Glass-front aluminium frame cabinets look simple on a drawing: an aluminium profile, a sheet of glass, a hinge, a box on the wall. On site they are one of the few joinery items where every measurement error becomes visible, because glass shows what timber hides. A written installation plan agreed before production starts is what keeps glazing, ironmongery, services and site access from becoming an argument after the cabinets arrive.
The plan below is the one we ask project teams to complete for Glass Front Aluminum Frame Cabinets and the related Frosted Glass Aluminum Cabinets and Smoked Glass Aluminum Cabinets. Every unit we make is made-to-measure, with the layout, finish and dimensions set per project, so the plan is also the document that fixes what was actually ordered.
1. Site conditions measured at handover, not at tender
- Finished floor level and finished wall faces, recorded after tiling, plastering and waterproofing are complete. Wall straightness matters more than wall length: an aluminium frame does not flex to follow a bowed substrate the way a scribed timber carcass can.
- Exact positions of soil stacks, water outlets, isolating valves, switch plates, range-hood ducts and any beam or column that affects cabinet height or run length.
- Clear opening widths for every door the cabinets pass through, plus the lift car dimensions and service-lift weight limit in apartments. Framed glass units are awkward loads and rarely fit in a stairwell.
- Storage location on site — dry, covered, and off the ground — because frames and glass should not sit in the same room as wet trades.
2. The dimensional and glazing schedule
A single line per cabinet run is not enough for a glazed door. Record, for each unit:
| Item | What to specify |
|---|---|
| Frame and profile | Profile colour or finish, frame width, and whether the door is single or double glazed within the frame. |
| Glass | Type (clear, frosted, smoked), thickness as supplied, edge treatment, and which side the glazing faces. |
| Ironmongery | Hinge type and quantity, handle or pull specification, soft-close where required, and opening direction for each door. |
| Interior | Shelf positions and load intent, integrated lighting if any, and power or charging points inside the cabinet. |
| Interface | Adjacent appliance or worktop, required gaps, scribe or filler widths, and plinth or recess detail. |
Where a run mixes glazed and solid doors — for example a solid panel unit next to a glass-front display unit — show that on the elevation. Mixed runs are where alignment complaints start, because the two door types can sit at slightly different reveals.
3. Sequencing: who does what, and in which order
- First fix of wall brackets, backing timber or blocking is confirmed before the cabinets are manufactured, so the fixing substrate exists when the frames arrive.
- Worktops, splashback tiling and stone benchtops are measured against the installed carcasses, not against drawings, if they follow the cabinets. If they precede them, the tolerance each trade expects must be written down.
- Glass doors are fitted last in the sequence, after painting, flooring and heavy trades have finished, so a chipped pane is the last problem on the list rather than the first.
- Appliance deliveries are scheduled against the cabinet dates. A built-in oven or wine cooler that lands late holds up the glazed doors around it.
4. Handling, protection and replacement cover
Glass is the item most likely to be replaced rather than repaired, so the plan should say in advance who pays for a breakage and how fast a replacement panel can be made.
- Named receiving person on site, with the delivery date and container or pallet count confirmed before dispatch.
- Vertical, strapped, padded transport for framed doors; no flat stacking of glazed units.
- A named contact who signs off each unit on arrival and records damage the same day, with photographs.
- Spare glass and spare ironmongery identified in the order — usually one set per batch of frames is enough cover for a breakage during fitting, but the quantity should be agreed with us rather than assumed.
5. Snag list and handover
- Door alignment and reveal checked across the whole run, not one door at a time; hinge adjustment recorded.
- Every glass panel inspected for chips, scratches and transit labels left on the surface.
- All soft-close and latch mechanisms cycled open and closed, with shelves loaded to test deflection.
- Care and cleaning instructions issued to the client — glass-front doors need a different cleaning routine than a painted panel, and the wrong product leaves streaks along the aluminium edge.
- As-built dimensions and finish codes archived against the project, so a later replacement door matches what was made.
Before you place the order: send us the elevations, the finished-level drawings and the glazing selection together. Our team works from your drawings through production coordination and on-site guidance, and we can also supply matching black aluminium frame or two tone aluminium frame units in the same profile family when a project mixes finishes across floors.
A good installation plan does not make the job easier to argue about — it removes most of the things worth arguing about. If you have drawings for an upcoming kitchen or fit-out, send them through and we will mark up what is missing before production starts.