhesive and cut on site with simple hand tools, so waste is a cutting decision rather than a fabrication decision. Second, being lightweight reduces wall load and simplifies packing and transport, which changes how you group it with other wall products in one shipment.

Step 1: Break the elevation drawing into three quantity zones

Do not order soft stone by total square metres. Split the elevation into flat runs, curved and shaped surfaces, and edges and corners. Each zone behaves differently when you count it.

ZoneWhat to measure from the drawingHow it changes the order
Flat wall runsNet face area of each wall, minus openingsStraight-cut sheets; standard waste allowance applies
Curved walls, columns, arches, shaped panelsDeveloped (unrolled) surface area, not the flat projectionCut patterns and joint layout must be agreed before production, because these are the surfaces the product is specified for
Edges, corners, reveals, terminationsLinear metres of each external and internal cornerDetermines how much trimming and joint detailing the site team handles versus what is pre-cut

A curved wall measured as a flat projection is the most common quantity error on soft-stone orders. The developed area of an arc is larger than its face, so the order comes up short once the sheets start bending.

Step 2: Lock the finish and colour before quantities are fixed

Colour runs in stock vary, and a soft-stone wall is only as good as the match between batches. Before you finalise quantities, confirm the colour and texture selection against a physical sample of the exact product page you are specifying. The same logic applies if the project mixes travertine-look sheets with rammed-earth panels: both finishes need to be approved at the same time, because a late change on one zone changes the cutting plan for the wall it meets.

Sample first, then count. A colour or texture swap after quantities are locked usually means re-cutting the curved-zone layout, not just changing a code on the order.

Step 3: Decide what else sits on the same wall

Soft stone rarely installs alone. It terminates into paint, meets a niche, runs under a lighting line, or butts against a sliding panel system. Coordinate these before you order, because each one sets a dimension the cladding has to fit.

  • Wall panels and cladding in the same elevation. Where a feature wall changes material, fix the transition detail and who supplies the trim. The wider wall panels and wall cladding range covers rigid decorative panels, aluminium honeycomb cladding for exterior and interior walls, and flexible cement wood-grain sheets, so a project can source the soft stone and the adjacent hard finishes from one production plan.
  • Built-in joinery and panelling. Wardrobes, media walls and concealed doors set the finished wall line. Confirm which trade sets out first: cladding to joinery, or joinery over a clad substrate.
  • Lighting and services. Wall sconces, backlit feature walls and recessed channels need their positions cut out of the sheet. Mark them on the layout drawing before cutting, not after fixing.

Step 4: Group the order so it ships and installs in sequence

Flexible stone is light, so it can be packed with heavier wall products without blowing up the weight of a container. That is an advantage for procurement: one consolidated shipment for the wall package means one delivery window on site and one receiving inspection.

Sequence matters more than speed. Order in the order the trades arrive:

  • Substrate preparation materials and adhesives compatible with the base you are fixing to, whether cement board or gypsum
  • The cladding sheets for the zones being installed first, flat runs ahead of curved zones so the site team proves the joint layout on straight walls before cutting arcs
  • Adjacent wall products with matching edge profiles and thicknesses
  • Spare sheets held back for snag rectification and any late design change

Step 5: Set the spares and site-cutting allowance properly

Because sheets are cut on site, your allowance should reflect how much cutting the job involves rather than a fixed percentage. A wall of long flat runs with few openings needs less than a lobby with columns, arches and service cut-outs. Count curved-zone pieces separately and add spares in the same colour batch, since a later top-up may come from a different run.

Coordinating through a one-stop supplier

When wall cladding, joinery, lighting and finishes come from separate vendors, quantity errors surface at site handover instead of in the shop drawing. As a hospitality furniture supplier for hotel, villa and commercial projects, SANTERSON supplies this soft stone alongside furniture series, building and construction materials and interior fixtures, with custom and OEM service, logistics and door-to-door delivery, and installation and after-sales support under one project workflow. For a wall package that means the soft stone, the panels it terminates into, and the joinery in front of it are specified against the same drawings.

The practical coordination points to settle with your supplier before production starts:

  • A single set of dimensioned elevations for every clad surface, including developed measurements for curves
  • Written confirmation of colour, texture and finish per zone, referenced to the approved sample
  • The transition details where cladding meets paint, joinery, glass or metal trim
  • Packing split by installation zone, so the first-fix material is not buried under last-fix material
  • A named contact for production queries and for snag rectification after installation

Common quantity mistakes to avoid

  • Measuring curved surfaces as flat projections, which under-orders the exact zones the product is specified for
  • Ordering all colours at once with no spares held in the approved batch
  • Fixing cladding before service positions and lighting outlets are marked on the layout
  • Treating edge and corner detailing as site improvisation rather than a pre-agreed item
  • Skipping the physical sample because the catalogue photo looked right

A short checklist before you place the order

  • Elevations dimensioned, with developed areas for every curve and column
  • Colour and texture approved against a physical sample of the specified product
  • Flat-run, curved-zone and corner quantities listed separately
  • Transition details agreed with joinery, lighting and wet-area trades
  • Packing split by install sequence; spares added in the same batch
  • Adhesive and substrate requirements confirmed for the base you are fixing to

Send us your wall elevations. SANTERSON supplies MCM flexible travertine stone veneer and other wall cladding products as part of a one-stop furniture and building materials package for hotel, villa and commercial projects. Share the drawings, the zones and the target programme, and we will quote quantities, packing split and production sequence together.