A door that looks right on a sample board can still arrive wrong on site if the opening, the panel and the frame were never specified together. That is why our quotation request for Aluminum Frame with Solid Panel asks for a small set of project facts before we price anything. Below is exactly what to send, what we do with it, and what you get back.

What this product actually is

Aluminum Frame with Solid Panel is part of our Aluminum Frame Kitchen Cabinet collection and is built for residential kitchen projects. The panel face is solid rather than glazed, so it reads as a clean, closed surface inside an aluminium frame. Like every item in this collection, its finish, layout and dimensions are specified per project rather than ordered from a fixed size list — made-to-measure sizing, material and finish options, and a layout tailored to the space.

Because nothing is standard, we cannot quote responsibly from a photo alone. A quotation built on assumptions produces cabinets that need field adjustment, and on a kitchen fit-out that cost sits with you, not us.

The six details that make a quotation accurate

Send these six items and we can price your request without a long back-and-forth.

  1. Openings and heights. Overall width and height of each run or unit, plus the finished floor level and ceiling or soffit height. Note obstructions: beams, downpipes, windowsills, skirting.
  2. Layout intent. A sketch, a marked-up floor plan or a designer's elevation. Straight runs, corners, tall units, appliance housings — tell us which walls are involved and in what order the elements sit.
  3. Panel and frame finish. The colour or texture you want on the solid panel, and the frame profile and colour. If you have a reference sample number or a project finish schedule, include it.
  4. Internal configuration. Shelves, drawers, pull-out rails, appliance cut-outs, integrated lighting. This drives the hardware list and therefore a large part of the price.
  5. Quantity and site location. How many units or how many identical dwellings, and where the goods must land. A single villa and a multi-unit apartment package are quoted differently.
  6. Delivery and installation expectation. Whether you want door-to-door delivery only, or also on-site installation and handover support.
Where dimensions are still being settled, send the drawing revision you have and say so. We will quote against that revision and mark the affected lines as provisional instead of guessing at a number.

What happens after you send it

Your enquiry follows the same path as our other custom work: a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. In practice that means we review your drawings, confirm the specification with you, and only then issue pricing against a defined scope.

If your kitchen sits inside a wider fit-out, say so in the enquiry. We also supply Custom Built-in Kitchen Cabinets as interior fixtures for hotel, apartment and residential renovation projects, with matching cabinet hinges, drawer slide rails, support legs and connecting brackets. Coordinating the aluminium frame doors with the rest of the cabinetry in one specification usually removes interface problems that appear when different suppliers handle adjacent runs.

If you are still deciding how closed panel fronts should look against the rest of the kitchen, browse the other options in the same collection: Two Tone Aluminum Frame Cabinets and Minimalist Black Aluminum Frame Cabinets. Quoting two or three finish options side by side is normal, and it costs nothing extra at the enquiry stage.

Questions to settle before we start production

QuestionWhy it changes the quotation
Is the panel a single solid face or combined with glass elsewhere in the run?Mixed fronts need matching profiles and can change how units are packed and shipped.
Who measures on site — you or our team?Measured drawings from your side must state tolerance; otherwise we quote to the drawing as issued.
Which hardware brand and opening mechanism do you want?Soft-close fittings, handleless profiles and touch-to-open systems price differently.
What is the moisture exposure at the sink and dishwasher wall?It determines the panel and substrate choice for those specific units.
Are you buying this run alone or with other project items?Combined shipments reduce handling, but they need one agreed delivery sequence.

How to send the enquiry

Email your drawings, quantities and finish notes to our contact page, or reach us directly on WhatsApp at +86-13928214007 (PHILLIP). If a drawing set is large, send the relevant kitchen sheets first so we can start reviewing while the rest arrives.

One point worth being direct about: aluminium frame cabinetry with solid panels is made to your dimensions, so the specification you confirm in writing becomes what is manufactured. Read the quotation line items — panel material, finish, hardware set, unit count — and correct anything unclear before production starts. That single review step prevents most of the disputes we see across project supply generally.

Send your openings, layout and finish preference for Aluminum Frame with Solid Panel and we will return a quotation built on your drawings. Enquiries receive a response within 24 hours; business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).