A single outdoor swim spa on a drawing looks simple. Once the shell, plant room, power feed, water treatment and the surrounding deck all have to agree with each other, the same unit becomes a small package of quantities. This guide walks through how buyers and project teams size those quantities for the Outdoor Swim Spa WS-130CⅢ and coordinate it with the rest of an outdoor fit-out, so the order that reaches production matches what the site can actually receive, install and commission.
Start With the Catalog Baseline of WS-130CⅢ
Before any quantity is fixed, record what the catalogue already states for this model. The published figures below are the reference points every downstream decision is measured against; treat them as a starting configuration rather than a finished specification.
| Catalogue item (WS-130CⅢ) | Value shown on the product page |
|---|---|
| Catalogue dimensions | 11830 × 3000 × 1430 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 20 pcs |
| LED lights | 7 pcs |
| Total power | 10.85 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two points in that table drive most of the planning work. The first is length: at 11830 mm the WS-130CⅢ is a long shell, and its footprint governs access routes, crane or forklift reach, structural support and the size of the surrounding deck. The second is power: 10.85 kW total is a substantial connected load that has to be confirmed against the site supply before any electrical quantity is ordered.
Reading the Model Suffix: WS-130CⅢ and WS-130CⅢ-U Are Not the Same Order
The 130C family includes a variant with the same footprint but different plant, and that difference changes quantities. The Outdoor Swim Spa WS-130CⅢ-U shares the 11830 × 3000 × 1430 mm shell yet lists 4 water pumps instead of 1, a jet total of 23 rather than 20, 5 LED lights, and 11.85 kW of total power; and it does not list a swim training system for that variant.
Practically, that means two projects with identical deck dimensions can need different electrical capacity, different pump rooms and different spare-parts lists. Decide which suffix the project requires before you count anything, because swapping the variant after quantities are locked is one of the most expensive changes to make late.
How to Count Quantities in Three Layers
Buyers who plan swim spa projects successfully separate the order into three layers and count each one separately. Mixing them into a single line item is where shortages appear on site.
Layer 1 — The Unit Itself
- Number of spa shells, stated per model suffix (CⅢ or CⅢ-U), not as a generic "swim spa".
- The plant items already bundled with the unit: control system, pumps, jets and lights as listed in the catalogue table above.
- Any option you intend to add at order stage — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are all catalogued options for this range. Confirm availability and compatibility for the chosen model before adding them to the count.
Layer 2 — Site Interfaces You Must Supply Locally or Specify Early
- A structural base or plinth sized to the full 11830 mm length, with the load path checked for a water-filled shell.
- An electrical supply and protection rated for the confirmed connected load of the selected configuration; the catalogue power figure is a planning input, not a substitute for an engineer's calculation.
- Drainage, water fill and, where required, make-up water connections.
- Access for delivery and for removal of service components after handover.
Layer 3 — Surrounding Products That Have to Match the Spa
A swim spa is rarely ordered alone. Poolside loungers, dining sets, cabana daybeds and pergolas usually share the same deck, and their quantities should be counted against the circulation space the 11830 mm shell leaves behind. Browse the Outdoor Furniture range alongside the spa so seating layouts, shading structures and wet-area flooring are dimensioned in one pass rather than in three separate orders.
Coordinating the Spa With the Rest of the Package
Because SANTERSON supplies furniture and building materials for villas, resorts and hospitality projects under one roof, the swim spa can be coordinated with the finishes that surround it instead of being treated as an isolated purchase. Wall cladding, decking-adjacent panelling, outdoor lighting and poolside joinery all sit in the same catalogue, which means one specification cycle covers them.
For projects where several product families converge on one wet area, Turnkey Interior Project Solutions cover design and planning, production, logistics, installation and after-sales as a single workflow. That structure matters for swim spa work specifically: the electrical and structural decisions described above have to be settled during design, not discovered when the shell arrives.
Where a project needs non-standard dimensions or finishes around the spa — a recessed surround, an integrated step arrangement, or matching cabinetry for plant storage — Custom & OEM Service covers custom design and prototyping alongside bespoke material finishes. Confirm the achievable options and minimum order quantities for your specific project before committing drawings.
Freight Quantities: The Part Most Buyers Under-Count
A shell of this length is a shipping problem as much as a product one. Container type, the number of containers, packaging and loading method all follow from the confirmed dimensions and from how many units are in the order. Logistics & Door-to-Door Delivery covers freight by sea, air and rail together with customs paperwork and container loading, so build the delivery sequence into your quantity plan: what arrives first, what can be stored, and what must land only once the base is cured.
Import terms, duties and transit arrangements differ by destination and should be confirmed case by case for each project rather than assumed from a previous order.
A Pre-Order Checklist
- Model suffix chosen and written on the order (WS-130CⅢ or WS-130CⅢ-U), with plant counts copied from the catalogue.
- Every optional item listed separately, each confirmed as available for that model.
- Site base, drainage and electrical capacity signed off against the selected configuration's load.
- Surrounding outdoor furniture, shading and finishes dimensioned against the remaining deck space.
- Delivery sequence, container plan and storage plan agreed before production starts.
- Installation scope and after-sales support confirmed for the project location.
Bringing It Together
Quantities for the WS-130CⅢ come out right when the catalogue baseline, the variant choice and the site interfaces are counted as one package rather than three separate purchases. Fix the model suffix early, keep optional plant on its own line, and dimension everything around the shell at the same time.
Send SANTERSON your confirmed configuration, deck drawings and required delivery sequence, and the specification can be reviewed against what is actually available for this model before production begins — through the Contact page.
Planning a swim spa within a villa or resort package?
Share your model selection, dimensions and site conditions with the SANTERSON project team to get configuration options, freight planning and coordinated outdoor product quantities in one response.