A floating modular living system looks identical in two quotations and behaves very differently on site. The difference is decided before production, when you compare physical samples with the written proposal. This guide walks through that comparison for Santerson Floating Modular Systems and the related modular shelving and living ranges, so buyers, builders and interior studios can judge like for like instead of judging on a render.

What you are actually comparing

Floating modular systems in this range are configurable rather than catalogued to a fixed size. The product pages describe made-to-measure sizing, selectable materials and finishes, and a layout drawn to suit each space. That means two proposals can carry the same collection name and still differ in panel substrate, edge treatment, bracket type, lighting specification and what is excluded from the price.

Treat the sample as evidence and the proposal as the contract that describes it. If a finish, dimension or hardware item appears on one and not the other, it is not confirmed. Santerson is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, and modular joinery of this type is produced to the approved specification rather than held as stock.

Step 1: put every sample in writing before you compare

Ask for one physical set per option under consideration, and record each item against a reference number that also appears in the proposal. For floating systems specifically, request:

  • A door or panel sample in the exact declared substrate, surface material and finish, including the reverse side so you can see how it is sealed.
  • An edge or profile sample, because a floating look depends on how the visible edge and shadow gap are formed.
  • The bracket, hanging rail or wall-fixing component that carries the load, plus the fixing method stated for your wall build-up.
  • A shelf or carcass corner sample showing board thickness and how the joint is made.
  • If lighting is in scope, a lit section showing the profile, diffuser and colour temperature switched on in daylight, not only at night.

Label each sample with the proposal reference and the date it was sent. Samples that cannot be tied to a document number are useful decoration and nothing more.

Step 2: read the line items, not the headline price

Modular systems are usually quoted as an assembly of measured sections. Compare proposals section by section using the same breakdown for each supplier.

Line itemWhat to confirm in the proposalWhat the sample should prove
Dimensions and layoutOverall width, height and depth per section; shadow gaps; ceiling and floor interfaces; drawn to your site dimensions.Board thickness and section depth match the drawing at scale.
Substrate and surfaceNamed board type and grade, plus the surface material (veneer, lacquer, melamine, acrylic or glass) rather than a colour code alone.Surface feel, grain direction and sheen match what you will live with under site lighting.
FinishSheen level, edge banding or wrapped edge, and the reverse-side treatment.Edge line is continuous, with no visible glue line or colour break at the corner.
Support and fixingsBracket or rail type, load allowance, and the wall build-up the fixing is designed for.Hardware is a named component you can source again for spares or site adjustment.
Integrated lightingDriver location, colour temperature, dimming method and how the cable is routed and concealed.Light output is even along the run with no hot spots through the diffuser.
Open versus closed sectionsWhich bays are open shelving and which are doors or drawers, listed per bay.Hinge, runner or handleless detail shown in your chosen finish.
Inclusions and exclusionsSurvey, drawings, packaging, freight, duties, installation, snagging and spares stated explicitly.Packaging quality on the sample carton indicates how sections arrive on site.
Where a proposal says only "floating modular system, as drawing", ask for the substrate, surface material, edge detail and hardware to be written into the quotation. Configurable listings on the site carry limited individual detail, so the approved specification is what protects both sides.

Step 3: compare the same system across the range

The modular collections are close cousins, and a fair comparison states which one you are buying. Useful references when you build your own side-by-side sheet:

Comparing these on one sheet exposes real differences: a floating wall-hung build carries fixing and shadow-gap questions that a floor-to-ceiling build does not, and a lit run adds driver access and cable routes to the drawing.

Step 4: score the proposal around the process

Product quality is only half of a modular purchase. The services wrapped around it decide how the job runs, and each stage should appear in the document you are comparing.

  • Design and detailing: the interior design service covers space planning, concept work, layouts and 3D visualisation, with drawing and production coordination. Ask which drawing set you receive at quotation stage and which is issued for approval before production.
  • Custom and OEM scope: bespoke finishes, textures and prototyping are listed under the custom and OEM service. Confirm minimum order quantities and lead time for your finish choice in writing.
  • Production and quality control: ask what is inspected before packing, and how sections are identified so the installer knows where each one goes.
  • Freight: the logistics and door-to-door delivery service covers freight forwarding, packaging, container loading, customs paperwork and tracking. Fix the Incoterms, who clears customs, and who pays duties for your destination before you compare prices.
  • Installation and after-sales: the installation and after-sales support page lists on-site installation, inspection and snagging, warranty coverage, spare parts and maintenance. Confirm who installs at your site, what the warranty covers and excludes, and how replacement panels are ordered later.

Step 5: run a five-question tie-breaker

When two proposals look evenly priced, these five answers usually separate them:

  1. Which document states the substrate and surface material by name, not by colour code?
  2. Which one names the hanging hardware and the fixing method for your wall build-up?
  3. Which drawing shows the shadow gap and the ceiling interface at a readable scale?
  4. Which price includes survey, installation and snagging, and which assumes you supply them?
  5. Which supplier can show how a matching panel will be re-ordered in two or three years?

A short checklist to send with your enquiry

Send the same request to each supplier so the replies line up: room elevation and wall build-up; required overall dimensions and bay mix; substrate and finish choices, or the sample reference you want matched; lighting scope if any; delivery address with Incoterms and who clears customs; installation responsibility; and your target site date. Ask for a section-by-section price that mirrors the table above. A one-stop furniture and building materials supplier should be able to answer all of these from one document, because design, production, freight and installation sit under the same roof.

For Australian villa and apartment work, the company publishes project references in Willoughby, Perth, North Turramurra, Melbourne and Sydney, and you can review them under project cases. Scope varies by case, so use them to judge detailing quality rather than as a promise about your own job. Import terms, duties and installer arrangements should be confirmed for each project.

Send drawings, room dimensions and the finish or sample reference you are evaluating, and the SANTERSON team will reply with a section-by-section proposal covering materials, fixings, freight and installation scope. Contact details are on the contact page.