A modular living system with integrated lighting looks simple on a mood board and is anything but simple in production. The joinery, the light sources, the wiring routes and the fixing details all have to agree before the first panel is cut, otherwise the job lands on site as two separate trades arguing about who owns the cable. If you are sourcing this type of built-in piece from a China-based factory, the quality of your brief decides most of the outcome. Here is what a complete specification pack for our Santerson Modular System with Lighting (Living System) should contain, and what we will come back to you with.

Why a lit modular wall needs a longer brief than a cabinet

Our Modular Living Systems collection is made-to-measure. Every configuration in the range — open modular units, closed modular units, floating systems and floor-to-ceiling systems — is built to the dimensions, layout and finish you specify rather than chosen from a fixed size list. When lighting enters that equation, three extra decisions have to be closed before we quote properly:

  • Where the light sits inside the build-up. A strip recessed into a shelf underside, a profile set into a vertical reveal and a fitting behind a glazed front each need different carcass detail and different access for servicing.
  • Where the cable goes and where it terminates. Which bay the driver lives in, whether the feed comes from the wall or the floor, and how the sections join once the system is assembled on site.
  • What has to be switchable and dimmable, and by whom. A wall switch, a remote, a sensor or a building control system each changes the specification of the control gear we supply with the unit.

None of this is difficult. It is simply decided far more cheaply on paper than after production. Our product listing for this system states that finish, layout and dimensions are specified per space, and it asks buyers to confirm lighting and electrical specification for the chosen configuration — that confirmation line is the whole reason this article exists.

The six documents we need from you

You do not have to produce all of these yourself. If your team has drawings but no lighting layout, our Interior Design Services cover space planning, furniture layouts and 3D renderings, plus coordination of drawings and production, so we can develop the pack with you instead of waiting for it.

DocumentWhat it must showWhy production stalls without it
Room survey / as-built dimensionsWall lengths to finished face, floor-to-ceiling height, skirting and cornice details, positions of sockets, switches, radiators and doors through their swing arcFloor-to-ceiling and floating configurations are sized off the wall. A 20 mm error in the finished face repeats across every module.
Layout drawing with elevationBay-by-bay split of open shelves, closed cabinets, display niches and TV or media zones; which bays carry lightingDetermines carcass thickness, back panel type and where a light channel can be routed without cutting a structural shelf.
Finish scheduleBoard and veneer or laminate choice, edge treatment, handleless or handle detail, glass and glazing type for any lit display bayGlazed fronts change heat build-up and glare behaviour inside a lit bay; they have to be resolved with the light source, not after.
Lighting layoutFitting type per location, colour temperature, output level, IP rating where relevant, driver position, switching and dimming methodControl gear has to fit the carcass cavity and be reachable. Late changes mean re-machining.
Electrical setting-out drawingFeed origin, cable route, back-box position, circuit details, control interface if the system ties into building managementSite electricians and joinery must work to the same drawing or the feed arrives in the wrong bay.
Access, delivery and installation planLift and stair dimensions, maximum package size for the route to the room, who installs, on which date, in what sequence with other tradesA floor-to-ceiling system built as one piece will not fit a service lift. We split sections around your access route.

What to state about the lighting itself

Vague wording such as "LED strip, warm white" is where most disputes start. Write it out line by line:

  • Colour temperature and consistency. State the target in kelvin for every lit zone, and say whether all zones must match exactly across a single room or across several units in one apartment package.
  • Output and dimming behaviour. Fixed output, or dimmed — and to what level. If the same room also has integrated cabinet lighting in wardrobes or vanity units, say that the sources should be specified together so they dim alike.
  • Diffusion and glare. Whether the source is visible or concealed, and what profile cover you expect in a bay used for reading versus a bay used for display.
  • Servicing. Which components must be replaceable without demounting the unit, and where an access panel is acceptable.
  • Standards and voltage for the destination market. State the country of installation and the voltage and plug or wiring standard your electrician works to. We build to the specification you give us; certification requirements are your local authority's call, so put them in writing at brief stage rather than assuming they are covered.
A practical note on comparability. Our modular shelving range also offers integrated lighting systems, and media units are listed with integrated LED options. If a living room scheme mixes a lit living system with lit shelving or a media wall, send the brief for all of them together. One factory then matches finish, light temperature and driver type across the pieces; three factories guarantee that they will not.

How we respond to a complete brief

SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers in hospitality, villas and offices, with work referenced in Melbourne, Sydney, Perth, Willoughby and North Turramurra. A lit modular living system normally arrives as part of a wider package rather than alone, which is exactly where a single supplier saves coordination effort — cabinetry, wall and ceiling finishes, flooring, lighting and loose furniture under one production schedule.

For a project enquiry the sequence we work to is straightforward:

  1. Brief and design proposal. We read your drawings, flag conflicts — a feed in the wrong bay, a lift that will not take a section, a glazed front over an exposed source — and come back with a proposal and quotation.
  2. Detail confirmation. Shop drawings for sign-off: dimensions, bay split, finish samples, lighting schedule and driver positions. Nothing is cut before you approve the drawing.
  3. Production and quality control. Machining, assembly, finishing, pre-assembly check of the lit sections before packing.
  4. Logistics. Freight by sea, air or rail with the paperwork handled — commercial invoice, packing list, certificate of origin — through to door-to-door delivery. Tell us the destination and Incoterms you want quoted.
  5. Installation and after-sales. On-site installation guidance, inspection against a snag list, spare parts and maintenance support afterwards.

Freight terms, transit times, duties, warranty scope and response commitments are confirmed project by project in writing. We do not publish them as fixed guarantees, and you should not accept them from any supplier as a blanket promise before they appear in your contract.

Pre-brief checklist

  • Surveyed dimensions to the finished face, including floor-to-ceiling height and skirting detail
  • Elevation drawing showing the bay split and which bays are lit
  • Finish schedule: board, veneer or laminate, edges, handles, glazing
  • Lighting schedule: fitting type, kelvin, output, dimming method, driver location per bay
  • Electrical setting-out drawing with feed origin and back-box positions
  • Country of installation, supply voltage and the certification your authority requires
  • Access route to the room, with maximum package size we must design around
  • Other pieces in the same scheme that should match finish and light temperature
  • Site programme: installation date and the trades sequenced around it

Send us the drawings early

The most expensive version of a lit modular living system is the one specified after fit-out has started. Send the survey, the elevation and the electrical setting-out while the design is still open, and we will return a proposal that accounts for joinery, lighting and delivery as one package through our Turnkey Interior Project Solutions.

Talk to us about your living system. Send drawings, the room dimensions and your lighting intent, and we will come back with a configuration proposal, finish options and a quotation for production, delivery and installation support.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Contact page

Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).