Buying guide / Built-in furniture
A mixed open and closed storage wall looks simple on a mood board and complicated on site. This checklist sets out exactly what to specify, confirm and compare before you place an order with SANTERSON, so the unit you approve in drawings is the unit that arrives in the room.
Mixed storage works because it does two jobs at once: closed cabinets swallow the clutter, open shelves and niches carry the display. The difficulty is that a wall system is not one product but an assembly of carcasses, doors, shelves, panels, hardware and sometimes lighting, each with its own dimension and finish decision. Most problems on these projects come from decisions being left open, not from the workmanship.
The Santerson Mixed Open & Closed Storage listing sits in our Integrated Storage Walls collection and is made to measure: layout, dimensions, material and finish are specified per project rather than chosen from fixed sizes. That flexibility is the reason a written checklist matters — every open question becomes a variation later.
1. The scope block: what the wall actually has to do
Before any drawing, write down how the wall will be used, room by room. This is the part most buyers skip and the part that decides internal layout.
- What goes in, in what form. Hanging items, folded stacks, deep drawers for pots or linens, books, display objects, equipment that needs ventilation or cables.
- Who uses it and how often. A guest villa wardrobe and a family living-room wall are loaded differently.
- What must be hidden versus shown. Decide the ratio honestly; too much open shelving in a busy room turns untidy within weeks.
- What sits on the open shelves. Objects need depth and a load path, so their size belongs in the specification, not in a later email.
A useful working split for living areas is to keep roughly two thirds closed and one third open, then adjust for the room. Bedrooms usually need more hanging length; hallways need shallow closed storage for coats and shoes; media walls need clear sightlines to the screen.
2. The measurement block: dimensions to fix on site
Because these systems are made to measure, the survey is where accuracy is won or lost. For each wall, record and confirm in writing:
| Item to confirm | Why it matters |
|---|---|
| Total run length and finished height, including skirting, cornices and any ceiling rebate | Determines whether the wall is a floor-to-ceiling build or stops below the ceiling line, and how the top closure is detailed. |
| Wall out-of-plumb and out-of-square readings | Older villas and renovated apartments rarely run true; scribing and filler panels must be designed in, not improvised on site. |
| Obstructions: switches, sockets, radiators, downpipes, return air grilles, light fittings | Each one either moves or is built around. Both options cost time if discovered after production starts. |
| Floor and ceiling finished levels | A wall ordered against unfinished levels will not fit the completed room. |
| Door swing arcs and traffic paths | Cabinet doors, sliding panels and drawers need clearance to open fully without hitting each other or furniture. |
| Adjacent finishes: flooring, plasterboard, tiles, joinery lines | Decides the reveal, trims and whether panels meet flush or with a shadow gap. |
Where the wall runs full height, Santerson Full Height Storage Walls is the reference detail: made-to-measure sizing with configurable material and finish options, planned around the actual room.
3. The configuration block: open and closed proportions and internals
This is where the checklist earns its keep. Specify each zone separately:
- Closed zones: door type (hinged, sliding, pocket or concealed), handleless or handled, and whether the doors run floor to ceiling as one panel or are split.
- Internal fit-out per bay: hanging rails at what heights, how many adjustable shelves, deep drawers versus standard drawers, pull-out trays, and dedicated compartments for tall or awkward items.
- Open zones: shelf depth, clear vertical spacing between shelves, span of each shelf, and whether the ends are closed returns or open edges.
- Niches: recessed display niches read as architecture rather than furniture. Santerson Open Display Niches are specified with layout, dimensions and finish set to the space, so niche size and position belong in the drawings.
- Sliding elements: Santerson Sliding Storage Panels let part of a wall change character on the move, but tracks, panel widths and overlap need to be drawn before the frame is built.
- Media zones: if the wall carries a screen, Santerson Integrated Media Storage and the Storage & Display Combo detail the screen recess, cable routes and equipment ventilation.
Ask for a dimensioned elevation of every bay with internals drawn, not just a rendered perspective. A render shows intent; an elevation is what you check on delivery.
4. The materials and finish block
Configurable listings such as these do not carry one fixed specification, so the buyer has to state it. Confirm in writing:
- Board material and construction for carcasses, doors and shelves, and which parts use which material.
- Surface finish system — melamine, lacquer, acrylic, veneer or painted — and the exact colour or grain reference. Wood tones read very differently on a large door panel than on a sample tile.
- Edge treatment for visible edges, especially on open shelves and niches.
- Grain direction and matching across a run of doors, and how veneer batches are matched.
