A swim spa that arrives on a pallet is not the same thing as a swim spa that works. The difference is the paperwork, measurements and site decisions made before the shell ever leaves the factory floor. Below is what we ask project owners, contractors and procurement teams to settle before an Outdoor Swim Spa WS-S04 ships, so that delivery day is a placement job rather than a negotiation with the site.
Start With the Shell Size, Not the Dream Layout
The catalog footprint for this model is 4090 × 2200 × 1110 mm. Those numbers drive everything else on the plan: the width of the access route, whether a standard goods lift or side gate will pass it, how much clearance the installers need to set the shell down, and where the plant equipment can be reached later for servicing.
Measure the route, not just the pad. Door widths, turning radii in a courtyard, overhead cables, steps, and the ground conditions between the delivery point and the final position all decide whether the spa can be moved into place with hand trucks, or whether a crane or forklift has to be booked. Record those measurements on site and send them to us with your drawings; we would rather change a gate now than hear about it on delivery day.
Reference data from the WS-S04 catalog page
- Catalog dimensions: 4090 × 2200 × 1110 mm
- Total power: 8.25 kW
- Water pump: 3 pcs; filter pump: 1 pc
- Jet total: 26 pcs, including 4 water columns
- LED lights: 3 pcs plus 18 small LED lights
- Control system: 1 set
- Features shown on the listing: water jets, LED lighting, ozone, waterfall
Treat this as catalog data for a standard configuration. The equipment actually fitted, and the electrical duty that goes with it, is confirmed against the specification you order — not assumed from the brochure.
The Foundation and Drainage Section
Every filled spa is heavy, and a swim spa is used wet all year round, so the supporting surface belongs in the plan before anything electrical. Your structural engineer or local contractor should design and build the base; we supply the product, not the ground it sits on.
- Load path. A fully filled shell plus bathers is a live load the slab, deck or podium has to carry. Confirm the design load with the engineer who signs off the structure, and confirm that a filled spa is acceptable where you intend to place it — roof terraces and upper-level decks in particular need a structural opinion before the order is placed.
- Level and rigidity. The base must be level and rigid across the whole footprint, not just at the corners. A shell set on a surface that moves or settles takes that movement into the plumbing connections and the finishing detail around the rim.
- Drainage around the spa. Splash-out, filter servicing and rain all need somewhere to go. Plan falls away from the shell, a drain or collection point close by, and no standing water against the cabinet side.
- Access to plant. Leave working space where the pumps, filtration and control system can be reached without draining or lifting the spa. Mark this on the drawings so paving and joinery do not seal it off later.
The Electrical Section — the One Most Often Left Too Late
With a catalog total power figure of 8.25 kW, this is not an appliance you plug into an outdoor socket. The electrical section of your plan should be prepared by a licensed electrician on site and should cover:
- Supply capacity and circuit design. Confirm the available supply, cable size and run length from the distribution board to the spa location, and the protection device required. Long cable runs change voltage drop and therefore the cable specification.
- Earthing, bonding and protective devices as required by your local wiring rules for a wet installation. We do not design or certify local electrical installations; that is the role of the local electrician and the local authority.
- Position of the isolator and control access, reachable by the user but outside the wet zone, agreed before tiles and cladding go on.
- Provision for options. If you are adding a heat pump or UV sterilization to the configuration, the electrical plan should carry that load from the start rather than being revised after delivery.
Ask us for the wiring and equipment schedule for your exact configuration before your electrician finalises the circuit. Configuration options change the electrical duty.
Configuration: What Is Actually Being Delivered
The WS-S04 sits in a configurable outdoor swim and hydrotherapy range, so the installation plan has to describe the machine you ordered. Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model.
Each option has a site consequence. Insulation changes how the cabinet is enclosed. Sand filtration needs its own position and access. A heat pump needs clearance for airflow and a path for condensate. Steps need their own footprint and fixing. Put every selected option on the same drawing as the shell, with clearances marked, and the plan reads as one system instead of four separate purchases.
If your project needs a different footprint — a longer lap pool, a shallower shell, or a shape that fits an awkward terrace — the wider Swimming Pools and Swim Spas range covers several lengths and depths, and where the standard outline will not work, a Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool can be developed around the site constraint.
Delivery, Access and Lifting
Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air or rail, export paperwork and container loading, with the shipping documents prepared for import. What your plan still has to arrange locally is the last hundred metres:
- A delivery window and a vehicle that can reach the site — an articulated truck on a suburban street is a planning problem, not a surprise.
- Unloading arrangements: crane, forklift or manual carry, decided from the access measurements taken at the start.
- Someone qualified to receive the shipment, check it against the packing list and photograph any transit damage before signing.
- Storage if the site is not ready. A spa left in a yard waiting for a slab is a damaged spa waiting to happen.
Commissioning and Handover
The last section of the plan is the one that protects the owner after installation. It should name who fills the shell for the first time, who runs the pumps and filtration through a full cycle, who checks the jets, waterfall, LED lighting and ozone function, and who signs off the result.
- Water fill and first run. Fill to the level stated in the operating instructions before starting the pumps, then check every jet line and the waterfall for leaks once the system is under pressure.
- Control system walkthrough. The owner's team should be shown normal operation, temperature setting where fitted, filtration scheduling and fault indication, with the operating instructions left on site.
- Snag list. Record cosmetic or functional items at handover with photographs, so any warranty claim is documented rather than argued about later.
- Maintenance routine. Filter cleaning, water chemistry and winter or low-use procedures agreed in writing before the team leaves.
Our Furniture Installation and After-sales Support service covers on-site installation, inspection and snags, warranty coverage and spare parts. Availability of local installers, response times and warranty terms vary by country and should be confirmed for your project location before the contract is signed — we will tell you plainly what can be supported from our side and what has to come from a local contractor.
A simple test before you sign the plan off
Can every trade on site answer these four questions from the drawings alone: where exactly does the 4090 × 2200 × 1110 mm shell sit; what carries its weight when full; which circuit feeds it and who signed that circuit; and how does the plant get serviced in five years without lifting the spa? If any answer is missing, the plan is not finished.
Coordination Is Easier Before Production Than After It
A swim spa rarely arrives on its own. On villa and hospitality projects it lands alongside poolside loungers, cabanas, outdoor dining sets, pergolas and the paving that ties them together. Ordering those through one Turnkey Interior Project Solutions provider keeps dimensions, finishes and delivery dates on a single schedule instead of six — useful when the spa's base has to be poured to suit an exact footprint and the surrounding furniture has to match the same handover date. That route covers design coordination, production, logistics and on-site guidance for villa, hospitality and office work.
Send us the location, the access measurements and your preferred configuration. We will confirm the equipment schedule and electrical duty for that specification, flag what has to be handled by local trades, and give you a delivery plan built around your site rather than the other way round. Send your enquiry through our Contact Us page.