Why the Same Model Can Arrive as Two Different Spas

Outdoor Swim Spa WS-S04 is listed at 4090 × 2200 × 1110 mm, with 26 jets including four water columns, three water pumps, one filter pump, ozone sanitisation, LED lighting and a waterfall feature, on a total connected load of 8.25 kW. Those figures are the catalogue baseline, not a fixed delivery specification. The same shell can be quoted two or three ways depending on what you ask for and what your site allows. For a villa terrace, a resort garden or a hotel outdoor area, the conversation you have with the factory before ordering matters more than the model number itself.

The practical question for a buyer is not whether WS-S04 can be customised, but which options change the specification enough to affect site preparation, electrical work and handover. Below are the option groups worth putting on the table, and what each one actually decides.

Start With the Site, Not the Spa

Two questions shape every other choice: where the unit sits and who will use it. A spa placed on a finished timber deck, on a poured slab, or recessed into a pool surround each need different access, drainage and structural decisions. Our Turnkey Villa Furnishing workflow treats the swim spa as one item inside a wider outdoor package, which is useful when you are also ordering outdoor furniture, pergolas and loungers for the same terrace.

  • Footprint and clearance. Confirm the 4090 × 2200 mm plan against your available space, then add room for steps, filtration access and any waterfall overflow.
  • Water depth and user profile. The catalogue shell is 1110 mm deep. If children or guests who do not swim will use the spa regularly, discuss how that depth works with your intended seating positions before you commit.
  • Deck loading and drainage. A filled shell plus occupants is a heavy point load. Give your engineer or landscapist the catalogue dimensions and let them size the supporting structure; we do not certify local structural designs.

Water Treatment and Sanitisation

Ozone is shown as a standard feature on WS-S04. UV sterilisation appears in our optional accessory list, and the two are not interchangeable: ozone handles oxidation in the main loop, while UV passes water through a lamp chamber. For a hotel or resort spa with high turnover, ask which combination you are being quoted and what consumable replacement intervals each system carries.

  • Filtration choice. The baseline is one filter pump; sand filtration is listed as an option. Ask for the filter media, cleaning routine and spare-part availability in writing.
  • Chemical load. Higher bather load means higher sanitisation demand. Tell us the expected daily use so the treatment package matches it rather than a residential assumption.

Jets, Water Columns and the Waterfall

The catalogue records 26 jets in total with four of them as water columns, plus three water pumps. Jet count is easy to fixate on; jet placement is what changes the experience. Tell us whether the spa is mainly for post-training recovery, casual soaking or guest entertainment, and we can map seating positions to jet groups rather than simply adding nozzles.

  • Waterfall. Shown as standard on this model. Confirm whether it runs from a dedicated pump or shares the water pump set, because that affects simultaneous use of jets and waterfall.
  • Seating layout. Where people sit determines which jet banks matter. Share your intended occupancy before we finalise the layout.

Heating, Insulation and Running Cost

Total power for the WS-S04 catalogue configuration is 8.25 kW. A heat pump is listed among optional accessories, along with insulation. This is the option group that most affects your electricity bill and how often the spa is realistically used in cooler months.

  • Heat pump sizing. Match the unit to your target water temperature and the local winter, not to a generic figure.
  • Insulation and cover. Shell and cabinet insulation plus a fitted cover reduce standby loss. Ask what is included in the quoted package versus priced separately.
  • Electrical supply. Confirm supply capacity, protection devices and cable routing with your electrician using our stated configuration figures. Local wiring rules and approvals are your contractor's scope.

Control System and Lighting

One control system set is listed as standard, together with three LED lights and 18 small LED lights. Control placement is a real decision: a panel mounted at the spa edge suits residential use, while a shared or remote position may suit a hotel where staff manage schedules. Ask what the controller actually manages — pumps, heating, ozone and lighting zones — and whether scenes or timers are available.

Finishes, Steps and Surround Integration

Cabinet cladding, steps and the way the spa meets the surrounding deck are where a catalogue unit starts to look like part of the building. Our Custom & OEM Service covers bespoke material finishes and textures, prototyping and branding on request, so cladding can be matched to adjacent joinery or exterior panelling. Where the surrounding architecture calls for a non-standard outline rather than the rectangular shell, our Customizable Shape Outdoor Spa covers square, round, oval and curved configurations with an acrylic shell.

How WS-S04 Compares With Nearby Configurations

Two variants in the same family show how much specification moves within a similar footprint. This is why we recommend confirming the equipment list line by line rather than assuming a shared spec across model codes.

ItemWS-S04WS-S04BWS-S04X
Catalogue dimensions (mm)4090 × 2200 × 11103900 × 2200 × 14503990 × 2260 × 950
Jet total26 (4 water columns)31 (6 water columns)85
Water pump / filter pump3 / 13 / 13 / 1
Total power8.25 kW10.35 kW8.85 kW
Features shownJets, LED, Ozone, WaterfallJets, LED, OzoneJets, LED, Ozone, Waterfall

Figures above are transcribed from the catalogue pages for each model. Options change what is delivered, so the signed specification sheet governs.

What to Send Us With Your Enquiry

A complete enquiry lets us quote a buildable configuration the first time:

  • A site photo or layout drawing with the available area and surface type.
  • Intended use — residential family, guest villa, hotel or resort — and rough daily occupancy.
  • Target water temperature and months of use.
  • Preferred sanitisation package and filtration type.
  • Cladding or finish references that must match existing exterior materials.
  • Delivery location and whether you need Logistics & Door-to-Door Delivery.

Full optional accessory availability on this range includes control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm the selected configuration before production starts.

Delivery, Installation and After-Sales

SANTERSON has been manufacturing furniture and building materials since 2008 and supplies swim spas alongside the outdoor collections that surround them. Freight is arranged by sea, air or rail with customs paperwork and container loading handled on our side; installation, snag inspection, warranty cover and spare parts sit under Installation & After-sales Support. Import terms, duties and local approvals are confirmed case by case for each destination.

Talk through your WS-S04 configuration before you order

Send us the site layout, intended use and target temperature, and we will come back with a specification sheet for Outdoor Swim Spa WS-S04 that lists every pump, jet group, treatment option and finish included. Contact PHILLIP through our contact page to start the conversation.