- Where the same finish continues into wardrobes, tall cabinets or wall panelling, so the joinery and the wall read as one system.
- Hardware brand, duty rating and cycle expectation for hinges, slides and sliding-track systems, plus what is covered if a component needs replacing later.
Order a physical sample panel of the exact door finish, edge band and shelf material you have specified. Approving a finish from a screen is the single most common source of disappointment on large joinery runs.
5. The services block: lighting, cables and clearances
Integrated lighting turns a storage wall into a feature, but it is an electrical item as much as a joinery one. Santerson Integrated Lighting Systems and the Modular System with Lighting are both specified per project, so the checklist should cover:
- Lamp type, colour temperature and output for each open zone or niche.
- Driver and transformer location — accessible for service, not sealed behind a fixed panel.
- Switching and control: local switch, remote, sensor or integrated with room lighting.
- Cable routes, trunking and any cut-outs required in carcass panels.
- Heat clearance for enclosed equipment bays and the ventilation route for them.
Confirm electrical ratings and installation requirements against the final configuration, and have local trades complete connection where required by your project. This is also the stage to reconcile any structural fixings a tall or long run needs.
6. The supplier and delivery block
Storage walls are usually manufactured to order, so the commercial terms decide how smooth the job runs. For an international project, check:
| Question | What a clear answer looks like |
|---|---|
| Who measures and who issues the final shop drawings? | A named party, with drawings signed off before production starts. |
| What is included in the price? | Carcasses, doors, shelves, hardware, trims, lighting components, packing — listed line by line. |
| How is the order split into batches and shipments? | A delivery schedule that matches site sequence, not one drop for the whole building. |
| What packaging and container loading is used? | Panel protection and loading plan suited to long runs of finished joinery. |
| Who handles freight, customs paperwork and door-to-door delivery? | A defined scope with named documents, agreed Incoterms and insurance cover for your shipment. |
| Who installs, and who fixes snags afterwards? | On-site installation, inspection with a snag list, and a stated route for spare parts or replacement panels. |
SANTERSON works as a furniture and building materials supplier covering design coordination, custom/OEM manufacturing, logistics and door-to-door delivery, then installation and after-sales support. That single-source route means one party is accountable for the whole wall instead of three trades pointing at each other — provided you lock the drawings and the scope in writing before production.
7. The approval block: sign-off before production
Nothing on this list protects a project like a formal approval stage. Before release to the factory, hold one document set that contains:
- Dimensioned elevations of every bay, with open and closed zones marked.
- Internal layout schedule: shelf counts, adjustable-shelf pitch, hanging heights, drawer sizes.
- Finish schedule with sample references, edge details and grain direction.
- Hardware schedule with duty ratings.
- Lighting and electrical layout, including driver locations and control method.
- A named change-control route for anything revised after sign-off.
Treat anything approved verbally as not approved. On made-to-measure joinery, a late change is not an edit — it is re-manufacture.
8. The handover block: checking on delivery and after installation
- Count panels against the packing list before the site clears the delivery area.
- Check finished faces for transit damage while packaging is still intact.
- Verify dimensions of a sample of carcasses against the drawings before fixing anything.
- Confirm door alignment, drawer run and sliding action across the full run, not one bay.
- Test every light circuit and confirm driver access.
- Agree the snag list on the spot, with dates and responsibilities recorded.
- Keep the finish schedule and hardware schedule for future repairs and replacement panels.
A worked example: whole-house joinery with mixed storage
Our mid-century whole house custom cabinetry and built-in storage project shows how the checklist items appear in a real build: an integrated bay-window desk with multi-layer drawers uses a window recess that would otherwise be dead space; open white bookshelves beside the staircase carry display while vertical slat partitions divide the space without blocking daylight; and wood-grain kitchen cabinets with deep metal drawers were measured on site to sit around the appliances. Materials, colour, sizes and storage layouts were all set from the client's plan and habits — which is exactly what sections 1 to 4 of this checklist are for.
Common gaps to avoid: ordering against unfinished floor levels; leaving shelf depths unspecified until after production; approving finishes from a screen rather than a sample panel; forgetting driver access for integrated lighting; and assuming hardware duty ratings without asking. Each is cheap to fix on paper and expensive to fix on site.
Ready to specify your wall?
Send us the room drawings or photographs, the list of what needs to be stored and displayed, and your target finish. We will come back with a layout proposal, a specification to review and a quotation — and we confirm every dimension and finish in writing before production starts. Enquiries reach our team at Contact Us, and the full storage and built-in furniture range is under Products.