Why the confirmation stage matters on a configured swim spa
A swim spa of this size is not a single item that comes off a shelf line. The Outdoor Swim Spa WS-S08B belongs to a configurable outdoor swim and hydrotherapy range, which means the shell you receive is the sum of the options selected at order stage: pumps, jets, control sets, sanitation, heating, insulation and access steps. Two projects can both quote "WS-S08B" and end up with materially different equipment schedules and site requirements.
Before production starts, three things should be on paper rather than in an email thread: the exact equipment list for your configuration, the electrical and structural load that equipment creates, and the sequence in which the spa arrives on site and is connected. Everything below follows those three points.
1. Confirm what the catalogue lists, and what it does not
The published catalogue entry for this model gives the following data. Use it as your starting point for a written specification sheet, not as a substitute for one.
| Model | WS-S08B |
| Catalogue dimensions | 7800 × 2200 × 1500 mm |
| Control system | 2 sets |
| Water pump / filter pump | 4 pcs / 2 pc |
| Jet total | 98 pcs |
| LED lighting | 7 lights plus 46 small LED lights |
| Total power | 14.6 kW |
| Features shown | Water jets, LED lighting, Ozone, Waterfall |
| Swim training system | Not listed for this model in the captured specifications — confirm before assuming it is included |
The last row is the one buyers most often get wrong. A swim current is not implied by a jet count, and it is not listed for this model in the specifications we hold. If your brief calls for lap swimming or resistance training, ask for it to be written into the configuration as a named item with its own position in the shell.
2. Confirm the optional equipment before the order is placed
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists on one size may not bolt onto another. Each option changes three things at once: the equipment schedule, the power draw, and the plant space needed beside the shell.
- Sanitation. Ozone appears in the standard feature list; UV sterilisation is an option. Decide which one you want, or both, and record who is responsible for consumable replacement after handover.
- Heating. A heat pump changes the electrical design and the noise profile next to a boundary fence or neighbour's window. Confirm the unit, its location and whether it is included in the quoted power figure.
- Filtration. Sand filtration versus cartridge affects backwash water disposal and routine maintenance access. Choose based on who will actually service the spa on site.
- Insulation. Relevant for cooler climates and for any spa that runs year-round; it interacts with the heating load you have just specified.
- Steps and access. Step type and side affect the deck layout. Fix this before the surrounding paving or timber deck is set out.
3. Confirm the site can carry the spa and its power
A 7800 × 2200 × 1500 mm shell full of water, plus users, is a structural question first and a plumbing question second. Send your engineer or landscape contractor the confirmed equipment schedule, not the marketing summary. The published total power figure of 14.6 kW is the catalogue value for the listed configuration; adding a heat pump or additional pumps moves it.
- Ask for the required supply arrangement, circuit protection and dedicated earthing for the confirmed configuration, in writing.
- Confirm slab thickness, reinforcement and drainage around the perimeter with your local engineer. Local building requirements differ by council and state, and they are your responsibility to satisfy — verify them locally rather than assuming a supplier drawing covers them.
- Confirm pump and plant access. Filter pumps, controls and any sand filter need reachable service space; a spa installed flush into a deck with no access panel becomes a maintenance problem on day one.
4. Confirm how the unit is manufactured, shipped and handed over
Because this is a configured product, the production release should follow an approved drawing and equipment schedule signed by your side. SANTERSON works as a furniture and building materials manufacturer supplying project packages, and the swim spa range is usually coordinated alongside other outdoor and interior items on the same job rather than ordered in isolation. Grouping it with your other purchases means one production schedule, one shipping plan and one snag list.
- Request a dimensioned drawing showing step position, plant access, equipment location and any cover or enclosure interface.
- Agree the packing and container loading plan, and confirm who handles lifting and placement on site — the shell must reach its final position without damaging glazing, jet fittings or the deck below.
- Agree the inspection points before shipping: fill test, jet and lighting function, control set operation, waterfall and ozone function.
- Ask for the spare-parts list and the warranty terms that apply to pumps, controls, shell and lighting, since these are usually covered differently.
5. Confirm what you receive at handover
A handover pack for a configured spa should include the as-built equipment schedule, wiring and plumbing diagrams for the delivered configuration, the control system operating instructions, the maintenance routine for filtration and sanitation, and a contact route for spares. If your project also includes outdoor furniture around the spa — loungers, a pergola or a shaded dining set — check that material finishes are specified for the same splash and sun exposure as the spa deck.
Figures above are transcribed from the published catalogue entry for WS-S08B and apply to the configuration shown there. Treat them as reference values until your own configuration sheet is issued; options change power draw, equipment count and dimensions.
Send us the brief before you lock the specification
If you are specifying a swim spa for a villa, resort or private residence project, share the site drawing and your intended use — hydrotherapy, exercise swimming, or family use — and we will confirm which configuration of this range fits, what the equipment schedule looks like, and how it can be shipped alongside the rest of your package. Contact details are on our contact page.