A rattan-fronted kitchen with an island that runs into the dining table is a beautiful drawing and a difficult quotation. The gap between the two is almost always missing information: dimensions taken from a plan rather than the built space, appliances not yet chosen, and finishes described in words instead of samples. Below is the input list we use on our own wabi-sabi rattan kitchen project, so that a first enquiry can move straight to workable drawings instead of another round of questions.

Why this particular cabinet type needs more input than a standard run

Our Wabi Sabi Rattan Kitchen Cabinets with Island pair a solid wood frame with breathable woven rattan panels, and the island continues into a dining surface so that cooking, eating and conversation share one run of worktop. Recessed warm LED lighting sits inside the open shelves, and the tall units carry reserved positions for built-in ovens. Because the piece is made to order — cabinet dimensions, internal storage partitions, wood colour and surface treatment are all set per project — there is no catalogue size for us to fall back on.

That is the practical difference from a modular kitchen. A modular unit forces the room to accept its widths; a bespoke run has to absorb whatever the room gives it, including out-of-square walls, an uneven floor, and services that were fixed before the design was drawn. The measurements below are what let us decide where the scribes, the filler panels and the expansion gaps go.

The measurements we need from site

Send dimensions taken on site, not scaled off an architect's plan, and mark each one as a finished or structural dimension. For every wall run we want three widths and two heights — left, centre and right for the width; floor-to-underside-of-ceiling and floor-to-underside-of-any-beam for the height. If those three readings differ, we design to the smallest and scribe the rest.

What to measureWhy it changes the build
Total run length per wall, plus the return at each cornerSets module widths and where the corner units and filler panels sit
Floor to ceiling in three places along the runTall units and full-height panelling are built to the lowest reading
Depth of the wall, including skirting, tiles or existing finishesDetermines whether carcasses sit proud of the finished face
Position of soil stack, water inlets, outlets and the electrical boardFixes the sink run and how far the island can move without re-running services
Window sill height and reveal depthDecides where base units stop and whether open shelving can pass the sill
Above-floor level across the room, checked at the two ends of the run and at the island positionThe island top has to be level even where the floor is not
Clear width of the circulation aisles around the island on all four sidesAn island that extends into a dining table needs walkways, not just a footprint
Doorway and corridor widths, plus lift or stair dimensions on siteTells us whether the island ships as one unit or in sections joined on site

Island inputs that decide the layout

The island is where this design earns its keep, and where an incomplete brief costs the most rework. Along with its length, width and height, tell us:

  • Whether the dining extension is fixed to the same worktop or a separate top at a different level.
  • How many people are to be seated, and on which sides — seating on two faces changes where drawers and doors can open.
  • Which appliances sit in the island: dishwasher, wine cooler, induction hob with downdraft extraction, or none of these.
  • Whether storage under the seating overhang is needed, or whether knee space has to run clear the full depth.
  • The worktop material and edge detail you want, and its thickness — this governs the substructure and where the LED profiles are housed.
Where an open-plan layout is involved, the island also becomes the visual link between kitchen and living area. If that is the intention, send the flooring, wall finish and any open plan kitchen cabinetry already specified for the adjoining space so the wood tone reads as one scheme rather than two.

Appliance and services schedule: send it before drawings start

Because the tall units reserve positions for built-in ovens, the appliance schedule is not an afterthought — it sets carcass heights, ventilation gaps, and the load path above each housing. For every built-in we need make and model, or at minimum the cut-out dimensions with the door hinge side marked. Add hob type and extraction route (wall, ceiling or downdraft), tapware and sink bowl sizes, and any small appliances that will live permanently on the worktop.

If you have not chosen the appliances yet, say so plainly and give us the range you are considering. We will design the housings to the larger of the two candidates and leave the choice open, rather than build to a guess.

Storage plan: what goes behind the rattan

Woven panels look soft; the storage behind them has to be efficient. Internal partitions are customised per project, so the useful input is an inventory rather than a preference. Tell us which of these the household or guest service actually needs:

  • Drawers for pots and pans, with the heaviest items low — and note any item taller than a standard drawer.
  • Charging and small-appliance bay, hidden behind a panel, with the devices listed so shelf heights fit.
  • Tableware display behind open shelves lit by the recessed warm LEDs — this is where the piece shows, so send the pieces you intend to display if their size matters.
  • Dry store, recycling and laundry separation, and whether any of it has to be concealed from the dining side.

Finishes, rattan panels and lighting: agree them on samples

Wabi-sabi work depends on texture, and texture cannot be approved from a colour name. For this cabinet the two decisions are wood colour and surface treatment; both are customised per project. Send a reference photograph, an existing board you like, or the physical sample you hold, and specify the sheen level you want rather than a trade name — then approve our sample before production.

On rattan panels, confirm the weave openness and whether the panel is framed on all four edges or runs to a shadow gap, because both change how the panel is mounted and how it is replaced later. On lighting, give us the colour temperature you want for the recessed warm LEDs inside open shelves, plus the location of the driver and its access point; drivers are serviceable items and should never be sealed behind a fixed panel.

We also supply integrated cabinet lighting as part of the joinery package, which keeps profiles, wiring and switches on the same drawing set as the carcasses instead of leaving them to a separate trade.

Project context: quantities, rooms served, and delivery route

This cabinet has been specified for villa renovation, boutique hotels and high-end apartments. The same design repeated across several units is a different job from a single installation, so include in your enquiry:

  • The number of identical kitchens, or the range of layouts if each unit differs.
  • Whether this is one of a group of interior fixtures supplied together — our custom built-in kitchen cabinets for hotel and apartment projects are usually quoted alongside wardrobes, vanities and media walls, and one drawing set across all of them removes clashes at site.
  • The delivery address, the port or terminal you normally clear through, and any site access limits — lift dimensions, stair widths, working hours, storage space for a container load.

SANTERSON works as a furniture and building materials manufacturer and one-stop supplier, so design consultation, prototyping, production, packing and container loading sit with the same team that built the drawings. That is what makes it realistic to hold one approved set of samples — wood colour, surface treatment, rattan panel and worktop edge — against every unit delivered.

A short checklist before you send the enquiry

  • Site dimensions on every run, three widths and two heights each, marked finished or structural.
  • Above-floor level at both ends of the run and at the island position.
  • Services positions: water, waste, electrical board, extraction route.
  • Appliance schedule with cut-out dimensions and hinge sides, or an explicit "not yet selected".
  • Island brief: seating count and faces, worktop material and thickness, appliances in the island.
  • Storage inventory, not adjectives.
  • Finish references and the sheen level; sample approval expected before production.
  • Quantities, delivery address, access limits, and whether other joinery is being supplied on the same project.

Send that much and the first drawings come back with the rattan panel details, appliance housings and island substructure already resolved. Send less, and the first round of drawings only tells us what is still missing — and every missing dimension costs another revision before anything can be cut.

Start from your drawings

Send the measurements, appliance schedule and finish references above, and we will return layout proposals for a wabi-sabi rattan kitchen with island — cabinet dimensions, internal partitions, wood colour and surface treatment set to your project.

Contact PHILLIP at SANTERSON — Phone/WhatsApp +86-13928214007, email santerson@qq.com.