A request for quote that only says "60 sets, wicker dining" invites vague pricing and late changes. Below is the information a manufacturer actually needs to price a woven outdoor dining programme properly — using our Synthetic Wicker Outdoor Dining Sets, Round Teak-Look Table & Square Sintered Stone Table family as the worked example.
Why the RFQ Format Changes the Price You Get Back
Woven outdoor dining sits at an awkward point in a project schedule. It is specified early enough to influence terrace and poolside layouts, but purchased late enough that quantities shift with the final landscape drawings. When an enquiry arrives with little more than a photograph and a quantity, we have to fill the gaps ourselves: the frame section, the weave density, whether the tabletop is slatted or stone, and the destination port are all assumed. Each assumption becomes either an inflated contingency in the first number you receive, or a variation order after the contract is signed.
A complete request for quote removes those assumptions. It lets us quote against a defined specification, confirm which of the two tabletop options applies to each zone, and return a landed-cost picture instead of an isolated unit price. For hospitality and villa work this matters because the dining set rarely stands alone — it has to coordinate with lounge and conversation sets, sun loungers, planters and paving on the same drawing.
Start With the Configuration, Not Just a Photo
This collection shares one lattice-woven dining chair — an aluminium frame wrapped in all-weather rattan with thick seat cushions — across two table formats. Tell us which format applies to each area, and say so zone by zone rather than for the whole order.
| Option | What to state in the RFQ | Typical application on site |
|---|---|---|
| Round table with teak-look slat top | Diameter, number of chairs per table, whether the slat direction must match other timber-tone elements | Villa terraces, resort al fresco dining areas, garden courtyards where a warm casual look is wanted |
| Square table with sintered stone top | Top dimensions and thickness, edge finish, number of tables per zone | High-use commercial resort terraces and café patios where quick daily cleaning is a requirement |
If your project mixes both — stone tops in the poolside restaurant, teak-look slats on guest villa terraces — list them as two line items with separate quantities. A single blended quantity is the most common cause of a re-quote.
The Specification Details That Must Appear in Writing
1. Frame and weave
- Frame material and section — for this family the chairs are built on aluminium frames; confirm whether your design requires a different tube size or a welded reinforcement for commercial traffic.
- Weave profile and colour — specify the rattan shade by reference sample, not by a word such as "brown". Wicker tones read very differently under warm landscape lighting versus daylight.
- Finish on metal parts — powder-coat colour and whether the coating spec needs to account for salt exposure at a coastal site.
2. Cushions and upholstery
- Fabric type and colour, and whether covers must be removable for laundering.
- Cushion thickness and whether seat pads or full wrap-around cushions are expected.
- Spare cushion sets. Commercial operators frequently order replacement cushion sets with the initial purchase so worn covers can be swapped without replacing frames years later.
3. Tabletop
- Sintered stone: colour, size, thickness and edge detail; confirm handling requirements for the delivery route to your site.
- Teak-look slat: slat layout, table diameter, and whether an umbrella hole or lazy-susan insert is required.
4. Quantities by zone, with a phasing plan
Give us the count per area (poolside restaurant, terrace, villa typologies), plus how many sets go in the first shipment and how many follow. Phasing affects production scheduling, container consolidation and how we hold your wicker and fabric batches consistent — colour lots can drift between long production runs, so a stated forward quantity lets us plan the weave and fabric intake together.
Customisation Requests Belong in the RFQ, Not the PO
This product family is offered with custom wicker shades, cushion colours and table dimensions for hospitality projects. If your designer has a specific colour scheme, send it at enquiry stage. The same applies to anything adjacent on the terrace: if you also need teak-look slat dining and lounger sets or a rope weave dining and bar set for the pool bar, ask for those in the same enquiry so frame tones, weave tones and cushion fabrics are matched across the whole outdoor programme rather than reconciled after two separate orders arrive.
Commercial and Logistics Items to State Up Front
| Item | Why we need it at RFQ stage |
|---|---|
| Destination port or door-to-door address | Determines packing method, container loading plan and whether inland delivery to a resort or regional villa site is feasible. |
| Preferred Incoterms | Decides what our number covers. Quote the same basis for every line item so totals are comparable. |
| Required on-site date, working back from your programme | Outdoor furniture is usually installed late; a stated handover date drives production sequencing and shipping mode. |
| Sample or prototype requirement | Whether you want one chair, one tabletop or a full sample set evaluated first, and who carries the sample cost. |
| Inspection and acceptance criteria | What your clerk of works will check on arrival — weave consistency, frame welds, cushion colour match. |
| Spare parts and future re-order volumes | Lets us confirm that frames, weave and fabric remain available for later phases of the same project. |
We handle freight by sea, air and rail with customs paperwork and door-to-door delivery. Tell us your destination and required date at RFQ stage and we will build the shipping option into the quotation rather than adding it later as an afterthought. Import terms, duties and delivery scope are confirmed case by case for each destination.
A Copy-and-Paste RFQ Structure
- Project: name, location, venue type (resort, villa, café), your role in the procurement.
- Zones and line items: zone name — table format (round teak-look slat / square sintered stone) — chairs per table — quantity of sets.
- Specification: wicker colour reference, frame finish, cushion fabric and colour, tabletop size/thickness/edge, umbrella hole yes or no.
- Customisation: dimension changes, finishes schedule references, private labelling if required.
- Phasing: first-shipment quantity, follow-on quantities, target on-site date per phase.
- Commercial: destination, Incoterms, payment terms, sample policy, inspection criteria.
- Attachments: terrace layout, finishes schedule, reference photographs, and details of any order you want the new sets to match.
What You Should Get Back From a Supplier
Use the reply as your evaluation test. A usable quotation itemises each zone line separately, states frame, weave, cushion and tabletop specification in writing rather than "as photo", gives packing detail with cube and container loading, shows the shipping option against your stated date, and flags anything that needs a sample before production. If two suppliers return numbers that cannot be compared line by line, the RFQ was not specific enough — send the addendum before choosing.
Send us the specification
SANTERSON manufactures outdoor furniture alongside the interior fixtures and building materials that surround it, so a single enquiry can cover the terrace dining sets, matching lounge collections and the finishes behind them. Send your drawings, zone list and finishes schedule to our team and we will quote against the specification you provide.