Aluminum Outdoor Swing Bench & Chaise Lounge Set with Teak Armrest

Aluminum Outdoor Swing Bench & Chaise Lounge Set with Teak Armrest

Description

Premium outdoor leisure set with freestanding swing loveseat and coordinated chaise lounges. Consistent aluminum + teak design, ideal for luxury villa poolside and resort quiet lounge zones.

Description

This leisure group features a freestanding double swing bench and matching chaise lounges, continuing the minimalist aluminum frame and teak accent style of the collection. The swing adopts a solid A-shaped aluminum stand and heavy-duty suspension hardware for stable swinging. The chaise lounges offer ample space for sunbathing and relaxing, with optional side table for drinks. All cushions are made of outdoor performance fabric, resisting fading and moisture. Perfect for luxury villa courtyards, resort pool decks and boutique hotel relaxation corners. We can customize cushion fabrics, decorative pillows and frame colour for project orders.

Features

  • - Heavy-duty powder-coated aluminum A-frame for swing bench, stable & anti-rust
  • - Natural teak arm caps, comfortable touch
  • - High-performance outdoor cushion fabric, UV-resistant & water-repellent
  • - Swing bench with reinforced hanging hardware for safe swinging
  • - Chaise lounge with integrated side table option
  • - Unified design matching our aluminum dining & sofa series
  • - Custom cushion colours, throw pillows and frame finish supported