A modular living wall that already carries its own lighting looks simple on a rendering and complicated on site. This guide sets out what to put in the procurement brief so the Santerson Modular System with Lighting (Living System) arrives ready to install, with the electrical work agreed before production starts rather than discovered on the day.

Most disputes over integrated lighting are not about joinery quality. They are about who was supposed to provide what: the cable, the driver, the switch, the conduit, the trim-out detail, the spare. A brief that answers those questions in advance removes the argument later. Below is the structure we ask project teams to follow when they specify this system with us.

1. What the product actually covers

The Modular System with Lighting sits inside our Modular Living Systems collection. Like the rest of that range, it is made to measure: layout, finish and dimensions are set per project, not chosen from fixed sizes. The lighting is integrated into the carcass and shelves, so the electrical provision becomes part of the furniture specification instead of a separate trade item.

Two things follow from this, and both belong in your brief. First, because dimensions are made to measure, the lighting layout cannot be finalised before the room dimensions are frozen. Second, because the light fittings are built into the units, the electrical specification has to be confirmed for the chosen configuration — fitting type, position, control method and driver location — before we release drawings for production.

2. The scope split: write it as a table

The single most useful page in the brief is a two-column responsibility table. Fill every row, even when the answer is "not applicable". If a row is blank at contract stage, someone will assume it is the other party's job.

ItemTypical supplier scopeTypical site / M&E scope
Units, shelves, doors, finishesFabrication to approved drawingsStorage, protection before installation
Light fittings in shelves and nichesSupply and fitting into the unit, per approved scheduleFinal commissioning with site power
Cabling inside the unitInternal wiring between modules—
Drivers, transformers, dimmersConfirm in writing which are supplied and where they are locatedAccess panel, ventilation, replacement route
Wall to unit feed, conduit, back boxPosition and level stated on our drawingsFirst fix, containment, terminations
Switches, controls, smart integrationInterface requirement confirmed before productionDevices, programming, final wiring
Testing and handoverPre-shipment functional checkOn-site energising, snag list, sign-off

Keep the driver question explicit. A hidden driver behind a closed panel looks clean in a photograph and is a maintenance problem when it fails on the eighth floor. State where each driver sits, how it is reached, and whether the access panel matches the surrounding finish.

3. Information to hand before we can price it properly

A priced proposal for a lit modular system needs more than a wall elevation. Send what you have; gaps are normal at this stage, but each gap delays the drawing set.

  • Room dimensions and the run length of the wall, with floor-to-ceiling height and any skirting, cornice or service runs to work around.
  • The layout intent — open display, closed storage, or a mix. Our Santerson Mixed Open & Closed Systems page is a useful reference for how the two are combined.
  • Which elements need light: shelf edges, niche interiors, vertical reveals, toe-kick glow, or cabinet interiors only when a door opens.
  • Colour temperature and brightness intent for the space, plus any requirement to dim.
  • The control method — wall switch, sensor, remote, or building management system.
  • Finishes: veneer, lacquer, melamine, glass, metal frame. Lighting colour and finish interact; a warm fitting against a cool veneer reads badly once installed.
  • Quantity of identical runs across units or floors, which decides whether one detail is repeated or each wall is drawn separately.

4. Where the lighting specification must be confirmed, not assumed

We do not lock an electrical specification from a mood board. The fitting type, output, control gear and compatibility have to be confirmed against the configuration you have chosen, because the same elevation can be built at different depths and with different shelf materials, and that changes what fits inside the profile.

Practical rule: treat every electrical figure as provisional until the final configuration is approved. The same applies when lighting appears in cabinetry elsewhere in the project — our Santerson Integrated Cabinet Lighting range follows the same confirmation step for each cabinet design.

If your project has a lighting consultant, name them in the brief early. Their schedule and our drawing set have to agree on fitting positions, driver locations and cable routes before either is issued for construction.

5. Coordinating with the rest of the fit-out

A lit living system rarely stands alone. It meets flooring, wall panelling, doors and sometimes a media wall, and each junction needs a decision about which trade closes the gap.

  • Flooring: state whether the unit sits on the finished floor or is scribed over it, and whether the floor level tolerance has been checked against the run length.
  • Walls: out-of-plumb walls are common in refurbished apartments. Ask for a site survey or set-out drawing before the units are measured for production.
  • Adjacent joinery: kitchens and wardrobes on the same wall should be drawn on one coordinate system so reveals line up.
  • Media and AV: if screens, speakers or cabling pass through the run, mark them before the carcass is cut.

Because we manufacture furniture and building materials together, these adjacent items can sit under one order. Kitchen cabinetry, wardrobes, wall panelling, interior doors and decorative screens from the same project can be drawn, produced and shipped as a package, which is where most of the coordination saving actually comes from.

6. Sample, prototype and sign-off sequence

For projects repeating the detail across several apartments or villas, we suggest one physical sample before full production. The sequence we normally run:

  1. Brief and space planning — layout, dimensions, finish direction.
  2. Drawings with the lighting schedule attached — fitting positions, control, driver locations.
  3. Sample or prototype of one lit section, reviewed under site-like conditions rather than showroom lighting.
  4. Quotation and detail confirmation, including what is and is not supplied.
  5. Production with quality control against the approved drawing set.
  6. Packing, freight and delivery, then installation and snagging on site.

Reviewing a lit sample under conditions close to the real room is worth the delay it costs. Shelf depth, glazing tint and colour temperature all read differently once installed against the actual wall finish.

7. Delivery, installation and after-sales

Our services cover freight forwarding with customs paperwork and door-to-door delivery, then on-site installation, inspection and snagging, warranty coverage and spare parts. Lit modules add one after-sales consideration: keep the fitting and control-gear model reference in your O&M file, together with the driver location drawing, so a replacement years later does not require opening the unit to find out what is inside it.

If spares matter for your handover — hotels and managed residential schemes usually ask for this — state the quantity you want held at order stage rather than after a failure.

8. A short checklist to paste into your brief

  • Wall run dimensions, floor level, and survey status.
  • Layout: open, closed, or mixed; number of repeats.
  • Lighting schedule: fitting type, position, colour temperature, dimming, control method.
  • Driver and control-gear locations with access route.
  • Responsibility table signed by both parties.
  • Finish schedule matched to the lighting specification.
  • Sample approval before production release.
  • Delivery terms, installation scope, snag process, spares list.

Send us the brief

If you have drawings or a room dimension for a lit modular wall, send them and we will return a layout proposal with the lighting provision marked and an itemised quotation showing exactly what is supplied. As a furniture and building materials manufacturer working on villa, hospitality and office projects, we can also quote the joinery, panelling and doors around it on the same drawing set — see our Turnkey Solutions and Custom & OEM Service.

Talk to SANTERSON about your modular wall

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiries: https://www.santerson.com/contact/