A rendered kitchen looks finished long before the cabinetry is actually on site. The gap between a designer's open-plan kitchen image and a delivered, installed run of cabinets is filled by one document: the enquiry you send to your supplier. For villa, apartment and hotel suite projects where the kitchen opens into the living area, that enquiry has to carry enough information for open plan kitchen cabinetry to be quoted as a made-to-order interior fixture rather than guessed at as an off-the-shelf product. This article sets out what to put in the brief, what the supplier needs from you in return, and how the enquiry moves into production, delivery and installation.
What a design brief usually leaves out
Most briefs arrive with a floor plan, a mood board and a door colour. Those three items fix the look but not the build. In an open-plan layout the cabinetry is visible from the living space, so the details that are normally hidden inside a separate kitchen become design decisions: the side panels that face the lounge, the height of the tall units in relation to the ceiling line, how appliances are enclosed, and whether the run terminates in a finished return or an abutting wall.
Before you send anything, settle these four points internally:
- The exact wall lengths and the position of structural columns, floor boxes, waste outlets and rangehood ducting.
- Which appliances are built in, and their model dimensions, so the appliance tall cabinets can be sized around them.
- Who owns the benchtop and splashback scope, because stone thickness determines carcass and door reveal details.
- The finish standard for externally visible cabinet faces, since an open-plan run is read as joinery, not as utility furniture.
The information a supplier needs to quote properly
Our open concept kitchen cabinets are made to the layout, dimensions, door style, colour and surface finish specified on each project, so a workable enquiry reads more like a small specification than a product request. The table below shows what we use at each stage and what happens when it is missing.
| Brief item | Why the supplier needs it | Risk if omitted |
|---|---|---|
| Room layout with dimensions, ceiling height and appliance positions | Sets carcass sizes, tall-unit heights and the working triangle | Cabinets arrive sized to a drawing that no longer matches site conditions |
| Door style and panel material preference | Narrows handleless, flat panel, shaker and aluminium frame options to a buildable family | Quotation covers a construction the project cannot fund or maintain |
| Surface finish and colour reference | Determines lacquer, acrylic, melamine, PVC or wood veneer production route | Colour approved on screen does not match the delivered panel |
| Storage structure per unit | Drives drawer rails, pull-out corners, lazy susans and open shelving choices | Interior fittings are added late as variations |
| Hardware expectation | Hinges, drawer slide rails, support legs and connecting brackets can be supplied matched to the cabinets | Mixed local hardware delays installation and complicates replacements |
| Quantity of identical units and project type | Separates single villa work from repeat hotel suite or apartment batches | Pricing and production planning are based on the wrong volume assumption |
| Destination, delivery address and access notes | Determines packaging, container loading and door-to-door routing | Freight is quoted to port only, leaving last-mile cost unowned |
Send drawings in any format your design team already uses. What matters is that dimensions, appliance models and finish references are stated in text, not carried only inside a rendered image.
Matching the brief to a cabinet family
Open-plan projects usually narrow quickly to one of three directions once the living-area sightline is considered.
Handleless and flat panel for a joinery look
Where the kitchen reads as wall panelling, flat panel and handleless construction keeps the facade uninterrupted. Our custom built-in kitchen cabinets are supplied as interior fixtures for hotel, apartment and residential work with customisable sizes, panel materials and surface finishes, and matching cabinet hinges, drawer slide rails, support legs and connecting brackets on request. This is the route most specifiers choose when the same cabinetry language has to continue into wardrobes and sideboards elsewhere in the building.
Glass front and aluminium frame for display
Open shelving and glass-front units carry tableware and glassware as part of the living room display. Aluminium frame cabinets with clear or frosted glass fronts, and integrated cabinet lighting, are common in suites and serviced apartments where a curated display is part of the handover standard.
Two-tone and veneer to zone an open plan
Two-tone combinations and wood veneer doors let one run define the kitchen without a wall. A darker base with a lighter upper, or a veneer island against painted panels, separates cooking from sitting while keeping one material palette.
From enquiry to production: how the stages connect
SANTERSON works as a furniture and building materials manufacturer on custom and OEM orders, so an approved cabinetry enquiry normally runs through the following steps. The sequence below follows the workflow described on our service pages; timings are confirmed per project rather than promised as a standard lead time.
- Consultation and space planning. Layout, storage structure and finish direction are reviewed against your drawings.
- Detail confirmation and quotation. Panel material, door style, colour, hardware list and quantities are fixed, then priced.
- Prototyping where required. Through our custom and OEM service, bespoke finishes, textures and construction details can be developed before the full run is produced.
- Production and quality control. Cabinets are built to the approved specification with matching hardware supplied as agreed.
- Logistics. Freight forwarding by sea, air or rail, with packaging, container loading, customs paperwork and door-to-door delivery arranged for the project address.
- Installation and after-sales. On-site installation support, inspection of snags, spare parts and maintenance are covered under installation and after-sales support.
Because the same supplier handles cabinetry alongside other fit-out items, an open-plan kitchen enquiry is also the point at which it makes sense to group adjacent scope. Flooring, wall panels, ceiling linings, lighting, bathroom fixtures and loose furniture from our interior fixtures range can be specified together, which reduces the number of separate trades coordinating on site.
Pre-enquiry checklist
- Dimensioned plan and elevations, with ceiling height and service positions marked
- Appliance schedule with model numbers and cut-out dimensions
- Benchtop and splashback material with thickness
- Two or three door-style references and a colour or finish reference
- Hardware preference: handleless, push-to-open or specified pulls
- Unit quantities, split by project type (villa, apartment, hotel suite)
- Delivery address, access constraints and preferred delivery method
- Your decision points: who signs off samples, drawings and the final handover
A brief that answers these questions in one message usually returns a quotation with construction already resolved. A brief that does not returns a range of options and a second round of questions.
Common enquiry mistakes and how to avoid them
- Quoting from a rendered image only. Renders do not carry dimensions or construction. Always attach text-based measurements.
- Naming a colour without a reference. "Matte grey" covers many products. Give a finish name, sample photograph or standard reference.
- Leaving hardware to site. Specify hinges and rails in the enquiry so replacements match later.
- Treating freight as an afterthought. Confirm whether delivery is to port or to the project address before production starts.
- Hiding the open-plan sightline. Tell the supplier which cabinet faces are visible from the living area; those panels are finished differently in most builds.
Send us your kitchen brief
If you are specifying cabinetry for a villa, apartment or hotel suite project, send the plan, appliance schedule and finish references and we will come back with a construction proposal and quotation. Contact PHILLIP on +86-13928214007 (phone or WhatsApp), email santerson@qq.com, or use our contact page. Business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).