A swim spa in the 7.8-metre class is a big commitment for an Australian villa, resort or residential development project, and the model pair WS-S08T1 / WS-S08T2 sits right in that band. The listing looks simple enough: one shell, one set of numbers, two model codes. The quotation behind it rarely is. Before you place a deposit, here is what we ask buyers to confirm line by line when they source these two configurations from our factory.

Start with the model code, not the picture

WS-S08T1 and WS-S08T2 share one product page, one shell size and almost identical marketing photography. They are not interchangeable, and the difference between them is usually what changes the price. Ask which configuration your quotation actually covers, and get that code repeated in writing on the proforma invoice, the packing list and the shipping marks. A common sourcing problem in cross-border projects is not a bad product but a mismatch between the unit quoted and the unit loaded in the container.

For reference, the catalogue entry for this pair lists overall dimensions of 7800 × 2200 × 1500 mm. Treat that as the shell envelope, not as the space you need on site: access width, turning radius at the property boundary, crane or HIAB reach and the working clearance for the plant area all sit outside those three numbers.

Read the equipment list, then read it again

The specification block published for this model pair is a parts count, not an installed configuration:

Item shown in the catalogueCatalogue entry
ModelsWS-S08T1 / WS-S08T2
Catalogue dimensions7800 × 2200 × 1500 mm
Control system1 set
Swim training system1 set
Water pumps2 pcs
Filter pump1 pc
Jet total50 pcs
LED lights / small LED lights4 pcs / 28 pcs
Total power9.55 kW
Features shownWater jets, LED lighting, ozone, swim training system

Two things in that table deserve a direct question. First, treat the total power figure as an equipment figure for the listed configuration only — confirm the number that applies to your chosen build, and remember it does not tell you what your electrician has to supply. Ask for the connected load per pump and heater circuit, the supply voltage and phase required, the recommended breaker size and whether a dedicated circuit and RCD protection are specified. Second, a jet total in the fifties is meaningless across suppliers unless you know which jets are hydrotherapy seats, which are directional and which are driven by which pump. Ask for a jet layout drawing rather than a number.

Options in this range are quoted separately, not included: control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. If your project needs year-round water temperature in a cooler southern climate, the heat pump and insulation package belongs in the quotation from day one, not added after the shell is manufactured.

What an Australian buyer should verify before paying the deposit

Ask these nine questions and keep the answers in writing

  • Which model code is being manufactured? WS-S08T1 or WS-S08T2, stated on the invoice, drawing and carton marks.
  • What electrical supply does the finished unit need? Voltage, phase, total connected load, circuit protection and where the isolator should sit.
  • Is the swim training system included or optional? Confirm the type of current or resistance unit and its flow rate for lap swimming.
  • Which pumps and which filtration route? Filter pump sizing, sand filtration versus cartridge, and the plant-room footprint required.
  • How is the shell insulated and how is it heated? Insulation specification and heat pump capacity for your climate zone.
  • Who handles electrical compliance on site? Local wiring, earthing and any state-level registration must be done by a licensed local electrician. Confirm what our documentation package gives them — wiring diagram, component list and IP ratings.
  • What is included in the delivery price? Sea freight to which port, whether door-to-door delivery to your suburb or site is quoted, and who clears customs and pays duty and GST.
  • How is the unit unloaded and set? Crane or HIAB hire, site access for heavy plant, and who sets the shell on the prepared base.
  • What happens after handover? Spare-parts supply for pumps, jets, control boards and LED fittings, plus the scope of support if something fails in the first season.

Why we handle this differently from a furniture order

A swim spa arrives as a heavy, pre-plumbed, electrically populated shell. It has to coordinate with the civil works, the pool surround, the outdoor furniture layout and the plant area, which is exactly where a single supplier handling the whole scope helps. As a China furniture and building materials manufacturer, we produce swim spas alongside the pergolas, loungers, dining sets and paving-adjacent finishes that surround them, so the water feature and the terrace around it are specified once instead of negotiated between five vendors.

Our Custom & OEM Service covers shell size, finish and equipment configuration where the standard catalogue does not fit the site. Our Logistics & Door-to-Door Delivery service covers freight forwarding, export paperwork and container loading plans — and we will tell you plainly which parts of Australian import handling, duty and site installation sit with your local agent and licensed trades.

If this shell does not suit the site

The same catalogue holds several nearby configurations worth comparing before you commit. Outdoor Swim Spa WS-S08B shares the 7800 × 2200 × 1500 mm envelope but is built around a heavier jet and pump package with a waterfall feature. Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool suits sites where a square, round, oval or curved footprint fits better than a long lap shell.

Send us the site plan, your preferred model code and the equipment list you actually want, and we will quote WS-S08T1 / WS-S08T2 against that configuration — including what is included, what is optional and what your local trades are responsible for.