A swim spa quotation only works when the specification behind it is complete. This guide shows procurement teams, villa owners and project designers how to write a clear, checkable specification for our Outdoor Swim Spa WS-SP500, so the shell, equipment, power supply and site preparation all arrive as one agreed package.
Most disagreements over an outdoor swim spa start with a purchase enquiry that says only the model number. Two identical model codes can be supplied with different pumps, different treatment options and different insulation levels, so the price difference looks unexplained until someone writes down what is actually included. A written specification removes that gap before production begins.
1. Start with the shell dimensions and the room around them
The catalogue entry for this model lists 5000 × 2500 × 1600 mm. Put those three numbers in your specification, then add what the site drawing has to allow for: access route from the delivery vehicle, crane or forklift clearance, the working space needed for the equipment compartment, and the position of the steps if they are part of the order.
Write the dimensions as maximum overall envelope, not internal water volume. If the spa sits on a deck, a terrace or a plinth, state the load path and who is responsible for the supporting structure. That single line usually prevents the most expensive change order later.
2. List the standard equipment item by item
The published specification for this configuration records one control system, one swim training system, one filter pump, six water jets and four LED lights. Copy that structure into your own document and keep a column for "included as standard" and a column for "requested option". Never merge the two.
| Specification line | What to state in your document |
|---|---|
| Model reference | The exact catalogue model code, plus any variant suffix used on the quotation |
| Overall dimensions | Length × width × depth from the catalogue, with the site tolerance you require |
| Control system | Quantity and control location; confirm the supplier's standard set-up |
| Swim training system | One set as catalogued; note whether adjustable flow settings are required |
| Filtration | Filter pump quantity, filtration method and the service access point |
| Water jets | Total number and seating zone layout, so jet count matches how people actually use the water |
| Lighting | Number of LED fittings and the control grouping |
| Water treatment | Ozone as a catalogued feature; add UV sterilisation only if you want it specified |
| Total power | The catalogue total power figure, followed by your site supply details |
The same shell size also appears on the Outdoor Swim Spa WS-SP500-MS, which carries a different jet count, an additional water pump and a higher total power figure. If your budget document simply says "5 m swim spa", the two configurations will look interchangeable when they are not. Keep the model code and the equipment list together in every comparison table you circulate internally.
3. Separate the options from the base unit
Optional accessories catalogued for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. For each one, your specification should record whether it is required, who supplies it and whether it is factory-fitted or installed on site.
- Heat pump — state the target water temperature range and the local climate exposure, because this drives running cost more than any other single option.
- Insulation — state whether the shell, the cabinet or both are insulated; this matters for cooler nights and for energy consumption.
- Sand filtration — confirm where the filter sits and how it is reached for backwashing.
- UV sterilisation — record it as an addition to, not a replacement for, the catalogued ozone feature.
- Steps — fix the side of the spa they attach to before the deck layout is drawn.
4. State the electrical and water conditions you can actually provide
The catalogue records a total power figure for this configuration, but it does not describe your local supply. Your specification must therefore add the available supply: phase, voltage, circuit capacity, the location of the isolator, cable run length and who provides the final connection. The same applies to water filling, drainage and any overflow route.
Ask your supplier to confirm the electrical requirement for the selected configuration in writing, after the option list is fixed. Adding a heat pump or an extra pump changes the load, so the electrical note has to be written last, not first.
5. Add the commercial and delivery terms around the specification
A swim spa rarely arrives alone on a villa or resort site. Group it with the surrounding outdoor furniture, paving, lighting and shading in one project document, then attach the delivery terms: packaging and container loading, freight mode, customs paperwork, and the delivery address. Our logistics and door-to-door delivery service covers freight forwarding, documentation and shipment tracking, which keeps the spa and the rest of the package on one schedule instead of three.
For hospitality and resort projects, also record the number of units, the phased delivery sequence, and who signs off on-site installation and handover. Our installation and after-sales support page describes inspection, warranty coverage, spare parts and maintenance as part of the service scope.
6. When a standard model is not the right answer
If the site geometry or the programme demands something other than a catalogue shell — a curved end, an unusual footprint, or a spa set into a terrace edge — specify it as a custom item instead of forcing a standard code. The Customizable Shape Outdoor Spa covers square, round, oval and curved layouts in an acrylic shell with structural reinforcement, so gardens, terraces and leisure decks can be served without changing the building around the water.
For a custom item, your specification carries more weight, not less: fix the shape, the maximum envelope, the equipment set, the finish colour and the tolerance you will accept on site. Our custom and OEM service covers bespoke material finishes, prototyping and flexible order quantities for project buyers.
A simple checklist before you send the enquiry
- Model code and variant suffix written exactly as catalogued
- Overall dimensions plus site tolerance and access route
- Standard equipment listed line by line, options kept separate
- Electrical supply details confirmed against the final option list
- Filtration, treatment and maintenance access identified on the drawing
- Delivery terms, address and installation responsibility stated
- One named contact for production questions and one for site questions
Send that document with your enquiry and the quotation comes back comparable line by line. If you would like a specification reviewed against the current catalogue configuration, our project team works from your drawings and option list before pricing.
Talk to us about your swim spa specification. Send the model reference, your site drawing and your option list through our contact page, and we will confirm the included equipment, the electrical requirement for that configuration and the delivery plan to your site.