A floating modular wall looks simple on a rendering and complicated on site. Before a project team signs off on Santerson Floating Modular Systems, the questions worth asking are not about style but about substrate, fixing method, service access and who signs each drawing. This note sets out the confirmations we recommend at approval stage, so the unit arrives ready to install rather than as a site problem.

What the product actually is

Santerson Floating Modular Systems sits inside our Modular Living Systems collection for residential and hospitality living projects. The unit is configurable rather than catalogued to fixed sizes: layout, dimensions, materials and finishes are specified per project, and the configuration sheet lists made-to-measure sizing alongside finish and material choices. That flexibility is the reason it works in villas, apartments and hotel guest rooms where a standard cabinet width never quite fits the wall.

It also sits between two other options in the same collection. Santerson Floor to Ceiling Modular Systems carries its load through the floor and needs no concealed wall support, while a modular system with lighting adds integrated lighting that has to be coordinated with electrical work. Choosing the floating version is therefore a structural and services decision as much as a design one, and that decision should be recorded before approval, not at handover.

Confirmations to close out before sign-off

1. Wall substrate and concealed support

A floating unit hangs from the wall, so the wall is part of the product. Before approval, get a written confirmation of the substrate at every fixing line: masonry, light-gauge steel framing with lining boards, timber studs, or a tiled surface over a screed. Where the framing is not solid, confirm whether blocking or a steel backing frame is required and who supplies it: our factory, the local framer or the tiler. If the wall build-up is already frozen by another trade's drawing, that conflict needs resolving now.

2. Load cases, not just unit weight

Ask for the intended use of each bay in writing: display and storage only, or a working surface, wall-mounted screen, or wet-area items. Storage loaded with books and glassware behaves very differently from a bay holding linens. We build to the loads you confirm; we cannot infer them from a mood board.

3. Dimensional tolerance and site verification

Confirm which dimensions are taken from drawing and which must be field-verified after the wall finishes are complete. Floating systems usually get measured twice: once for design coordination, then once on site after plaster, tiling or joinery is finished. Agree in advance who takes that second set of measurements and by what date, because a late re-measure pushes the production slot.

4. Finish and material schedule

Sign off the finish schedule item by item: door and panel construction, veneer or lacquer or laminate face, edge treatment, hardware, and the visible gap detail between modules. Where a finish has to match joinery supplied by another party, confirm whether a physical sample board, not a colour code, will be compared and approved.

5. Integrated lighting and electrical coordination

If your scheme includes lit shelving or a lit display niche within the floating run, confirm cable routes, driver locations, switching points and access to drivers before approval. Drivers need a reachable position; a sealed panel above them is a maintenance problem from day one. For schemes where lighting is central rather than incidental, the modular system with integrated lighting referenced above is usually the cleaner specification.

6. Interface with flooring, skirting and ceiling

Even a wall-hung unit meets other trades at its ends. Confirm how the run terminates at a tiled edge, at a door reveal, at a curtain recess, and where it passes a skirting line. Get one coordinated setting-out drawing that shows these interfaces rather than separate detail sheets from each supplier.

7. Packaging, sequence and installation responsibility

Confirm delivery terms for the project (port or door, container loading plan, module labelling by room) and which modules arrive in the first shipment if the programme is phased. Then confirm who installs: our on-site installation service, your joiner, or a mix. That choice determines who owns the snag list.

Approval itemEvidence to have on fileWho confirms
Substrate and backing frameWall build-up detail at fixing linesStructural / local builder
Intended loads per bayRoom-by-room use scheduleClient or interior designer
Final dimensionsField verification after finishesSite surveyor
Finish scheduleApproved sample boardsDesigner and factory
Lighting and driversCoordinated electrical setting-outMEP consultant
Delivery terms and phasingAgreed Incoterms and shipment planProcurement and logistics
Installation and snagsNamed installing partyProject manager

What we need from the project team to start production

A signed setting-out drawing at fixing level, the wall build-up detail, the load schedule per bay, the approved finish samples, and confirmation of who installs. Once those are in place, the made-to-measure configuration moves into production without further queries.

How this fits a wider fit-out package

Floating modular runs rarely stand alone. In the villa and apartment projects we supply through our turnkey solutions, the same wall usually carries wardrobes, media units, open shelving and integrated storage walls, and it sits near engineered flooring, decorative wall panels and lighting from the same order. Ordering them together under one-stop furniture and building materials supply means one setting-out drawing governs all of it, one shipment plan covers it, and one party answers for tolerances. As a China furniture and building materials manufacturer, we handle the production coordination; your team keeps control of site conditions.

Frequently asked questions

Can a floating modular system be installed over tiled walls?

Yes, provided the fixing line is confirmed before tiling and the fixings pass through the tile into adequate support. Confirm this with your tiler and our technical team together; surface-fixed adhesive alone is not an acceptable method for a loaded unit.

Do you supply the backing frame?

We confirm what the floating run requires and specify it. Whether we ship the backing frame or your builder fabricates it on site is agreed project by project, since freight space and site sequence both matter.

What if the wall is not straight?

Field verification after finishes is the answer. Where deviation exceeds tolerance, we adjust module dimensions or add a scribe detail rather than asking your trades to pack and shim on site.

Can the floating run match existing joinery on site?

Close matching is possible with approved physical samples of face material and edge detail. Exact matching to aged or third-party joinery should be discussed at design stage, not requested after production.

Next step

Send us the room layout, the wall build-up at the fixing line and your intended use for each bay, and we will return a configuration proposal with dimensions, finish options and the specific confirmations still outstanding for that scheme. Our interior design and project coordination service covers drawing coordination through to on-site guidance, and contact us to start that review.

Specifications for each unit, including dimensions, load capacity, materials, finishes and electrical details, are confirmed per project at approval stage. Site conditions, structural support and local installation requirements remain the responsibility of the project team and should be checked against local requirements.