Two Tone Aluminum Frame Cabinets

Two Tone Aluminum Frame Cabinets

Description

Santerson Two Tone Aluminum Frame Cabinets is part of the Aluminum Frame Kitchen Cabinet collection, designed for residential kitchen projects with project-specific dimensions and finish options.

Description

Overview

Santerson Two Tone Aluminum Frame Cabinets is part of the Aluminum Frame Kitchen Cabinet collection, designed for residential kitchen projects. Its finish, layout, and dimensions can be specified to suit each space and project.

Configuration

  • Made-to-measure sizing
  • Material and finish options
  • Layout tailored to the project

Confirm dimensions and selected specifications for each project.

Features

  • Made-to-measure sizing
  • Material and finish options
  • Project-specific layout