A swing loveseat paired with a matching chaise lounge looks simple on a mood board and complicated on a purchase order. Two pieces have to arrive together, wear the same fabric, sit at compatible heights and survive the same outdoor exposure. That is why an enquiry saying simply "please quote this set" usually comes back with more questions than a price. The suppliers who answer fastest are the ones whose buyers send a complete brief. Below is the information we ask for on every outdoor swing loveseat and chaise lounge set enquiry, and why each item changes the number you are quoted.

1. Where the set will actually sit

Tell us the installation setting in plain words: villa terrace, pool deck, seaside resort, hotel garden, rooftop lounge or a shaded courtyard. The setting drives three decisions that are impossible to reverse after production.

  • Frame finish. Powder-coated aluminium suits coastal and poolside settings where salt and chlorine are constant. We state the coating as a manufacturer specification, not as a tested rating, so send us your environment details and we will confirm the finish for that site.
  • Upholstery. A bouclé-look outdoor fabric reads soft in a photo but behaves differently under direct sun than under a pergola or hardtop. Tell us the daily sun hours and whether cushions can be stored overnight.
  • Ground condition. Freestanding swing stands need a level, load-bearing surface. Paving, timber decking, compacted gravel and raised decks each need different foot detailing and clearances.

2. Dimensions and clearances, not just the product drawing

A swing needs room to move. Send us the usable area plus these measurements rather than a catalogue image:

MeasurementWhy it matters for the quote
Overall width and depth of the swing, including the stand feetDetermines whether the set fits between planters, balustrades or columns.
Swing clearance front and backThe arc needs free space; a tight terrace may call for a shorter seat or a fixed chaise instead.
Chaise lounge length and the walkway beside itPoolside layouts need service circulation, not just seating.
Door, lift and stair openings at the delivery pointOversized pieces on upper terraces change both packaging and the handling method we quote.

3. Quantity, phasing and whether other outdoor pieces share the order

Unit count is the single biggest driver of unit price. Give us the confirmed quantity per room type or zone, plus any phased schedule for a multi-building project. Also tell us if the same brief covers aluminium outdoor swing bench and chaise lounge sets with teak armrests, dining sets, loungers or cabana daybeds. Grouping outdoor items in one production run simplifies material matching and container loading; splitting them across separate orders usually costs more per piece.

4. Customisation scope: what you want changed from the standard build

Coordinated outdoor sets are made to order, so state exactly which of these you want varied from our standard specification:

  • Frame colour and coating, with a reference such as a RAL code or a sample you already use on other fittings.
  • Cushion fabric, colour and pattern, plus whether covers are removable for laundering.
  • Seat depth, back height and chaise length where your design requires it.
  • Decorative pillows, piping, contrast welting or branded labelling.
  • Add-ons such as side tables, hardtops or canopies — see the polycarbonate hardtop outdoor swing bench collection for a roofed alternative to fabric canopies.

Send drawings, mood boards or a specification sheet if you have them. A photograph of the reference piece with dimensions marked is enough to start when formal drawings do not exist yet.

5. Matching and consistency requirements across the project

Coordinated sets fail in the field when fabric lots or frame batches drift. Tell us:

  • Whether all pieces must be produced in a single run, and whether spares or future replacement units are expected.
  • Existing finishes on site that the set has to match — aluminium joinery, pergolas, balustrades, timber tones.
  • Sample expectations: fabric swatches, a colour card, or a pre-production sample before the main run.
Practical tip: name one decision-maker for finishes on your side. Approvals split between a designer and an operator are the most common cause of delayed production start.

6. Delivery, access and installation details

We arrange door-to-door delivery for project orders, but we need destination specifics to quote freight honestly:

DetailWhat we need from you
Delivery address and site typeFull street address, whether it is a private villa, live hotel or construction site with restricted hours.
Incoterms and customs responsibilityState who handles import clearance, duties and local transport so the quotation scope is unambiguous.
Target on-site dateGive a realistic milestone; production and sea freight cannot be compressed after the fact.
Installation expectationSay whether your team assembles on site or you want guidance, an assembly document or on-site support.

Our service scope covers design coordination, custom and OEM production, logistics and after-sales support — see our services for how the stages connect.

7. Budget range and compliance paperwork, if any

A budget band is optional but useful: it tells us which fabric, cushion density and frame options to propose first instead of quoting one fixed build. If your project requires particular documentation — a material declaration, a test report from an accredited laboratory, or a specific import certificate — say so in the first message. Testing arranged after production has started is slower and more expensive than specifying it upfront.

A ready-to-send enquiry template

Copy this into your email and fill the blanks. It is usually enough for us to return a firm quotation with freight included.

  • Project name, location and setting (terrace / poolside / seaside / hotel garden)
  • Item: swing loveseat + matching chaise lounge, reference link or photo
  • Quantity per zone, plus phased delivery dates if applicable
  • Frame colour (RAL or sample), fabric choice, cushion and add-on choices
  • Site dimensions: swing footprint, swing clearance, chaise length, access openings
  • Delivery address, preferred Incoterms, who clears customs
  • Required documents or testing, if any
  • Your decision-maker for finish approvals and their contact

Common questions

Why is the swing quoted separately from the chaise lounge if they are one set?

The swing includes a stand and suspension hardware; the chaise does not. Separate line pricing lets you adjust quantities per zone without repricing the whole package, and it makes freight calculation clearer when the two ship in different cartons.

Can we order one set to evaluate before committing to a project quantity?

Yes. Tell us the evaluation quantity and the intended project volume in the same enquiry, so we can quote both stages and keep the specification consistent between the sample and the main run.

Do you supply only these two pieces, or a whole outdoor package?

Both. We are a China-based manufacturer of furniture and building materials, so a single project can also draw on dining sets, loungers, daybeds, pergolas and gazebos from the furniture series, alongside interior fixtures for the same building.

Send your project brief, quantities and site dimensions to SANTERSON and we will confirm the specification, production schedule and delivered price. Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com — or use our contact page.