Before a quotation can be prepared for a luxury outdoor swim spa with massage jets, LED and water features, our engineering team needs a defined set of site measurements and project inputs. This guide lists exactly what to measure on site and what decisions to settle in the brief, so villa owners, architects and hotel procurement teams can move from enquiry to production drawings without repeated rounds of clarification.

Why the input list matters before pricing starts

A swim spa is a built assembly, not a single purchase item. The acrylic shell, reinforced cabinet, pumps, jets, lighting circuits and water features all have to arrive at a site that can carry their weight, supply their power and let them be lifted into place. When the measurements are missing, the same enquiry comes back three or four times: overall size first, then access routes, then the electrical supply. Sending the information below with your first enquiry lets us confirm the shell size, pump set and jet layout in one pass.

1. Site measurements to take first

Record dimensions in millimetres, and photograph the space from each side. These are the figures we work from:

  • Clear length, width and depth of the intended position — measured wall to wall or fence to fence, not the size of an existing deck board pattern.
  • Finished floor level and construction type — timber deck, concrete slab, pavers on pedestals or a recessed pit. Note whether the surface is already levelled or still to be built.
  • Working clearance around the cabinet — leave room for filter access, control panel access and future servicing, not just the outer footprint of the shell.
  • Overhead conditions — pergola beams, eaves, tree canopy or an aluminium louvered pergola that will sit above the unit.
  • Access route from the delivery vehicle to the final position — gate width, side setbacks, steps, slopes, overhead wires and whether a crane or a manual carry is realistic.
  • Drainage and overflow route — where a drain or gully sits relative to the spa, and how far the run is.
  • Distance from the nearest habitable room or neighbour's boundary — this informs pump location and jet zoning choices.

To give a sense of scale, our catalogue carries units at very different footprints. The WS-S04 is listed at 4090 × 2200 × 1110 mm, the WS-SP600 at 5900 × 2500 × 1600 mm, and the long-format WS-S12 at 11740 × 2200 × 1470 mm. A terrace that comfortably takes one of these will not take the next, which is why we ask for clear opening dimensions before recommending a model.

2. How the spa will be used

Usage sets the internal layout more than aesthetics does. Tell us:

  • Primary purpose — daily lap swimming, hydrotherapy and massage, children's play, or a mix. A swim current needs length; a massage zone needs seat and jet positions.
  • Typical bather load — how many people use it at once, and whether the space serves one household or hotel guests who will use it daily.
  • Hours of use — year-round or seasonal, and whether night swimming is expected.
  • Accessibility needs — steps, handrail positions or a lower entry ledge for older users.

Where the brief calls for a dedicated swim channel next to a separate relaxation area, an extended layout such as the long outdoor swim spa with hydrotherapy and relaxation pool is usually the starting point. Where the space is compact and round, the round outdoor hot tub spa with hydrotherapy jets and underwater LED lights fits a terrace corner more easily.

3. Jets, lighting and water features: specify them by zone

Rather than asking for "more jets", describe the experience you want in each part of the shell. The catalogue configurations show how differently this is resolved from model to model:

Catalogue modelCatalogue dimensions (mm)Jets shownLED lighting shownTotal power shown
WS-S044090 × 2200 × 111026 jet total, plus 4 water columns3 lights and 18 small LED lights8.25 kW
WS-SP6005900 × 2500 × 16006 jet total4 lights9.35 kW
WS-S1211740 × 2200 × 147073 jet total1 light and 50 small LED lights7.65 kW

These figures are the specifications published for each catalogue model, and a bespoke configuration will read differently. Use them to frame the conversation: how many body-zone jet groups you want at the seating ledges, whether you want a waterfall feature at one end, how much underwater lighting for evening use, and whether ozone or UV sterilisation is required for shared hospitality use.

Confirm the included equipment and electrical requirements for the selected configuration before ordering. Where a specification sheet marks an item as not listed for a model — for example a swim training system on certain shells — treat it as unconfirmed rather than absent, and ask us to state it in writing on the quotation.

4. Services and electrical inputs

These items are usually decided by your engineer or electrician, and we need them before finalising the pump set:

  • Available supply — single-phase or three-phase, voltage, and the distance from the meter or distribution board to the spa.
  • Dedicated circuit and protection — breaker rating and RCD/ELCB provision at the spa location.
  • Heating method — heat pump, existing boiler or electric heating only; note any solar or existing hot-water plant that can be tapped.
  • Insulation expectations — cabinet insulation and cover, which matter most in cooler highland and southern sites.
  • Filtration preference — standard cartridge filtration or sand filtration for higher bather loads.
  • Water feed and drainage — fill point, drain point and whether a backflow preventer is required by your local installer.

5. Finishes, surroundings and coordination with other products

A swim spa reads as part of the outdoor build, not as an object dropped onto it. Share the finish palette early: cabinet cladding tone, decking board size, wall finishes behind the spa, and the lighting scheme for the surrounding terrace. Our wall panel systems, outdoor furniture collections and exterior cladding are often specified in the same package so that the cabinet face, screening and seating all match.

If the spa sits beside an outdoor kitchen or a covered lounge, send the layout drawing with the spa footprint marked on it. We then coordinate the cabinet finish against the adjacent joinery and confirm that access panels are not blocked by fixed furniture.

6. Shape and customisation inputs

Where a standard rectangular shell does not suit the plan, a bespoke form can be developed. Our customizable shape outdoor spa supports square, round, oval and curved designs on an acrylic shell with structural reinforcement, for gardens, terraces and leisure areas. For a custom shell we ask for:

  • a scaled plan drawing (DWG or PDF) with the permitted envelope marked;
  • the maximum footprint and height your structure allows;
  • seat, step and jet positions you need held fixed;
  • reference images for the water feature you want — sheet waterfall, laminar jet, spillover edge or none.

A short checklist to send with your enquiry

  • Clear length, width and height envelope in millimetres, plus site photographs.
  • Floor construction, load path and whether the surface is levelled.
  • Delivery access route: gate widths, setbacks, steps, crane feasibility.
  • Intended use: swim current, hydrotherapy seating count, bather load, season of use.
  • Jet zoning, waterfall or water feature preference, underwater lighting level.
  • Electrical supply details and heating method.
  • Filtration, ozone or UV requirement for shared use.
  • Cabinet finish, decking and wall finishes to coordinate with.
  • Project location, delivery address and target installation window.

Send the checklist as a single message and we can return a specification sheet with dimensions, equipment list and power draw matched to your site. For villa and hospitality packages, this is also where the swim spa gets coordinated with the rest of the outdoor range — loungers, dining sets, pergolas and screening — under one production and delivery plan.

Send your measurements and brief

Share the site dimensions, access route and usage requirements with our project team, and we will confirm which catalogue model or custom shell fits, together with the equipment list and power figures for that configuration.

Contact SANTERSON — phone / WhatsApp +86-13928214007 (PHILLIP) — our services cover design coordination, custom and OEM production, door-to-door delivery and installation support.