A swim spa quotation is only as good as the brief behind it. For a configurable product such as our Outdoor Swim Spa WS-130Cⅲ, two buyers sending the same model number can receive very different prices, because the option list, the site conditions and the delivery terms all sit underneath that number. This guide sets out what a manufacturer needs from you to price the unit properly, and what you should expect to get back.

Start with the model code, then confirm the specification sheet

Model codes in this range are not decorative. The 130ⅲ family is built in several variants, and the letter suffix changes what is fitted. The catalogue entry for WS-130Cⅲ lists a swim training system among its features, while the closely related WS-130Cⅲ-U variant is recorded without that item and with different pump, jet and lighting counts. Both are shown at the same shell size, so on paper they look interchangeable and in practice they are not.

Before asking for a price, ask the supplier to send the specification sheet for the exact code you intend to buy, and check that the equipment list matches your programme. The catalogue page for WS-130Cⅲ shows features of water jets, LED lighting, ozone and a swim training system. Treat what appears on a product page as the starting point rather than a fixed contract specification: the supplier should confirm each item line by line for your configuration, because options change what is fitted and how the unit is wired.

Item to confirmWhy it moves the price
Exact model code, including the suffixDetermines whether swim jets, additional pumps and extra lighting are included
Equipment quantities on the sheetPumps, jets, control system and lights are priced into the base unit
Total connected power for your buildSets the supply requirement and therefore part of the electrical cost
Shell dimensions from the sheetDrives the foundation design, access route and freight plan

Send the site information before anyone pours a foundation

A quotation that ignores where the spa is going is incomplete. The manufacturer needs to know whether the unit will sit fully above ground, be partly recessed into a deck, or be installed in a sunken pit with perimeter access for maintenance. That single decision changes the insulation package, the steps, the platform detail and how much of the shell cladding you need.

  • Position and access: send site plans, photographs of the terrace or garden area, and the route the shell will travel from the delivery vehicle to its final position. A long carry over soft ground or over an existing deck is a real cost line.
  • Support structure: confirm what the slab or pedestal system will be, and who designs it. The supplier can advise on load and level requirements; the local structural engineer signs off the concrete work.
  • Drainage and services runs: show where the water supply, drainage and electrical sub-panel will come from, including the distance from the spa.
  • Climate exposure: state whether the site is coastal, shaded, or subject to freezing nights. This affects the insulation specification and how the unit is commissioned for year-round use.

State your electrical supply in writing

This is the item most often left out of an enquiry, and it causes the most rework. A swim spa of this size draws far more than a standard domestic socket circuit can carry, so the quotation should state the supply requirement for the configuration you have chosen — phase, voltage, dedicated circuit sizing and protection — so your electrician can price the right cable, sub-panel and isolation switch. If you are also adding a heat pump to keep the water at swimming temperature in a cooler climate, that load has to be declared at the enquiry stage, because it changes both the equipment list and the supply requirement.

Ask the supplier to put the electrical requirement for your exact configuration on the quotation itself, not only on the product page. It becomes part of the record you hand to your electrician and to whoever approves the building work.

List the options you want, not just the ones you have heard of

The optional accessories for this range typically include control system upgrades, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation packages and steps. Availability and compatibility vary by model, so each option should be confirmed against the specific code rather than assumed from a brochure. Send your preferred list and ask the supplier to mark what is compatible, what is not, and what they recommend for your climate.

Buyers specifying several units for a resort or development should also send the quantity and say whether the same configuration applies to every unit. Mixed configurations on one order are normal, but each line has to be listed separately so it can be checked against production scheduling and container loading.

Set out delivery, installation and after-sales expectations

Because we manufacture in China and ship internationally, the commercial terms belong in the same enquiry as the product details. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, export paperwork, packaging and container loading, with tracking through to the delivery address. Tell us the destination port or site address, whether you want delivery to the kerb or to the installation position, and which Incoterms you intend to trade on. Import duties and local permits remain the buyer's responsibility, and a competent supplier will flag them early rather than after the container is booked.

Installation and warranty terms should also be settled before order confirmation. Our installation and after-sales support covers on-site guidance, inspection and handover, spare parts and ongoing maintenance; the exact scope for your project is agreed in writing so that nobody discovers a gap on commissioning day.

A short checklist you can paste into your enquiry

  • Model code with suffix, plus a request for the matching specification sheet
  • Shell dimensions taken from that sheet, and the access route from delivery point to position
  • Installation type: above ground, recessed or sunken, with drawings if you have them
  • Available supply: phase, voltage, distance to the sub-panel, and any heat pump requirement
  • Option list wanted: sterilisation, extra pumps, heat pump, filtration, insulation, steps
  • Quantity, project location, preferred delivery address and Incoterms
  • Required site date, so production and transit can be planned backwards from it

Frequently asked questions

Can a quotation be issued on the model number alone?

An indicative figure can be given, but it will not be binding. Options, site conditions and delivery terms all affect the final price, so an accurate quotation needs the information listed above.

Why do two similar model codes carry different prices?

Because the fitted equipment differs. Within the 130ⅲ family the presence of a swim training system, and the counts of pumps, jets and lights, vary between variants even where the shell size shown is the same.

Can the spa be supplied as part of a wider project package?

Yes. Swim spas are often ordered alongside outdoor furniture, pergolas, wall panels and interior fixtures for the same villa or resort programme, which lets one supplier coordinate production, packing and shipment across the whole scope.

Send your brief to SANTERSON. Share the model code, site drawings, available power supply and option list, and we will return a specification sheet and an itemised quotation for the exact configuration you need.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  |  Email: santerson@qq.com  |  Contact page