A swim spa is rarely a single line item on a purchase order. Around the shell sit pumps, treatment systems, power, water, access and the deck furniture that makes the space usable. This guide walks through how buyers and project teams build a complete bill of quantities for the Outdoor Swim Spa WS-SP600, and how to coordinate the surrounding products so nothing arrives out of sequence.
Start With the Standard Scope, Then Add What the Site Requires
The WS-SP600 is a configurable model in our outdoor swim and hydrotherapy range. The published catalogue specification for this model lists overall dimensions of 5900 × 2500 × 1600 mm, one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 9.35 kW. Water pumps are not listed in the captured specification sheet for this particular model, so they must be confirmed as part of the configuration rather than assumed.
Two points matter when you turn that page into a quantity list. First, the catalogue lists equipment for a standard build; options such as heat pumps, UV sterilisation, sand filtration, additional water pumps, insulation and steps are quoted separately and their compatibility varies by model. Second, the power figure covers the spa package itself — it does not cover the supply cable, distribution board, isolator or any site electrical work. Write both facts into your bill of quantities early, because they drive trades and lead times.
| Item | Catalogue reference for WS-SP600 | How to treat it in the quantity list |
|---|---|---|
| Shell dimensions | 5900 × 2500 × 1600 mm | Use as the starting footprint for deck, clearance and access checks; confirm final build-up dimensions with production before setting out the slab or plinth. |
| Control system | 1 set | Confirm control placement and access for servicing when the spa is recessed into a deck. |
| Swim training system | 1 set | Included in this model; verify nozzle position against the swimming lane direction on your layout drawing. |
| Filter pump | 1 pc | Confirm plant-room or cabinet location, ventilation and drainage. |
| Water jets | 6 pcs | Jet count changes between variants — see the comparison below. |
| LED lights | 4 pcs | Note low-voltage transformer locations on the electrical drawing. |
| Total power | 9.35 kW | Hand to the electrical contractor as a load figure only; supply and protection remain site scope. |
| Water pump | Not listed for this model in the captured specification | Confirm with us before ordering — do not carry it forward as an assumed inclusion. |
Compare the Two Variants Before You Fix Quantities
The same 5900 × 2500 × 1600 mm shell is offered as WS-SP600 and WS-SP600-MS. Both list a control system, swim training system, filter pump and four LED lights. They differ where it affects your order: the WS-SP600 lists six jets and 9.35 kW with no water pump recorded in the specification, while the WS-SP600-MS lists one water pump, twenty-nine jets and 11.55 kW.
That difference changes three lines on your documents: the electrical load the contractor must provide, whether a water pump appears separately on the packing list, and how many jet nozzles sit in the hydrotherapy zone. Choose the variant at the design stage, not at purchase-order stage. If you are ordering more than one unit across villas or guest rooms, keep one model per building type so spares, control panels and maintenance instructions stay consistent.
Build the Bill of Quantities in Four Blocks
Block 1 — The spa package
- Spa unit, model and quantity per location, with the option list written out line by line rather than as "as quoted".
- Options you intend to take: heat pump, UV sterilisation, sand filtration, insulation, steps, extra control system. Confirm each one is offered for the selected model.
- Spare-parts allowance: consumable filters and any jet or light items your maintenance team cannot source locally.
Block 2 — Site services that sit outside our supply
- Electrical: dedicated supply, protection and earthing sized for the confirmed load, plus a spare circuit for controls and lighting.
- Water and drainage: fill point, drain-down route, and where discharge water goes during maintenance.
- Structure: slab or plinth sized to the final build-up dimensions, with access panels where equipment is enclosed.
- Access: confirm the delivery route, crane or forklift needs, and whether the unit can reach the position before the deck closes in.
Block 3 — Poolside furniture that must match the schedule
Deck furniture is usually ordered late and delivered too late. Because we manufacture both, poolside seating can be specified alongside the spa and shipped in the same plan. For a high-use deck, the Aluminum Sling Sun Lounger Collection covers static sled-base, wheeled and folding frames with adjustable backrests, which lets one project mix layouts without changing the sling colour or frame finish. Quantify loungers by deck metres rather than by eye, and reserve clear space in front of the swim lane so jets and users are not blocked.
Block 4 — Shade and shelter around the water
A spa used year-round needs somewhere dry to sit next to it. The Double Roof Hardtop Aluminum Gazebo with Privacy Curtains is a common pairing: the air gap between the two roof tiers vents hot air, and the curtains let an open terrace become an enclosed space. Set out its position before you fix lounger quantities, because the shadow line and column bases determine how many loungers fit and where plant access is kept.
Coordination Rules That Prevent Rework
- Issue one drawing set that carries spa footprint, gazebo columns, lounger layout and plant access on the same sheet. Separate drawings are where clashes appear.
- Freeze the model variant before the electrical contractor fixes cable sizes; the load figure moves between variants.
- Confirm every option in writing against the selected model number, not the range name.
- Group outdoor products into one shipping plan so the spa, loungers and gazebo land together — see logistics and door-to-door delivery.
- Keep a snag list for handover: jet operation, controls, lighting, water balance and furniture assembly are checked in the same visit.
Where Custom Work Belongs in the Sequence
If the deck shape is irregular or the spa has to sit inside an enclosure, shape and finish adjustments are easier to settle before production than on site. We handle custom design and OEM work across furniture and building materials, from custom and OEM service through to project coordination under turnkey solutions. For villa and resort packages, the same team can coordinate the spa area with cabinetry, wall finishes and lighting, so quantities for the wet areas and the living areas come from one specification rather than several.