A floating modular system looks simple on a drawing: a run of wall-hung carcasses, some open shelving, a closed cabinet or two. It is one of the easiest items in a joinery package to under-specify, and one of the most expensive to correct once the panels are cut. If you are putting a floating modular system into a villa or apartment package, the questions below are the ones worth settling before production starts.

1. Fix the wall construction and the fixing method first

A wall-hung run carries its load into the wall, so the wall build-up decides what hardware is possible. Confirm with the site team whether the substrate behind the run is stud partition, masonry, or a framed clad wall, and who is responsible for strengthening it. On lightweight partitions this normally means noggins or a continuous batten frame set out to match the module grid, not a general "make it strong enough" note.

Ask for the fixing detail in writing: bracket type, screw type, spacing, and the maximum cantilever you have allowed on any shelf. If the run crosses two different wall types, that junction needs its own detail before the modules are sized.

2. Set the module grid against real site dimensions

Our floating modular systems are made to measure, with layout, dimensions and finish specified per project. That flexibility only pays off if the survey is taken at the right moment. Take dimensions after the floor and wall finishes are set out, and record out-of-level and out-of-plumb, not just length and height. A 15 mm variation across a four-metre run changes which module widths you can use.

Agree the grid before materials are ordered: number of modules, width of each, the vertical spacing between shelves, and where the scribes go. Scribes should sit at the ends or in a deliberate reveal, never squeezed into the middle of an open shelf bay.

3. Decide what each module actually stores

Floating systems usually mix open display with closed storage. Pick the mix room by room rather than applying one elevation to every wall. If you want both in a single run, mixed open and closed systems let you alternate display bays with carcasses in the same horizontal line, which keeps the shadow line continuous.

  • State the shelf duty: books and ceramics behave differently, and a 900 mm clear span that is fine for ornaments will sag under paperbacks.
  • List the appliances or equipment the run has to absorb — television, soundbar, record player, coffee machine — with their dimensions and weights.
  • Name the door type on closed modules: hinged, sliding, or lift-up. Each needs different clearance in front and different hardware inside the carcass.
  • Say whether handles are allowed or the fronts must be pull-free, since handleless fronts change the drawer and door construction.

4. Settle lighting and electrical before the carcasses are built

Integrated lighting is where most late changes arrive. If the run carries LED strips or a lit display niche, decide the fitting positions, the cable routes, the driver locations and the switch or control method while the carcass depths are still open. A modular system with lighting needs a serviceable driver position — a driver buried behind a sealed back panel is a maintenance problem on day one.

Confirm the supply voltage and plug standard for the destination country, and confirm who supplies and installs the mains wiring up to the connection point. Send us the electrical layout drawing; we cut and drill to it.

5. Lock down materials, finishes and edge treatment

Specify the substrate, the surface material and the colour reference for every visible part, including the parts nobody plans to look at: carcass interiors, shelf undersides, and the back of any island or freestanding element. A common source of complaint is a carcass in one finish with an interior that does not match.

  • Name the finish system for fronts — veneer, lacquer, melamine, acrylic — and give the colour or grain reference, not just a style word such as "oak" or "grey".
  • State the edge treatment on visible shelf edges: matching ABS, solid timber lipping, or a metal profile.
  • Confirm that floating shelves, closed carcasses and any adjacent floating modular shelving are ordered from the same batch of material so grain and colour match across the wall.
  • For a run that continues into a wardrobe or tall unit, note that now, so the two trades use one set of dimensions.

6. Plan the packaging, sequence and installation responsibility

A floating run arrives as loose modules, and its quality is decided on site as much as in the factory. Agree who marks out, who fixes to the wall, and who levels the final line — us or your installer. We provide installation support, but this needs naming in the contract before shipping.

  • Confirm the delivery address, access route and lift dimensions for long modules; a 2.4 m shelf blank will not turn a tight apartment stair.
  • Agree packing grade and pallet layout for export, and photograph each carton on arrival before the site crew opens them.
  • Send the installation sequence with the drawings: which module goes first, where the datum line sits, and what tolerance is acceptable at the wall junctions.

Quick sign-off list

Item to confirmWho confirms it
Wall substrate and strengthening detailSite contractor / structural
Final survey dimensions, levels and datum lineSite team, before production release
Module widths, shelf spans, open/closed mixDesigner + client
Shelf duty and equipment weightsClient / operator
Lighting positions, drivers, voltage, controlsElectrical contractor + designer
Front and carcass finishes, edge treatment, batchDesigner + manufacturer
Packaging, access route, installation responsibilityProject manager + manufacturer
Snag list and handover recordSite team at completion

Send us the wall build-up, the survey dimensions and the electrical layout, and we can price a floating modular run against those conditions rather than against a typical elevation. As a furniture and building materials manufacturer working on villa and apartment packages, we build to your drawings and ship with the fixing details that go with them.

If you have a joinery package with wall-hung runs in it, send the elevation drawings and the room dimensions and we will come back with a specification review — including anything in the drawings that would be difficult to fix, level or light on site.