A metal-frame modular wall system is one of the most specification-sensitive items in a villa or apartment fit-out. Nothing here is stock: the frame, shelves, closed modules and lighting are all built around your wall. That means an accurate quotation depends almost entirely on what you send us. Below is the information our team works from when pricing Santerson Metal Frame Modular Systems, and what tends to go wrong at each stage when that information is missing.

Why this product cannot be quoted from a photograph alone

The Metal Frame Modular Systems listing sits in our Modular Shelving Systems range and is described there as configurable shelving for residential wall system projects, with project-specific dimensions and finish options, made-to-measure sizing and selectable materials and finishes. In practice that means every order is engineered to the wall it is going onto: upright spacing sets the bay widths, brackets carry the shelf spans, and the closed modules determine carcass depth and door engineering. Two walls of the same length can need very different amounts of frame, board material and hardware.

A picture tells us the look you want. It does not tell us what a shelf is expected to carry, whether the wall is plasterboard or masonry, or which side a cabinet door should hinge from. Those answers change the profile, the bracket count and the price.

1. Room dimensions and the wall itself

Send us the full run you want covered, not just one elevation. For each wall we need:

  • Total width and height of the run, plus any ceiling void, skirting, cornice or floor finish that reduces the usable height.
  • Position and size of windows, doors, switches, sockets, radiators, air-conditioning grilles and downlights that fall inside the run.
  • Wall construction — masonry, brick veneer, plasterboard on studs or concrete — and whether the wall can take the fixing load of a full-height system.
  • Floor levelness and out-of-plumb readings if you already have them. Frames are adjusted at the base, but large deviations need a site solution agreed before production.
  • Whether the run turns a corner, and if so whether you want a return leg, an angled end module or a butt joint.

A dimensioned drawing (DWG, PDF or an annotated plan with measurements) is far more useful than a photograph. If drawings do not exist yet, tell us — we can advise on the site measurements to take, and our interior design service covers space layout planning, furniture layouts and 3D visual renderings that can be developed into production drawings.

2. Layout: what goes in each bay

Tell us how the system will actually be used, bay by bay. Open display shelving, closed cabinets, drawer units, a desk niche, a media position or a mix of these all price differently. The specifics that matter:

  • Shelf spacing you want, and whether any shelf has to carry heavy items such as books, stone or ceramics.
  • Closed modules: door type, which side the door hinges from, and whether you want handles or a handleless reveal.
  • Drawer and pull-out requirements, including internal fittings such as dividers or soft-close runners.
  • Whether display niches should be recessed into the wall plane or sit proud of it.

If your scheme also covers living-room storage rather than a single shelving run, the same information applies to Santerson Floating Modular Systems and Santerson Floor to Ceiling Modular Systems. Both are listed as configurable systems for residential projects with made-to-measure sizing and material and finish options. The practical difference is how the load is carried: a floating system hangs from a concealed batten frame fixed to the wall, so the wall build-up and fixing positions matter more; a floor-to-ceiling system bears on the floor, which is often the simpler route on lightweight partitions.

3. Frame, board and finish selection

The configuration options for this range cover materials and finishes rather than one fixed specification, so we quote against what you select and confirm the final specification with you before production starts. Please tell us:

ItemWhat to specify
FrameColour or surface treatment for the metal uprights and brackets, and whether the frame should read as a visible design feature or stay minimal.
Shelves and panelsBoard substrate and surface (laminate, lacquer or veneer), the thickness your spans call for, and edge treatment on visible ends.
Closed modulesCarcass colour, door style, and glass type if the doors are glazed — clear, frosted, bronze or ribbed — plus the frame profile around the glass.
HardwareRunner and hinge brand or grade if you have a preference, whether soft-close is required, and handle or push-open.
Matching joineryWhether wardrobes, vanities or kitchen cabinetry in the same project should be matched to this system for colour and grain.

Where a finish has to match an existing or already-specified item, send the make and model reference or a physical sample. A colour name on its own is not enough to match woodgrain or a metallic lacquer reliably.

4. Lighting and services

Integrated lighting is the item most often left out of an enquiry. If you want lit niches or under-shelf lighting, we need to know before the shelves are machined:

  • Which bays or shelves are lit, and whether the light should read warm or neutral.
  • Switching method: wall switch, sensor, or a control system already installed on site.
  • Where the driver will sit and who is running the supply. Cabling routes can be prepared in the factory, but the mains connection stays a site task for your electrician, carried out to local requirements.

The same applies to media: if a television sits inside the system, send the model or its mounting pattern and screen size, plus where you want sockets and signal points hidden. For an integrated lighting layout of this type, see Santerson Modular System with Lighting, and confirm the electrical specification for the configuration you choose.

5. Quantity, site location and delivery terms

For a single home, one set of drawings is enough. For an apartment or villa development we quote per unit type, so please send:

  • Number of units for each typical layout, and how many layouts differ from it.
  • Destination city and site address, plus whether delivery is to site or to a port or depot.
  • Your preferred shipping terms — door-to-door or port delivery — and the delivery window your programme requires.
  • Any packaging or labelling requirement if different trades are installing the units.

Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading. Import duties, taxes and Incoterms are confirmed shipment by shipment rather than assumed, so tell us the destination country early: it affects how each crate is packed and marked.

6. Programme, budget range and approval route

Telling us your target date lets us work backwards: prototyping and sample approval take time, and a made-to-measure system is far harder to correct on site than loose furniture. A budget range is also useful — not as a limit we enforce, but so the specification we propose lands inside it instead of arriving high and then being stripped back.

State who signs off the drawings: an interior designer, a builder, a developer's project manager or the homeowner. Multi-party approvals need a longer drawing round, and that changes how we schedule production.

What you receive back from us

Once we have the above, our process follows the cooperation steps set out on our design service page — project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. A complete enquiry comes back as an itemised quotation by module and drawings for your sign-off before manufacturing starts; after that we build to the specification you confirmed under our custom and OEM service.

Fastest path to a firm quotation: send dimensioned wall elevations, a bay-by-bay function list, your finish preference (or a sample reference), lighting requirements, unit quantities and destination city. With those six items we can normally return an itemised quotation and layout drawings for review rather than a round of follow-up questions.

Preparing a modular wall package for a villa, apartment or development? Send your drawings and the details above to our team, and we will confirm dimensions, materials, hardware and electrical options for the exact configuration before anything goes into production.